Notification of Conduct of a Triennial Fire Protection Baseline Inspection
ML033580092
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 12/22/2003
From: Rogge J
NRC/RGN-I/DRS/EB
To: Dacimo F
Entergy Nuclear Northeast
References
Download: ML033580092 (6)


Text

December 22, 2003 Mr. Fred Dacimo Site Vice President Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

INDIAN POINT ENERGY CENTER UNIT 2-NOTIFICATION OF CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

Dear Mr. Dacimo:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region I staff will conduct a triennial fire protection baseline inspection at your Indian Point Energy Center Unit 2, beginning in March 2004. The inspection team will be led by Mr. Chris Cahill from the NRC Region I Office. The team will be composed of personnel from NRC Region I. The inspection will be conducted in accordance with IP 71111.05, the NRCs baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

Information gathering visit - February 9-13, 2004 Weeks of onsite inspection - March 1-5 and March 15-19 The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the Indian Point Energy Center Unit 2, fire protection programs, fire protection features, and post-fire safe shutdown capabilities and plant layout, and, as necessary, obtain plant specific site access training and badging for unescorted site access. A list of the types of documents the team may be interested in reviewing, and possibly obtaining, are listed in Enclosure 1. The team leader will contact you with specific document requests.

During the information gathering visit, the team will also discuss the following inspection support administrative details: office space size and location; specific documents requested to be made available to the team in their office spaces; arrangements for reactor site access (including radiation protection training, security, safety and fitness for duty requirements); and the availability of knowledgeable plant engineering and licensing organization personnel to serve as points of contact during the inspection.

We request that during the onsite inspection weeks you ensure that copies of analyses, evaluations or documentation regarding the implementation and maintenance of the Indian

Mr. Fred Dacimo 2

Point Energy Center Unit 2, fire protection program including post-fire safe shutdown capability, be readily accessible to the team for their review. Of specific interest are those documents which establish that your fire protection program satisfies NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance. Also, personnel should be available at the site during the inspection who are knowledgeable regarding those plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room (including the electrical aspects of the relevant post-fire safe shutdown analyses),

reactor plant fire protection systems and features, and the Indian Point Energy Center Unit 2, fire protection program and its implementation.

Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspection teams information or logistical needs, please contact Chris Cahill, the team leader, in the Region I Office at (610) 337-5108.

Sincerely,

/RA/

John F. Rogge, Chief Electrical Branch Division of Reactor Safety Docket No.

50-247 License No.

DPR-26

Enclosures:

List of Reactor Fire Protection Program Supporting Documents cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. R. Kansler, President - Entergy Nuclear Operations, Inc.

J. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, General Manager - Plant Operations D. Pace, Vice President, Engineering R. Edington, Vice President, Operations Support J. McCann, Manager, Nuclear Safety and Licensing J. Kelly, Director, Nuclear Safety Assurance J. Comiotes, Director, Nuclear Safety Assurance C. Faison, Manager, Licensing H. Salmon, Jr., Director of Oversight J. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.

P. Smith, Acting President, New York State Energy, Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority cc w/encl (Contd):

P. Eddy, Electric Division, New York State Department of Public Service

Mr. Fred Dacimo 3

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law T. Walsh, Secretary, NFSC, Entergy Nuclear Operations, Inc.

D. ONeill, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Executive Chair, Four County Nuclear Safety Committee S. Lousteau, Treasury Department, Entergy Services, Inc.

Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning B. Brandenburg, Assistant General Counsel P. Rubin, Operations Manager Assemblywoman Sandra Galef, NYS Assembly C. Terry, Niagara Mohawk Power Corporation County Clerk, Westchester County Legislature A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congresswoman Sue W. Kelly Congresswoman Nita Lowey Senator Hillary Rodham Clinton Senator Charles Schumer J. Riccio, Greenpeace A. Matthiessen, Executive Director, Riverkeepers, Inc.

M. Kapolwitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates M. Jacobs, Director, Longview School D. Katz, Executive Director, Citizens Awareness Network P. Gunter, Nuclear Information & Resource Service P. Leventhal, The Nuclear Control Institute K. Coplan, Pace Environmental Litigation Clinic R. Witherspoon, The Journal News W. DiProfio, PWR SRC Consultant W. Poole, PWR SRC Consultant W. Russell, PWR SRC Consultant W. Little, Associate Attorney, NYSDEC Distribution w/encl:

H. Miller, RA/J. Wiggins, DRA J. Jolicoeur, RI EDO Coordinator D. Lew, DRP

Mr. Fred Dacimo 4

R. Laufer, NRR P. Milano, PM, NRR G. Vissing, PM, NRR (Backup)

W. Cook, DRP T. Jackson, DRP P. Habighorst, SRI - Indian Point 2 M. Cox, RI - Indian Point 2 R. Martin, DRP Region I Docket Room (w/concurrences)

W. Lanning, DRS R. Crlenjak, DRS J. Rogge, DRS C. Cahill, DRS DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML033580092.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS NAME CCahill JRogge DATE 12/22/03 12/22/03 OFFICIAL RECORD COPY

ENCLOSURE Reactor Fire Protection Program Supporting Documentation

[Note: This is a broad list of the documents the NRC inspection team may be interested in reviewing, and possibly obtaining, during the information gathering site visit.]

1.

The current version of the Fire Protection Program and Fire Hazards Analysis.

2.

Current versions of the fire protection program implementing procedures (e.g.,

administrative controls, surveillance testing, fire brigade).

3.

Fire brigade training program and pre-fire plans.

4.

Post-fire safe shutdown systems and separation analysis.

5.

Post-fire alternative shutdown analysis.

6.

Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room and those components used for those areas requiring alternative shutdown capability.

7.

Plant layout and equipment drawings which identify the physical plant locations of hot standby and cold shutdown equipment.

8.

Plant layout drawings which identify plant fire area delineation, areas protected by automatic fire suppression and detection, and the locations of fire protection equipment.

9.

Plant layout drawings which identify the general location of the post-fire emergency lighting units.

10.

Plant operating procedures which would be used and describe shutdown from inside the control room with a postulated fire occurring in any plant area outside the control room, procedures which would be used to implement alternative shutdown capability in the event of a fire in either the control or cable spreading room.

11.

Maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.

12.

Maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis.

13.

A sample of significant fire protection and post-fire safe shutdown related design change packages and Generic Letter 86-10 evaluations.

14.

The reactor plants IPEEE, results of any post-IPEEE reviews, and listings of actions taken/plant modifications conducted in response to IPEEE information.

15.

Temporary modification procedures.

16.

Organization charts of site personnel down to the level of fire protection staff personnel.

2 17.

If applicable, layout/arrangement drawings of potential reactor coolant/recirculation pump lube oil system leakage points and associated lube oil collection systems.

18.

A listing of the SERs which form the licensing basis for the reactor plants post-fire safe shutdown configuration.

19.

Procedures/instructions that control the configuration of the reactor plants fire protection program, features, and post-fire safe shutdown methodology and system design.

20.

A list of applicable codes and standards related to the design of plant fire protection features and evaluations of code deviations.

21.

Procedures/instructions that govern the implementation of plant modifications, maintenance, and special operations, and their impact on fire protection.

22.

The three most recent fire protection QA audits and/or fire protection self-assessments.

23.

Recent QA surveillances of fire protection activities.

24.

A listing of open and closed fire protection condition reports (problem reports/NCRs/EARs/problem identification and resolution reports).

25.

Listing of plant fire protection licensing basis documents.

26.

A listing of the NFPA code versions committed to (NFPA codes of record).

27.

A listing of plant deviations from code commitments.

28.

Actual copies of Generic Letter 86-10 evaluations.