ML033570120
| ML033570120 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Davis Besse, Perry |
| Issue date: | 12/18/2003 |
| From: | Rinckel J FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3015, BL-03-004, L-03-206, PY-CEI/NRR-2756L | |
| Download: ML033570120 (4) | |
Text
C b
.resenowMICUM OC-Ws.' C=VnW'y -%
Jeannie M. Rinckel Director, FENOC Nuclear Fuel Dept.
76 S. Main St.
Akron, Ohio 44308 330-384-5094 December 18,2003 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Beaver Valley Power Station Unit 1 Docket Number 50-334 Operating License No. DPR-66 Davis-Besse Nuclear Power Station Docket Number 50-346 Operating License Number NPF-3 Beaver Valley Power Station Unit 2 Docket Number 50-412 Operating License No. NPF-73 Perry Nuclear Power Plant Docket Number 50-440 Operating License Number NPF-58 BVPS Letter Number L-03-206 DBNPS Letter Serial Number 3015 PNPP Letter PY-CEI/NRR-2756L
Subject:
NRC BULLETIN 2003-04: Rebaselining of Data in the Nuclear Materials Management and Safeguards System (NMMSS)
Ladies and Gentlemen:
This letter is the FirstEnergy Nuclear Operating Company (FENOC) response to NRC Bulletin 2003-04 issued on October 8, 2003. We submitted a request to the NMMSS contractor on December 2, 2003, to confirm our compliance with this bulletin using our most recent Material Status Report (MSR) submittals. The NMMSS contractor acknowledged receipt of our request and that it is now in processing.
The following table represents the information required to process our 2003 MSR submittals for quantities of Special Nuclear Material (SNM) and foreign obligated source material as stated in items (ii) (a) and (b) under Purpose in the Bulletin.
Facility Name RIS Transaction #
Reporting Period Beaver Valley Power Station Unit I XGD 47 10/01/2002 - 07/11/2003 Beaver Valley Power Station Unit 2 XRD 34 10/01/2002 - 07/11/2003 Davis-Besse Nuclear Power Station XGC 44 10/01/2002 - 04/16/2003 Perry Nuclear Power Plant XRW 80 and 81 10/01/2002 - 06/30/2003
BVPS Letter Number L-03-206 DBNPS Letter Serial Number 3015 PNPP Letter PY-CEI/NRR-2756L Page 2 In response to item (iii) under Purpose in the Bulletin, FENOC submits that we do not have in our possession any quantities of other types of Government-owned materials.
FENOC will coordinate with NMMSS staff, the resolution of any discrepancies that become evident, based on a comparison of the results of this one-time reporting, represented by our 2003 MSR submittals, and previously existing licensee nuclear material balances as stated in item (iv) under Purpose in the Bulletin.
There are no new regulatory commitments contained in this submittal. If there are any questions concerning this matter, please contact Ms. Tommilea H. Giegel, Senior Engineer, Nuclear Fuel at 724-682-5236.
Very truly yours, J rinie M. Rinckel D
ec tor, Nuclear Fuel, FirstEnergy Nuclear Operating Company Attachment c: NAC International, NMMSS Project H.J. Miller, Regional Administrator, NRC Region I J.L. Caldwell, Regional Administrator, NRC Region III T.G. Colburn, BV Project Manager J.B. Hopkins, DB NRC/NRR Senior Project Manager S.P. Sands, PY Senior Project Manager P.C. Cataldo, BV Senior NRC Resident Inspector C.S. Thomas, DB Senior Resident Inspector R.J. Powell, PY Senior Resident Inspector
BVPS Letter Number L-03-206 DBNPS Letter Serial Number 3015 PNPP Letter PY-CEI/NRR-2756L Page 3 Bc: J. J. Maracek, BV J. E. Mauck, BV G. F. Zupsic, BV T. H. Giegel, BV J. E. Emley, PY M. L. Laris, PY C. S. Orogvany, PY A. W. Bless, DB D. B. Kelley, DB C. N. Alm, DB D. J. Stephenson, DB
d, I
.Cl
.1 I
BVPS Letter Number L-03-206 DBNPS Letter Serial Number 3015 PNPP Letter PY-CEI/NRR-2756L Attachment, Page 1 COMMITMENT LIST The following list identifies those actions committed to by the FirstEnergy Nuclear Operating Company (FENOC) in this document.
COMMITMENTS DUE DATE NONE N/A