ML033560409
| ML033560409 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/13/2003 |
| From: | NRC/RGN-II |
| To: | |
| References | |
| FOIA/PA-2003-0358 | |
| Download: ML033560409 (1) | |
Text
,@s: a-lsp
'. it;~ /
Harris fp call 2/13 I got the call. (Duncan, Caves, Morton)
- 1. They want to set up a meeting to discuss their plans, schedule and root cause evaluation associated with their fire protection program.
-- 2T2hey-disagree-with-the-characterization-in-the-report-of inadequate-corrective-action associated with the ACP room:
a) They planned to ask for a deviation for these manual actions b) The modification to accept these manual actions was still a work in progress (pending a above) c) They have maintained the compensatory measure of a fire watch in this area since the issue first started.
d) New info-They don't think a loop would occur for a fire in the room. (We had some specific concerns with a subset of the manual actions associated with post-loop fire recovery.)
When I questioned them on whether the procedure implementing the manual actions was a valid procedure that they expected would be used, they said yes.
We can talk about this more upon your RTP.
I briefed Vic.