ML033530384
| ML033530384 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 12/11/2003 |
| From: | Harkness E AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2130-03-20310, GL-97-002 | |
| Download: ML033530384 (2) | |
Text
AmerGen SM
- -- AmerGen Energy Company, LLC Oyster Creek US Route 9 South P.O. Box 388 Forked River, NJ 08731-0388 December 11, 2003 2130-03-20310 An Exelon/British Energy Company GL 97-02 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219
Subject:
Monthly Operating Report - November 2003 Enclosed is the November 2003 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02 If any further information or assistance is needed, please contact William Stewart at 609-971-4775.
Sincerely, Ernest J. Harkness P. E.
Vice President, Oyster Creek Generating Station EJHYWVS Enclosure cc:
H. J. Miller, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 03001
'---'4 Lf
-- J, E,- (--
OPERATING DATA REPORT DOCKET NO.
.V1LtlT NAME DATE COMPLETED BY TELEPHONE 50-219 Oyster Creek 1 December 09, 2003 W. V. Stewart (609) 971-4775 REPORTING PERIOD:
November 2003
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 650.00 619.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 720.00.
720.00 0.00 445,239.00 Yr-to-Date 7,771.92 7,724.45 0.00
! 4,780,091.00 Cumulative 217,693.02 213,451.65 918.20 121,918,519.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments 1
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
- During November, Oyster Creek generated 445,239 net MWh electric, which was 99.9% of its MDC -
rating.
Page 1 of 1