ML033530153
| ML033530153 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/09/2003 |
| From: | Rosalyn Jones Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML033530153 (3) | |
Text
Duke
- Powere A Duke Energy Company R. A. JONES Vice President Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax December 9, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Oconee Nuclear Station Docket Nos. 50-269, -270, and -287 Withdrawal of License Amendment Request for Revisions to the Licensing Basis for the UFSAR Section on Water Level (Flood) Design Technical Specification Change (TSC) Number 2002-06 On November 1, 2002, Duke Energy Corporation (Duke) submitted a License Amendment Request (LAR) regarding revisions to the licensing basis associated with the failure of non-Category I (non-seismic) piping in the Auxiliary Building.
In several discussions between Duke and the Nuclear Regulatory Commission (NRC), it became apparent that there was continuing disagreement with Duke's approach to determining the fragility value used in the seismic analysis.
For this reason, Duke requests that TSC 2002-06 be withdrawn.
Please address any questions to R. V. Gambrell at (864) 885-3364.
Very Tru
- Yours, R.
nes, Site Vice President Ocone uclear Station hA-m0 www. duke-energy. corn
w U. S. Nuclear Regulatory Commission December 9, 2003 Page 2 xc:
L. A. Reyes U. S. Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 L. N. Olshan NRC Senior Project Manager (ONS)
U. S. Nuclear Regulatory Commission Mail Stop 0-14H25 Washington, DC 20555-0001 M. C. Shannon Senior Resident Inspector (ONS)
U. S. Nuclear Regulatory Commission Oconee Nuclear Site H. R. Porter, Director Division of Radioactive Waste Management Bureau of Land & Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29201
U. S. Nuclear Regulatory Commission December 9, 2003 Page 3 R. A. Jones, being duly sworn, states that he is Vice President, Oconee Nuclear Site, Duke Energy Corporation, that he is authorized on the part of said Company to sign and file with the U. S. Nuclear Regulatory Commission this revision to the Facility Operating License Nos. DPR-38, DPR-47, DPR-55; and that all the statements and matters set forth herein are true and correct to the best of his knowledge R. A Jo es, Vice President Oconee uclear Site Subscribe4 and sworn before me this ______day of UAt Zka-,1 2003
'otary Publica A_/A.-
My Commission Expires:
6//L2d 4/3
.~ ~
~~~~nA'
- ~~~~~~~~~