Similar Documents at Surry |
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report ML23073A1822023-03-14014 March 2023 Inservice Inspection Owner'S Activity Report (OAR) ML22108A2242022-04-14014 April 2022 Steam Generator Tube Inspection Report for the Fall 2021 Refueling Outage ML22048B8192022-02-17017 February 2022 Inservice Inspection Owner'S Activity Report (OAR) ML21243A3132021-08-27027 August 2021 Steam Generating Tube Inspection Report for the Spring 2021 Refueling Outage ML21235A0912021-08-23023 August 2021 Inservice Inspection Owner'S Activity Report Ended on June 1, 2021 ML20304A1542020-08-25025 August 2020 Inservice Inspection Owner'S Activity Report ML20101H3072020-03-26026 March 2020 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML20087H0092020-03-11011 March 2020 Steam Generator Tube Inspection Report for the Fall 2019 Refueling Outage ML20136A2532020-02-18018 February 2020 Submittal of Inservice Inspection Owner'S Activity Report for Surry Unit 1 Refueling Outgae s1R29 Which Ended on 11/29/2019 ML19331A9162019-11-27027 November 2019 ASME Section XI Inservice Inspection Program Proposed Alternative Request S2-15-ISI-05 to Use a Mechanical Clamping Device for a One-Inch Main Steam Line Pipe Repair ML19071A1072019-03-0404 March 2019 Inservice Inspection Owner'S Activity Report ML18331A1622018-11-19019 November 2018 Steam Generator Tube Inspection Report for the Spring 2018 Refueling Outage ML18229A0622018-08-10010 August 2018 Inservice Inspection Owner'S Activity Report ML17251A8952017-08-31031 August 2017 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information ML17261A1872017-08-29029 August 2017 Inservice Inspection Owner'S Activity Report ML17121A3782017-04-24024 April 2017 Submittal of Steam Generator Tube Inspection Report for the Fall 2016 Refueling Outage ML17040A4072017-02-0606 February 2017 Inservice Inspection Owner'S Activity Report 1-5-1-2, for Refueling Outage S1R27, First Period of the Fifth ISI Interval ML16355A3462016-12-14014 December 2016 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(Z)(1) ML16141A1172016-05-10010 May 2016 Inspection Report for the Fall 2015 Refueling Outage ML16131A6352016-05-0505 May 2016 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Preformed in the Fourth 10-Year Insevice Inspection Interval ML16081A1672016-03-0101 March 2016 Inservice Inspection Owner'S Activity Report ML15324A0142015-11-0606 November 2015 Steam Generator Tube Inspection Report for the Spring 2015 Refueling Outage ML15293A1242015-10-0909 October 2015 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML15224B3602015-07-31031 July 2015 Inservice Inspection Owner'S Activity Report (OAR) ML14335A6062014-11-19019 November 2014 Response to Request for Additional Information Re 2013 Steam Generator Inservice Inspection Report ML14294A4492014-10-16016 October 2014 Steam Generator Tube Inservice Inspection Report for the Spring 2014 Refueling Outage ML14216A3452014-07-24024 July 2014 Inservice Inspection Owner'S Activity Report ML14133A0062014-05-0707 May 2014 Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests ML14135A3652014-05-0606 May 2014 Steam Generator Tube Inspection Report for the Fall 2013 Refueling Outage ML14056A1942014-02-18018 February 2014 Inservice Inspection Owner'S Activity Report ML13336A1422013-11-26026 November 2013 Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests ML13149A2292013-05-10010 May 2013 Steam Generator Tube Inservice Inspection Report for the Fall 2012 Refueling Outage ML13128A1042013-05-0101 May 2013 Inservice Testing Program for Pumps and Valves Fifth Ten Year Interval Update and Associated Relief Requests ML13056A4122013-02-15015 February 2013 Inservice Inspection Owner'S Activity Report (OAR) ML12321A0472012-10-30030 October 2012 Steam Generator Tube Inservice Inspection Report for the Spring 2012 Refueling Outage ML12242A3472012-08-16016 August 2012 Inservice Inspection Owner'S Activity Report (OAR) ML11291A0582011-10-0505 October 2011 Steam Generator Tube Inservice Inspection Report for the 2011 Refueling Outrage ML11264A0362011-09-0606 September 2011 Inservice Inspection Owner'S Activity Report (OAR) ML11154A1012011-05-24024 May 2011 Steam Generator Tube Inservice Inspection Report for the 2010 Refueling Outage ML1130802582011-02-21021 February 2011 Inservice Inspection Owner'S Activity Report ML1015305332010-05-24024 May 2010 Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage ML1006804222010-02-25025 February 2010 Inservice Inspection Owner'S Activity Report (OAR) ML0932002072009-11-0404 November 2009 Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage ML0923002302009-08-0707 August 2009 Inservice Inspection Owner'S Activity Report ML0900601112008-11-14014 November 2008 Steam Generator Tube Inservice Inspection Report for the 2008 Refueling Outage ML0824603182008-08-12012 August 2008 Inservice Inspection Owner'S Activity Report ML0815602162008-05-21021 May 2008 Steam Generator Tube Inservice Inspection Report for the 2007 Refueling Outage ML0806406572008-02-22022 February 2008 Inservice Inspection Owner'S Activity Report (Form OAR-1), Refueling Outage S1R21, Second Period of the Fourth Ten-Year ISI Interval 2023-08-30
[Table view] Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] |
Text
- I.-
VIRGINIA ELECTRIC AND PO V~ER COMPANY RiCnTVlOND, VIRGINIA 23261 Re: 10 CFR 2.202 December 5, 2003 U.S. Nuclear Regulatory Commission Serial No.: 03-571A Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555-0001 Docket Nos.: 50-280/281 License Nos.: DPR-32/37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNITS 1 AND 2 ORDER FOR INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS PRESERVICE INSPECTION OF REPLACEMENT REACTOR PRESSURE VESSEL HEAD AND PRESSURE RETAINING COMPONENTS ABOVE THE RPV HEAD On February 11, 2003, the Nuclear Regulatory Commission (NRC) issued an Order for Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactor licensees. The Order requires specific inspection of the reactor pressure vessel (RPV) head and associated penetration nozzles at pressurized water reactors (PWRs). The Commission stated that the actions in the Order are interim measures that are necessary to ensure that licensees implement and maintain appropriate measures to inspect and, as necessary, repair RPV heads and associated penetration nozzles. The Order required that licensees immediately start implementation of the requirements of the Order and report the results of the required inspections. As required by Section IV.E of the Order, Virginia Electric and Power Company (Dominion) is providing the results of the preservice inspection of the Surry Units 1 and 2 replacement RPV heads and pressure retaining components above the RPV head.
During the 2003 refueling outages, the Surry Units 1 and 2 reactor vessel heads were replaced. Prior to the replacement, the new heads were inspected to satisfy ASME Section Xi requirements for pre-service inspection and to establish a baseline for future anticipated inspections required by ASME Code or that might be required by future regulation. The inspections conducted for the ASME Code preservice requirement included ultrasonic (UT) and magnetic particle (MT) examination of the head dome to flange weld for Surry Unit 1 (Surry Unit 2 is a one-piece forged construction RPV head) and liquid penetrant (LP) examination of the control rod drive mechanism (CRDM) housing to CRDM adapter welds. In addition, non-Code required examinations were preformed on the RPV heads. Each CRDM housing to head weld was LP inspected and each CRDM housing was UT inspected from the bottom of the housing to above
the top surface of the head (at least 2 inches above the housing to head weld).
Furthermore, each CRDM housing to CRDM adapter weld was UT inspected. No relevant indications were noted. These examinations comply with and exceed the requirements of the NRC Order (EA-03-009).
Although a formal bare-metal visual examination was not specifically performed on the Surry Unit 1 replacement RPV head, the replacement head was observed during the above referenced NDE examinations, cleaning and packaging activities, as well as during subsequent activities associated with head installation (e.g., CRDM canopy seal and RCS vent line welding and installation of the new insulation package). During these activities, it was noted that the replacement head and the pressure-retaining components above the RPV head were clean and free of any evidence of corrosion, boric acid residue, or any other condition that could either interfere with any future bare-metal visual examination or complicate the interpretation of the results of a future bare-metal visual examination. These observations included 100% of the surface of the head including 3600 around each head penetration. Separately, a formal bare-metal visual examination was performed on the Surry Unit 2 replacement RPV head. Consequently, we conclude that we are in compliance with the Order (EA-03-009) relative to the initial bare-metal visual inspections for both Surry Units 1 and 2.
If you have any questions, please contact Mr. Thomas Shaub at (804) 273-2763.
Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering Commitments made in this letter: None
cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Federal Atlanta Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station Mr. C. Gratton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8-G9 Rockville, MD 20852 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station
SN: 03-571A Docket Nos.: 50-280/-281
Subject:
Response to RPV Head and Penetration Nozzles Inspection Order COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Leslie N. Hartz who is Vice President - Nuclear Engineering of Virginia Electric and Power Company. She has affirmed before me that she is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of her knowledge and belief.
Acknowledged before me this5- day of TŽC.)lh , 2003.
My Commission Expires: i3! 3I I {
- NSLotary ublic N~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
A: SE