November 17, 2003 Paul D. Hinnenkamp Vice President - Operations River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, LA 70775
Subject:
REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY
Dear Mr. Hinnenkamp:
The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.
The Divisions inspection duties were formerly divided among three branches:
Operations Branch Operator licensing Identification and Resolution of Problems (PI&R)
Plant Support Branch Security Radiological Controls Emergency Preparedness Engineering & Maintenance Branch Safety System Design and Performance Capability Permanent Plant Modifications Inservice Inspection Activities Evaluation of Changes, Tests or Experiments Fire Protection Heat Sink Performance Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:
Operations Branch Initial Operator Licensing Operator Requalification Program Emergency Preparedness PI&R Support Performance Evaluation Branch PI&R Lead Responsibility Fire Protection Heat Sink Performance Maintenance Effectiveness
Entergy Operations, Inc. Engineering Branch Safety System Design and Performance Capability Permanent Plant Modifications Inservice Inspection Activities Evaluation of Changes, Tests or Experiments PI&R Support Plant Support Branch Security Radiological Controls PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.
Sincerely,
/RA/
Dwight D. Chamberlain, Director Division of Reactor Safety
Enclosure:
as stated Docket: 50-458 License: NPF-47 cc w/enclosure Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, LA 70775
Entergy Operations, Inc. Director - Nuclear Safety River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, LA 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 Mark J. Wetterhahn, Esq.
Winston & Strawn 1401 L Street, N.W.
Washington, DC 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, LA 70775 The Honorable Richard P. Ieyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, LA 70775 Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, LA 70821-4313 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78711-3326
Entergy Operations, Inc. Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (PJA)
Branch Chief, DRP/B (DNG)
Senior Project Engineer, DRP/B (RAK1)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
ADAMS: G Yes G No Initials: ______
G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive C:EMB C:OB C:PSB C:PBB D:DRS CSMarschall/lmb ATGody TWPruett DNGraves DDChamberlain
/RA/
/RA/
/RA/
/RA/
/RA/
11/13/03 11/10/03 11/13/03 11/13/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax