ML033490663

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report (Colr), Cycle 15, Revision 24
ML033490663
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 12/09/2003
From: Jamil D
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML033490663 (2)


Text

bF Duke D.M. JAMIL rE'Power, Vice President A Duke Energy Company Duke Power Catawba Nuclear Station 4800 Concord Rd. / CN0I VP York, SC 29745-9635 803 831 4251 803 831 3221 fax December 9, 2003 U.S. Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, D.C. 20555-0001

Subject:

Duke Energy Corporation Catawba Nuclear Station Unit 1 Docket No.: 50-413 Core Operating Limits Report (COLR)

Catawba Unit 1 Cycle 15, Revision 24 Attached, pursuant to Catawba Technical Specification 5.6.5, is an information copy of the Core Operating Limits Report for Catawba Unit 1 Cycle 15. The Unit 1 COLR is being revised to update the limits of the new reload core.

An electronic copy of the COLR Appendix A is included with the letter to the NRC Document Control Desk on an enclosed computer disk. The COLR Appendix A contains the power distribution monitoring factors.

This letter, attached COLR, and computer disk do not contain any new commitments.

Please direct any questions or concerns to George Strickland at (803) 831-3585.

Sincerely, D. M. Jamil Attachment www. duke-energy. corn

U. S. Nuclear Regulatory Commission December 9, 2003 Page 2 xc wlatt: L. A. Reyes, Regional, Administrator USNRC, Region II S. E. Peters, NRR Project Manager (CNS)

USNRC, ONRR E. F. Guthrie Senior Resident Inspector (CNS)