December 19, 2003 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1
SUBJECT:
SUMMARY
OF MEETING ON APRIL 4, 2003, TO DISCUSS THE RESULTS OF THE REACTOR VESSEL INCORE MONITORING INSTRUMENTATION NOZZLES REACTOR COOLANT LEAKAGE SIMULATION TESTS On April 4, 2003, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with FirstEnergy Nuclear Operating Company (the licensee), representatives at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, MD. The meeting was also video-conferenced with NRC staff at Region III. The purpose of the meeting was to discuss the results of the reactor vessel incore monitoring instrumentation (IMI) nozzles reactor coolant leakage simulation tests. The meeting was a Category 1 public meeting with an audioconference bridge available for those unable to attend in person. The licensees presentation slides are available on the NRC Web site for the meeting. Enclosure 1 is a list of attendees.
The licensee presented background information on the reactor vessel incore monitoring instrumentation nozzles, and discussed the reactor vessel inspection results where boron and rust trails were observed on the sides and bottom of the reactor vessel. The licensee then presented information concerning simulation tests of IMI nozzle leakage conducted at Framatome-ANP test facility in Lynchburg, VA.
The licensee stated that they intend to perform visual inspections of the IMI nozzles with reactor coolant pressure at 250 psig and after a seven day hold period at Mode 3 operating pressure.
The licensee discussed their plans to install a online leak monitoring system (FLUS) to detect under vessel leakage in the future. The licensee also stated that they intend to perform a mid-cycle inspection of the IMI nozzles.
The NRC staff asked questions concerning reporting requirements, correlation of leak rates to crack sizes, and radiological dose estimates for performing chemical swipes. The meeting adjourned with the staff stating that they would continue to follow the licensees plans and inspections of the IMI nozzles.
/RA/
Jon B. Hopkins, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. Attendance List
- 2. Meeting Slides cc w/encls: See next page
December 19, 2003 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1
SUBJECT:
SUMMARY
OF MEETING ON APRIL 4, 2003, TO DISCUSS THE RESULTS OF THE REACTOR VESSEL INCORE MONITORING INSTRUMENTATION NOZZLES REACTOR COOLANT LEAKAGE SIMULATION TESTS On April 4, 2003, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with FirstEnergy Nuclear Operating Company (the licensee), representatives at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, MD. The meeting was also video-conferenced with NRC staff at Region III. The purpose of the meeting was to discuss the results of the reactor vessel incore monitoring instrumentation (IMI) nozzles reactor coolant leakage simulation tests. The meeting was a Category 1 public meeting with an audioconference bridge available for those unable to attend in person. The licensees presentation slides are available on the NRC Web site for the meeting. Enclosure 1 is a list of attendees.
The licensee presented background information on the reactor vessel incore monitoring instrumentation nozzles, and discussed the reactor vessel inspection results where boron and rust trails were observed on the sides and bottom of the reactor vessel. The licensee then presented information concerning simulation tests of IMI nozzle leakage conducted at Framatome-ANP test facility in Lynchburg, VA.
The licensee stated that they intend to perform visual inspections of the IMI nozzles with reactor coolant pressure at 250 psig and after a seven day hold period at Mode 3 operating pressure.
The licensee discussed their plans to install a online leak monitoring system (FLUS) to detect under vessel leakage in the future. The licensee also stated that they intend to perform a mid-cycle inspection of the IMI nozzles.
The NRC staff asked questions concerning reporting requirements, correlation of leak rates to crack sizes, and radiological dose estimates for performing chemical swipes. The meeting adjourned with the staff stating that they would continue to follow the licensees plans and inspections of the IMI nozzles.
/RA/
Jon B. Hopkins, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. Attendance List
- 2. Meeting Slides cc w/encls: See next page DISTRIBUTION:
PUBLIC PDIII-2 Reading JHopkins OGC ACRS/ACNW TMarsh ELeeds WRuland AMendiola THarris MKotzalas CLipa, RIII PKG.: ML033490221 ADAMS Accession Number: ML033490190 Meeting Slides: ML033490234 OFFICE PDIII-2/PM PDIII-2/LA PDIII-1/SC NAME JHopkins PCoates for, THarris AMendiola DATE 12-18-03 12-18-03 12-18-03 OFFICIAL RECORD COPY
ATTENDANCE LIST NRC MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY DAVIS-BESSE IMI NOZZLES LEAKAGE SIMULATION APRIL 4, 2003 J. Powers, FENOC G. Leidich, FENOC C. Hengge, FENOC K. Spencer, FENOC S. Fyfitch, Framatome-ANP D. Waskey, Framatome-ANP P. Sherburne, Framatome-ANP B. Grambau, Framatome-ANP S. Frantz, Morgan Lewis A. Mendiola, NRC H. Nieh, NRC W. Dean, NRC W. Bateman, NRC A. Hiser, NRC J. Hopkins, NRC S. Bloom, NRC S. Coffin, NRC E. Sullivan, NRC W. Cullen, NRC K. Gott, NRC (SKI)
S. Long, NRC J. Collins, NRC S. Burnell, NRC M. Weston, NRC A. Marion, NEI S. Hunt, Dominion Engineering P. Gunter, NIRS D. Horner, McGraw-Hill G. Wright, Gannett News Service M. Rulon, Associated Press ENCLOSURE 1
Davis-Besse Nuclear Power Station, Unit 1 cc:
Mary E. OReilly FirstEnergy Corporation 76 South Main St.
Akron, OH 44308 Manager - Regulatory Affairs FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State - Route 2 Oak Harbor, OH 43449-9760 Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60523-4351 Michael A. Schoppman Framatome ANP 1911 N. Ft. Myer Drive Rosslyn, VA 22209 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Randel J. Fast, Plant Manager FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State - Route 2 Oak Harbor, OH 43449-9760 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General Department of Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH 43604-6506 David Lochbaum, Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20006 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515 The Honorable Dennis J. Kucinich, Member United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107 Mr. James P. Riccio Nuclear Policy Analyst Greenpeace 702 H. Street, NW, Suite 300 Washington, DC 20001 Paul Gunter Director Nuclear Watchdog Project Nuclear Information & Resource Service 1424 16th Street NW Suite 401 Washington, DC 20009