FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 December 11, 2003 L-2003-303 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
, Jr.
Vie PfS ~t St. Lucie Plant WJ/spt Attachments an FPL Group company
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit 1 December 8, 2003 W. D. Mead, Jr.
(772) 467-7293 REPORTING PERIOD: November 2003
- 1. Design Electrical Rating (Mwe-Net)- --
- 2. Maximum Dependable Capacity (Mwe-Net)__
830 839
- 3. Number of Hours Reactor Critical__-
- 4. Number of Hours Generator On Line
- 5. Unit Reserve Shutdown Hours_
- 6. Net Electrical Energy (MWH)
H _____
MONTH 720 720 0.0 615445
-YTD-8016 8016 0.0 6864833 CUMULATIVE 192800 190966.3 0.0 156460967
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50 -335 St. Lucie Unit I December 8, 2003 W. D. Mead, Jr.
(772) 467-7293 REPORT MONTH: November 2003 Unit I operated at essentially full power through the entire month of November.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves (PORV) or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit I December 8, 2003 W. D. Mead, Jr.
(772) 467-7293 REPORT MONTH: November 2003 Number Date Typel Duration Reason 2 Method of Cause & Corrective l
(Hours)
Shutting Down Action to l
I Reactor3 Prevent Recurrence Unit 1 operated at essentially full power for the entire month of November.
1 2
F Forced S Scheduled 3
Reason A - Equipment Failure (Explain)
B -Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G -Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 December 8, 2003 W. D. Mead, Jr.
(772) 467-7293 REPORTING PERIOD: November 2003
- 1. Design Electrical Rating (Mwe-Net)----
- 2. Maximum Dependable Capacity (Mwe-Net)__
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line_
- 5. Unit Reserve Shutdown Hours_
- 6. Net Electrical Energy (MWH H)._
830 839 MONTH 720 720 0.0 610849
-YTD-6674.2 6569.45 0.0 5449227 CUMULATIVE 155432.8 153569.75 0.0 126607940
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 December 8, 2003 W. D. Mead, Jr.
(772) 467-7293 REPORT MONTH: November 2003 Unit 2 operated at essentially full power through the entire month of November.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves (PORV) or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 December 8, 2003 W. D. Mead, Jr.
(772) 467-7293 REPORT MONTH: November 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours)
Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of 1
N ovem b er.
1 F Forced S Scheduled 2
3 Reason A - Equipment Failure (Explain)
B - Maintenance or Test C -Refueling D: Regulatory Restriction E-Operator Training & License Examination F-Administrative G - Operational Error (Explain)
H -Other (Explain)
Method 1 - Manual 2-Manual Scram 3 -Automatic Scram 4-Continued 5 - Load Reduction 9 - Other (Explain)