Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 December 11, 2003 FPL L-2003-303 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
, Jr.
Vie PfS ~t St. Lucie Plant WJ/spt Attachments an FPL Group company
DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORTING PERIOD: November 2003
- 1. Design Electrical Rating (Mwe-Net)- -- 830
- 2. Maximum Dependable Capacity (Mwe-Net)__ 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical__- 720 8016 192800
- 4. Number of Hours Generator On Line _ 720 8016 190966.3
- 5. Unit Reserve Shutdown Hours_ _ 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) H _____ 615445 6864833 156460967
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50 -335 UNIT: St. Lucie Unit I DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: November 2003 Unit I operated at essentially full power through the entire month of November.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves (PORV) or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: November 2003 Number Date Typel Duration Reason 2 Method of Cause & Corrective l (Hours) Shutting Down Action to l . _ I __ ___ ___ Reactor3 Prevent Recurrence Unit 1 operated at essentially full power for the entire month of November.
1 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B -Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G -Operational Error (Explain)
H - Other (Explain)
DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORTING PERIOD: November 2003
- 1. Design Electrical Rating (Mwe-Net)---- 830
- 2. Maximum Dependable Capacity (Mwe-Net)__ 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical 720 6674.2 155432.8
- 4. Number of Hours Generator On Line_ - 720 6569.45 153569.75
- 5. Unit Reserve Shutdown Hours_ _ 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH H)._ 610849 5449227 126607940
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: November 2003 Unit 2 operated at essentially full power through the entire month of November.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves (PORV) or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: November 2003 Number Date Typel Duration Reason2 Method of Cause &Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence 1 ____________________ .
Unit 2 operated at essentially full power for the entire month of Novem b er.
1 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Scram C -Refueling 3 -Automatic Scram D: Regulatory Restriction 4- Continued E- Operator Training & License Examination 5 - Load Reduction F- Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H -Other (Explain)
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 December 11, 2003 FPL L-2003-303 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
, Jr.
Vie PfS ~t St. Lucie Plant WJ/spt Attachments an FPL Group company
DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORTING PERIOD: November 2003
- 1. Design Electrical Rating (Mwe-Net)- -- 830
- 2. Maximum Dependable Capacity (Mwe-Net)__ 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical__- 720 8016 192800
- 4. Number of Hours Generator On Line _ 720 8016 190966.3
- 5. Unit Reserve Shutdown Hours_ _ 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) H _____ 615445 6864833 156460967
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50 -335 UNIT: St. Lucie Unit I DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: November 2003 Unit I operated at essentially full power through the entire month of November.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves (PORV) or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: November 2003 Number Date Typel Duration Reason 2 Method of Cause & Corrective l (Hours) Shutting Down Action to l . _ I __ ___ ___ Reactor3 Prevent Recurrence Unit 1 operated at essentially full power for the entire month of November.
1 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B -Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G -Operational Error (Explain)
H - Other (Explain)
DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORTING PERIOD: November 2003
- 1. Design Electrical Rating (Mwe-Net)---- 830
- 2. Maximum Dependable Capacity (Mwe-Net)__ 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical 720 6674.2 155432.8
- 4. Number of Hours Generator On Line_ - 720 6569.45 153569.75
- 5. Unit Reserve Shutdown Hours_ _ 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH H)._ 610849 5449227 126607940
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: November 2003 Unit 2 operated at essentially full power through the entire month of November.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves (PORV) or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: December 8, 2003 COMPLETED BY: W. D. Mead, Jr.
TELEPHONE: (772) 467-7293 REPORT MONTH: November 2003 Number Date Typel Duration Reason2 Method of Cause &Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence 1 ____________________ .
Unit 2 operated at essentially full power for the entire month of Novem b er.
1 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Scram C -Refueling 3 -Automatic Scram D: Regulatory Restriction 4- Continued E- Operator Training & License Examination 5 - Load Reduction F- Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H -Other (Explain)