ML033460410

From kanterella
Jump to navigation Jump to search

Tech Spec Page for Amendment 252 Containment Spray System
ML033460410
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/04/2003
From:
NRC/NRR/DLPM
To:
References
TAC MB8760
Download: ML033460410 (1)


Text

CONTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION. COOLING, AND pH CONTROL SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two independent containment spray systems shall be OPERABLE with each spray system capable of taking suction from the R\NT on a Containment Spray Actuation Signal (CSAS) and automatically transferring suction to the containment sump on a Recirculation Actuation Signal (RAS). Each spray system flow path from the containment sump shall be via an OPERABLE shutdown cooling heat exchanger.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

With one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.2.1 Each containment spray system shall be demonstrated OPERABLE:

a. At least once per 31 days by:
1. Verify each containment spray manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.
2. Verifying that the system piping is full of water from the RWT to at least elevation 505' (equivalent to > 12.5% indicated narrow range level) in the risers within the containment.
b. Verify each containment spray pump's developed head at the flow test point is greater than or equal to the required developed head when tested pursuant to the Inservice Testing Program.

ARKANSAS - UNIT 2 3/4 6-10 Amendment No. 494,M3, 252