FENOC -

FirstEnergy Nuclear Operating Company 5507 North State Route 2 Oak Harbor, Ohio 43449 Lew w. MjefS Chief Operating Officer 419-327-7599 Fax: 419-327-7582 Docket Number 50-346 License Number NPF-3 Serial Number 1-1340 December 3, 2003 Mr. James L. Caldwell, Regional Administrator United States Nuclear Regulatory Commission, Region I11 801 Warrenville Road Lisle, IL 60532-435 1

Subject:

DBNPS Cycle 14 Mid-Cycle Outage Work Scope

Dear Mr. Caldwell:

As discussed during November 12, 2003 USNRC Oversight Panel Public Meeting, this letter provides information regarding the preliminary work scope for the Davis-Besse Nuclear Power Station (DBNPS) upcoming Cycle 14 Mid-Cycle Outage. This submittal transmits the current Level One Schedule, Attachment 1, with the Cycle 14 Mid-Cycle Outage target of 1 st Quarter 2005. This is contingent on submittal and approval of the License Amendment Request (LAR 03-001 9) to extend the Steam Generator (S/G) Technical Specification Surveillance Requirement 3/4.4.5 to permit a one time extension of the S/G tube inservice inspection interval. If this one-time LAR is not approved the Mid-Cycle will begin spring 04 as detailed in Attachment 1.

Activities currently scheduled for the Cycle 14 Mid-cycle Outage include:

0 S/G Tube Inservice Inspection 0

Incore Nozzle Inspection 0

0 0

0 0

Control Rod Drive Nozzle Inspection Reactor Vessel Bare Head Inspection Boric acid corrosion inspection of the Reactor Coolant System Surveillance Testing to support operation to Spring 2006 Contingency Plans for Loop 2 Reactor Coolant Pump Gasket Replacement There are no new regulatory commitments contained in this letter. If there are any questions concerning this matter, please contact Mr. Kevin L. Ostrowski, Manager - Regulatory Affairs at 419-321-8450.

Sincerely, n

L JCS/s

Docket Number 50-346 License Number NPF-3 Serial Number 1-1340 Page 2 Attachments cc:

U.S. NRC Document Control Desk John A. Grobe, Chairman NRC 0350 Panel DB-1 NRC/NRR Senior Project Manager DB-1 NRC Region I11 Senior Resident Inspector Utility Radiological Safety Board

Docket Number 50-346 License Number NPF-3 Serial Number 1-1340, Page 1 of 1 DBNPS Level One Schedule Cycle 14 Mid-Cycle Outage, dated 11/25/03 HDR" RCS TO FLANGE Roder Hengge Roder

=INCORE N O m E INSPECTION mRCS BELOW RV FLANGE (26 INCHES )EMw) mcRoN0ZLElNSPECTlON Hewe L U B A n c RCS INSPECllON peny L

O T

S G

WORKSETUP Baumgardner m8ME HEAD INSPECTlON

-0ge

-EDDY CURRENTTESTING OTSG 1-1 Baumgardner Baumgardner

-EDDY CURRENTTESTING O M

1-2

-RCP LOOP 2 GASKET REPLACEMENT (CONTINGENCY) wvmer H R C S BELOW FLANGE (26 INCHES FINAL) aRESTAFlT R W N E S S MEI'ING Rcder Bezilla

-RCSRU&VENTEDTOPLANTHEANPTOMODE4 Roder

.ENTER MODE 4 (STARTUP)

Roder

@PRWRM NU TEMP I PRES-C%kiNSPE&&

Bdes

-PUNT HEATUP AND RX STARTUP Roder XSYNCTO GRID FINAL Roder

~

T U

R

~

WARMING I SYNC TO GRID I POWER EscALATloN Roder

+RXATlW%POWER Roder ASSUMPTIONS

1. RCP LOOP 2 CONTINGENCY PLAN BASED ON GASKET INSPECTION SCOPE AND DURATION TO BE DETERMINED
2. PERFORM SURVEILLANCES REQUIRED TO RUN UNTIL SPRING 06
3. MARCH 06,2004 IS CONTINGENT START DATE.

IF THE LICENSE AMENDMENT TO EXTEND THE OTSG SURVEILLANCE REQUIRMEMS IS APPROVED THEN THE MIDCYCLE START DATE 1s TARGETED FOR JAN 21.2005

Docket Number 50-346 License Number NPF-3 Serial Number 1-1340, Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager Regulatory Affairs (419-32 1-8450) at Davis-Besse of any questions regarding this document or associated regulatory commitments.