Schedule for Submittal of Generic Control Room Habitability Specifications
ML033370814
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/26/2003
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-03-001
Download: ML033370814 (2)


Text

SOUTHERN CALIFORNIA A. Edward Sclherer

~Es D ISO N s?:

Manager of EDISON Nuclear Regulatory Affairs An EDISON INTERNATIONAL9 Company November 26, 2003 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Schedule for Submittal of Generic Control Room Habitability Technical Specifications San Onofre Nuclear Generating Station Units 2 and 3

References:

1.

NRC Generic Letter 2003-01, 'Control Room Habitability," dated June 12, 2003

2.

Letter from A. E. Scherer (SCE) to Document Control Desk (NRC), dated August 5, 2003,

Subject:

"Docket Nos. 50-361 and 50-362, Response to Generic Letter 2003-01, Control Room Habitability, San Onofre Nuclear Generating Station, Units 2 and 3"

Dear Sir or Madam:

Generic Letter (GL) 2003-01, "Control Room Habitability," (Reference 1) requested that licensees provide certain information within 180 days or provide a written response within 60 days that described alternative courses of action. Southern California Edison (SCE) provided a 60-day response to GL 2003-01 on August 5, 2003 (Reference 2).

Reference 2 provided a schedule for revising the Technical Specifications (TSs) to provide a surveillance requirement that provides an acceptable method for measuring control room inleakage (e.g., ASTM-E741). SCE committed to submit a license amendment request by December 9, 2003, which is within 180 days from issuance of GL 2003-01.

SCE has been following the review and approval process of Technical Specification Task Force (TSTF) 448. TSTF 448 provides a standard TS for control room habitability and control room inleakage testing. In order to be consistent with the final form of the standard TS, SCE is revising our commitment to submit the revised TSs. SCE will submit a proposed TS change within 90 days following approval of TSTF 448.

P.O. Box 128 pA {02-San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575

Document Control Desk November 26, 2003 If you have any question or require additional information, please contact Mr. Jack Rainsberry at 949-368-7420.

Sincerely, cc:

B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3