AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
+
SR 3.8.1.9 NOTE
- 1.
Credit may be taken for unplanned events that satisfy this SR.
I
- 2.
If performed with DG synchronized with offsite power, it shall be performed at a power factor
- 0.9 Verify each DG rejects a load greater than or equal to its associated single largest post accident load and following load rejection, the engine speed is maintained less than nominal plus 75% of the difference between nominal speed and the overspeed trip setpoint or 15% above nominal, whichever is lower.
18 months SR 3.8.1.10 KrIrTC IMLN I C_-
Credit may be taken for unplanned events that satisfy this SR.
I Verify each DG operating at a power factor
- 0.9 does not trip and voltage is maintained
- 5400 V for DG 1C during and following a load rejection of a load 2 3030 kWand
< 3130 kW for DGs 1A and 1 B and 2 2500 kW and
' 2600 kW for DG C.
18 months (continued)
RIVER BEND 3.8-8 Amendment No. 81 141433, 137