Technical Specifications Pages for Amendments 163 & 148 to Licenses NPF-11 & NPF-18, Respectively, Revision of Appendix a Turbine Bypass Valve Testing
ML033300283
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/13/2003
From: Macon W
NRC/NRR/DLPM/LPD3
To:
Shared Package
ML033300313 List:
References
Download: ML033300283 (1)


Text

Main Turbine Bypass System 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Main Turbine Bypass System LCO 3.7.7 The Main Turbine Bypass System shall be OPERABLE.

LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the COLR, are made applicable.

APPLICABILITY:

THERMAL POWER 2 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the A.1 Satisfy the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> LCO not met.

requirements of the LCO.

B. Required Action and B.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion to < 25% RTP.

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.7.1 Verify one complete cycle of each main 31 days turbine bypass valve.

(continued)

I LaSalle 1 and 2 3.7. 7-1 Amendment No.1163/148