Main Turbine Bypass System 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Main Turbine Bypass System LCO 3.7.7 The Main Turbine Bypass System shall be OPERABLE.
LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the COLR, are made applicable.
APPLICABILITY:
THERMAL POWER 2 25% RTP.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the A.1 Satisfy the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> LCO not met.
requirements of the LCO.
B. Required Action and B.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion to < 25% RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.7.1 Verify one complete cycle of each main 31 days turbine bypass valve.
(continued)
I LaSalle 1 and 2 3.7. 7-1 Amendment No.1163/148