ML033290377

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Palo Verde, Units 1, 2, and 3
ML033290377
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/14/2003
From: Danni Smith
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
219-02877-DMS/JMM
Download: ML033290377 (5)


Text

A it A subsidiary of Pinnacle West Capital Corporation David M. Smith Operations Director Palo Verde Nuclear Generating Station Tel. 602-393-2656 Fax 602-393-1806 e-mail:

David M Smith(eapsc.com Mail Station 7294 PO Box 52034 Phoenix, Arizona 85072-2034 It November 14, 2003 21 9-02877-DMS/JMM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for OCTOBER 2003 Enclosed are the Monthly Operating Reports for OCTOBER 2003, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Judy Mellody at (623) 393-6422.

incerely, DMS/JMM/mb

Enclosures:

OCTOBER 2003 Monthly Operating cc:

(all w/enclosures)

Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute

Page Two NRC Monthly Operating Report Distribution List 219-02877-DMS/JMM November 14, 2003 bcc:

(all wlenclosures)

W. L. Stewart (9082)

J. M. Levine (9046)

G. R. Overbeck (7602)

C. D. Mauldin (7605)

C. K. Seaman (7636)

M. W. Van Dop (7512)

K. F. Porter (7512)

D. L. Sills (7527)

M. K. Banks (7615)

S. M. Foote (8508)

C. L. Jury (8983)

J. R. Medina (2260)

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-528 PVNGS-1 11/06/03 J. M. Mellodv (623) 393-6422 Reporting Period:

October 2003

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 3.

4.

5.

6.

Unit Generating Statistics ThisMonth

-Yr.

to Date Cumulative Hours Reactor was Critical 744.0 7,156.7 121,317.9 Hours Generator was On-Line 744.0 7,141.6 119,925.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 913,996 8,755,852 144,424,436 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.

Date Type1 Reason2 No reactor shutdowns occurred during the month of October 2003.

IF-Forced S-Scheduled 2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

I-Manual 2-Manual Trip / Scram 3-Automatic Trip I Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Note: Yr. to Date and Cumulative Net Generation has been updated to correct for a data error in the March 2003 report. A follow-up report will be issued to address these data points for previous reports.

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-529 PVNGS-2 11/06/03 J. M. Mellody (623) 393-6422 Reporting Period:

October 2003

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 3.

4.

5.

6.

Unit 2 Generating Statistics This Month l

Yr. To Date Cumulative Hours Reactor was Critical 0.0 6,415.9 120,327.4 Hours Generator was On-Llne 0.0 6,402.6 118,982.2 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 0 8,032,292 144,975,973 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.

Date Type' Reason2 03-02 09/27/03 S

744 C

4 Continue 2R1 1 and replace steam generators.

1F-Forced S-Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Note: Yr. to Date and Cumulative Net Generation has been updated to correct for a data error in the March 2003 report. A follow-up report will be issued to address these data points for previous reports.

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-530 PVNGS-3 11/06/03 J. M. Mellodv (623) 393-6422 Reporting Period:

October 2003

1.

Design Electrical Rating (Net MWe):

1269

2.

Maximum Dependable Capacity (Net MWe):

1247 3.

4.

5.

6.

Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 6,315.6 116,499.3 Hours Generator was On-lfIne 744.0 6,251.5 115,447.4 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 937,928 7,695,251 141,202,410 UNIT SHUTDOWNS Outage Duration Type1 Hours Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.

Date No reactor shutdowns occurred during the month of October'2003.

F-Forced S-Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Note: Yr. to Date and Cumulative Net Generation has been updated to correct for a data error in the March 2003 report. A follow-up report will be issued to address these data points for previous reports.