October 2003 Monthly Operating Report for Oyster Creek Generating Station
ML033240072
Person / Time
Site: Oyster Creek
(DPR-016)
Issue date: 11/11/2003
From: Harkness E
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-03-20280
Download: ML033240072 (2)


Text

AmerGen SM AmerGen Energy Company, LLC Oyster Creek US Route 9 South P.O. Box 388 Forked River, NJ 08731-0388 An Exelon/British Energy Company GL 97-02 November 11 2003 2130-03-20260 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219

Subject:

Monthly Operating Report - October 2003 Enclosed is the October 2003 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.

If any further information or assistance is needed, please contact William Stewart at 609-971-4775.

Sincerely, Ernest J. Harkness P. E.

Vice President, Oyster Creek Generating Station EJH/WVS Enclosure - Operating Data Report cc:

H. J. Miller, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 03001

1,7(3 D q-

OPERATING DATA REPORT DOCXET NO.

J;NIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-219 Oyster Creek 1 November 06, 2003 W. V. Stewart (609) 971-4775 October 2003 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 650.00 619.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 745.00 745.00 0.00 470,091.00:

Yr-to-Date 7,051.92 7,004.45 0.00 4,334,852.00 Cumulative 216,973.02 212,731.65 918.20 121,473,280.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments 1

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

During October, Oyster Creek generated 470,091 net MWh electric, which was 101.9% of its MDC rating.

Due to the return to Eastern Standard time there was 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of additional generation during the month (745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br /> in October).

Page 1 of 1