October 2003 Monthly Operating Report for Watts Bar, Unit 1
ML033230235
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/14/2003
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML033230235 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 NOV 1 4 2003 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555 Gentlemen:

In the Matter of Tennessee Valley Authority

)

Docket No.50-390 WATTS BAR NUCLEAR PLANT (WBN) -

OCTOBER 2003 REPORT MONTHLY OPERATING Enclosed is the October 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.

There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.

Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:

See page 2

-)A

 C-' C I

P"ea on mecycW pa~W

U.S. Nuclear Regulatory Commission Page 2 NOV 14 2003 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. Margaret H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT OCTOBER 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Docket No.

50-390 Unit Name:

WBN Unit 1 Date:

November 5, 2003 Completed By P. P. Salkeld Telephone:

(423) 365-3635 Reporting Period:

October 2003 2

2 3

4 1 Design Electrical Rating (MWe-Net):

1155 Maximum Dependable Capacity (MWe-Net):

1121*

Month Year-to-Date Number of Hours Reactor was Critical 269.8 6115.3 Hours Generator On-Line 269.8 6088 5 Unit Reserve Shutdown Hours 0.0 0.0

5. Net Electrical Energy Generated (MWh) 251039 6841516
  • Adjusted based on seasonal conditions experienced during Cycle 5.

Cumulative 59281 58988 0.0 65307584 E-2

UNIT SHrUTDOWNS DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-390 WBN-1 November 5, 2003 P. P. Salkeld (423) 365-3635 REPORT PERIOD: October 2003 4-No.:; -. Date 7,'Tye-if';--Duration, Reason 2

'Method

- Licensee System,:Component Cause 'and Correcte Action to":

X,

< < m l -~~~~~~~~~~~~~~~~~~~~~4 4 f (Hours) ~~~

<'2 of Event Code ~~~~~Code4 Prevent Recurrence, K~Siittling -RPor No.

1 10-01-03 S

475.2 C

4 N/A N/A N/A The WBN Unit 1 Cycle 5 refueling outage continued until October 20, 2003, when the unit was connected to the grid at 19:13 EDT. The unit reached 100 percent power at 01:15 EDT on October 25, 2003.

' F: Forced 2Reason:

3 Method 4Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain)

I-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Trip/Scram Event Report (LER)

C-Refueling 3-Automatic Trip/Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Summary: The WBN Cycle 5 refueling outage continued until October 20, 2003, with the unit returning to 100 percent power on October 25, 2003. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.