Ltr. 05000458 - Revised Inspection Schedule Arising from Reorganization of the NRC Region IV Division of Reactor Safety
ML033230155
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/17/2003
From: Chamberlain D
Division of Reactor Safety IV
To: Hinnenkamp P
Entergy Operations
References
Download: ML033230155 (6)


Text

November 17, 2003 Paul D. Hinnenkamp Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, LA 70775

Subject:

REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY

Dear Mr. Hinnenkamp:

The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.

The Divisions inspection duties were formerly divided among three branches:

Operations Branch



Operator licensing



Identification and Resolution of Problems (PI&R)

Plant Support Branch



Security



Radiological Controls



Emergency Preparedness Engineering & Maintenance Branch



Safety System Design and Performance Capability



Permanent Plant Modifications



Inservice Inspection Activities



Evaluation of Changes, Tests or Experiments



Fire Protection



Heat Sink Performance



Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:

Operations Branch



Initial Operator Licensing



Operator Requalification Program



Emergency Preparedness



PI&R Support Performance Evaluation Branch



PI&R Lead Responsibility



Fire Protection



Heat Sink Performance



Maintenance Effectiveness

Entergy Operations, Inc. Engineering Branch



Safety System Design and Performance Capability



Permanent Plant Modifications



Inservice Inspection Activities



Evaluation of Changes, Tests or Experiments



PI&R Support Plant Support Branch



Security



Radiological Controls



PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Safety

Enclosure:

as stated Docket: 50-458 License: NPF-47 cc w/enclosure Senior Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, LA 70775

Entergy Operations, Inc. Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, LA 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, DC 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, LA 70775 The Honorable Richard P. Ieyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, LA 70775 Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, LA 70821-4313 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78711-3326

Entergy Operations, Inc. Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (PJA)

Branch Chief, DRP/B (DNG)

Senior Project Engineer, DRP/B (RAK1)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

ADAMS:  Yes

 No Initials: ______

 Publicly Available

 Non-Publicly Available

 Sensitive

 Non-Sensitive C:EMB C:OB C:PSB C:PBB D:DRS CSMarschall/lmb ATGody TWPruett DNGraves DDChamberlain

/RA/

/RA/

/RA/

/RA/

/RA/

11/13/03 11/10/03 11/13/03 11/13/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax