November 17, 2003 Gregory M. Rueger, Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424

Subject:

REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY

Dear Mr. Rueger:

The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.

The Divisions inspection duties were formerly divided among three branches:

Operations Branch



Operator licensing



Identification and Resolution of Problems (PI&R)

Plant Support Branch



Security



Radiological Controls



Emergency Preparedness Engineering & Maintenance Branch



Safety System Design and Performance Capability



Permanent Plant Modifications



Inservice Inspection Activities



Evaluation of Changes, Tests or Experiments



Fire Protection



Heat Sink Performance



Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:

Operations Branch



Initial Operator Licensing



Operator Requalification Program



Emergency Preparedness



PI&R Support Performance Evaluation Branch



PI&R Lead Responsibility



Fire Protection



Heat Sink Performance



Maintenance Effectiveness

Pacific Gas and Electric Companny Engineering Branch



Safety System Design and Performance Capability



Permanent Plant Modifications



Inservice Inspection Activities



Evaluation of Changes, Tests or Experiments



PI&R Support Plant Support Branch



Security



Radiological Controls



PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Safety

Enclosure:

as stated Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82 cc w/enclosure:

David H. Oatley, Vice President and General Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Lawrence F. Womack, Vice President, Power Generation & Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424

Pacific Gas and Electric Companny Pete Wagner Sierra Club California 2650 Maple Avenue Morro Bay, CA 93442 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Truman Burns\\Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Ed Bailey, Radiation Control Program Director Radiologic Health Branch State Department of Health Services P.O. Box 942732 (MS 178)

Sacramento, CA 94234-7320 Richard F. Locke, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112

Pacific Gas and Electric Companny James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814

Pacific Gas and Electric Companny Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (DLP)

Branch Chief, DRP/E (WBJ)

Senior Project Engineer, DRP/E (VGG)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

ADAMS:  Yes

 No Initials: ______

 Publicly Available

 Non-Publicly Available

 Sensitive

 Non-Sensitive C:EMB C:OB C:PSB C:PBE D:DRS CSMarschall/lmb ATGody TWPruett WBJones DDChamberlain