November 17, 2003 Gregory M. Rueger, Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424
Subject:
REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY
Dear Mr. Rueger:
The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.
The Divisions inspection duties were formerly divided among three branches:
Operations Branch
Operator licensing
Identification and Resolution of Problems (PI&R)
Plant Support Branch
Security
Radiological Controls
Emergency Preparedness Engineering & Maintenance Branch
Safety System Design and Performance Capability
Permanent Plant Modifications
Inservice Inspection Activities
Evaluation of Changes, Tests or Experiments
Fire Protection
Heat Sink Performance
Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:
Operations Branch
Initial Operator Licensing
Operator Requalification Program
PI&R Support Performance Evaluation Branch
Fire Protection
Heat Sink Performance
Maintenance Effectiveness
Pacific Gas and Electric Companny Engineering Branch
Safety System Design and Performance Capability
Permanent Plant Modifications
Inservice Inspection Activities
Evaluation of Changes, Tests or Experiments
PI&R Support Plant Support Branch
Security
Radiological Controls
PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.
Sincerely,
/RA/
Dwight D. Chamberlain, Director Division of Reactor Safety
Enclosure:
as stated Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82 cc w/enclosure:
David H. Oatley, Vice President and General Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Lawrence F. Womack, Vice President, Power Generation & Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424
Pacific Gas and Electric Companny Pete Wagner Sierra Club California 2650 Maple Avenue Morro Bay, CA 93442 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Truman Burns\\Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Ed Bailey, Radiation Control Program Director Radiologic Health Branch State Department of Health Services P.O. Box 942732 (MS 178)
Sacramento, CA 94234-7320 Richard F. Locke, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112
Pacific Gas and Electric Companny James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814
Pacific Gas and Electric Companny Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (DLP)
Branch Chief, DRP/E (WBJ)
Senior Project Engineer, DRP/E (VGG)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
ADAMS: Yes
No Initials: ______
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive C:EMB C:OB C:PSB C:PBE D:DRS CSMarschall/lmb ATGody TWPruett WBJones DDChamberlain
/RA/
/RA/
/RA/
/RA/
/RA/
11/13/03 11/10/03 11/13/03 11/13/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax