Revised Inspection Schedule Arising from Reorganization of NRC Region IV Division of Reactor Safety
ML033230132
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/17/2003
From: Chamberlain D
Division of Reactor Safety IV
To: Blevins M
TXU Energy
References
Download: ML033230132 (5)


Text

November 17, 2003 M. R. Blevins, Senior Vice President and Principal Nuclear Officer TXU Energy ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043

Subject:

REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY

Dear Mr.Blevins:

The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.

The Divisions inspection duties were formerly divided among three branches:

Operations Branch



Operator licensing



Identification and Resolution of Problems (PI&R)

Plant Support Branch



Security



Radiological Controls



Emergency Preparedness Engineering & Maintenance Branch



Safety System Design and Performance Capability



Permanent Plant Modifications



Inservice Inspection Activities



Evaluation of Changes, Tests or Experiments



Fire Protection



Heat Sink Performance



Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:

Operations Branch



Initial Operator Licensing



Operator Requalification Program



Emergency Preparedness



PI&R Support Performance Evaluation Branch



PI&R Lead Responsibility



Fire Protection



Heat Sink Performance



Maintenance Effectiveness

TXU Engergy Engineering Branch



Safety System Design and Performance Capability



Permanent Plant Modifications



Inservice Inspection Activities



Evaluation of Changes, Tests or Experiments



PI&R Support Plant Support Branch



Security



Radiological Controls



PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Safety

Enclosure:

as stated Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 cc w/enclosure:

Roger D. Walker Regulatory Affairs Manager TXU Generation Company LP P.O. Box 1002 Glen Rose, TX 76043 George L. Edgar, Esq.

Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711

TXU Engergy The Honorable Walter Maynard Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Chief, Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087

TXU Engergy Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (DBA)

Branch Chief, DRP/A (WDJ)

Senior Project Engineer, DRP/A (TRF)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

ADAMS:  Yes

 No Initials: ______

 Publicly Available  Non-Publicly Available

 Sensitive

 Non-Sensitive C:EMB C:OB C:PSB C:PBA C:DRS CSMarschall/lmb ATGody TWPruett WDJohnson DDChamberlain

/RA/

/RA/

/RA/

/RA/

/RA/

11/13/03 11/10/03 11/13/03 11/13/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax