ML033160559

From kanterella
Jump to navigation Jump to search
Fourth Ten-Year Inservice Inspection Interval Plan
ML033160559
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/05/2003
From: Rosalyn Jones
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML033160559 (2)


Text

P Duke R. A. JONES MPower.

Vice President A Duke Energy Company Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax November 5, 2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Duke Energy Company Oconee Nuclear Station, Unit 1 Docket No. 50-269 Fourth Ten-Year Inservice Inspection Interval Plan Attached for your review are documents describing the Oconee Unit 1 Fourth Ten-Year Interval Inservice Inspection (ISI) Program.

This interval starts on January 1, 2004 and goes through July 15, 2013.

The attachments include:

A) two volumes of the Inservice Inspection Plan:

i) ISI General Requirements ii) Unit 1 ISI Examination Listing and Schedule B) the ISI Pressure Test Plan, and C) Request for Alternative 03-006 Request for Alternative 03-006 is submitted to request extension of Request for Alternative 02-006, related to snubber testing, which was approved by letter dated July 14, 2003, but which will expire for Unit 1 upon termination of the Third Ten Year Interval.

If there are any questions you may contact R. P. Todd at (864) 885-3418.

Ve y yours, A

nes ite ice-President Oconee Nuclear Station Attachments www. duke-energy. corn

U. S. Nuclear Regulatory Commission November 5, 2003 Page 2 xc wo/attachment:

Mr. Luis A. Reyes Administrator, Region II U.S. Nuclear Regulatory Commission 61 Forsyth Street, S. W., Suite 23T85 Atlanta, GA 30303 Leonard N Olshan, Projects Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Melvin C. Shannon NRC Senior Resident Inspector Oconee Nuclear Station