ML033160394
| ML033160394 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/12/2003 |
| From: | Ernstes M Division of Nuclear Materials Safety II |
| To: | Gannon C Carolina Power & Light Co |
| References | |
| 50-324/03-006, 50-325/03-006 | |
| Download: ML033160394 (7) | |
See also: IR 05000324/2003006
Text
November 12, 2003
Carolina Power and Light Company
ATTN: Mr. C. J. Gannon
Vice President
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - BRUNSWICK STEAM
ELECTRIC PLANT 50-325/2003-006 AND 50-324/2003-006
Dear Mr. Gannon:
In a telephone conversation on November 12, 2003, Ms. Kathleen ODonohue, Sr. Reactor
Inspector, and Tony Pearson, Supervisor - Operator Continuing Training, made arrangements
for the NRC to inspect the licensed operator requalification program at the Brunswick Steam
Electric Plant. The inspection is planned for the week of December 1, 2003, which coincides
with your regularly scheduled requalification examination cycle. The staff at your facility should
prepare and conduct the requalification examinations in accordance with your NRC-approved
requalification program. It is our understanding that your simulator is committed to ANSI
Standard 3.5, 1998.
In accordance with 10 CFR 55.59(c), the NRC has requested that you submit no later than
November 18, 2003, the material as specified in enclosure one, in order to support the NRC's
inspection program needs. Tony Pearson has been advised of this request and provided with
the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2006.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any
aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the
Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of
Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB approval number.
2
Thank you for your cooperation in this matter. If you have any questions regarding this
inspection, please contact Kathleen ODonohue at (404) 562-4555 or myself at (404) 562-4638.
Sincerely,
/RA/
Michael E. Ernstes, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket Nos. 50-325, 50-324
Enclosure: Materials Request List
cc w/encl:
W. C. Noll, Director
Site Operations
Brunswick Steam Electric Plant
Carolina Power & Light
Electronic Mail Distribution
D. Hinds
Plant Manager
Brunswick Steam Electric Plant
Carolina Power & Light Company
Electronic Mail Distribution
Terry C. Morton, Manager
Performance Evaluation and
Regulatory Affairs CPB 7
Carolina Power & Light Company
Electronic Mail Distribution
Edward T. O'Neil, Manager
Support Services
Carolina Power & Light Company
Brunswick Steam Electric Plant
Electronic Mail Distribution
Licensing Supervisor
Carolina Power and Light Company
Electronic Mail Distribution
cc w/encl contd - see page 3)
3
(cc w/encl contd)
William D. Johnson
Vice President & Corporate Secretary
Carolina Power and Light Company
Electronic Mail Distribution
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC 20037-1128
Beverly Hall, Acting Director
Division of Radiation Protection
N. C. Department of Environment
and Natural Resources
Electronic Mail Distribution
Peggy Force
Assistant Attorney General
State of North Carolina
Electronic Mail Distribution
Chairman of the North Carolina
Utilities Commission
c/o Sam Watson, Staff Attorney
Electronic Mail Distribution
Robert P. Gruber
Executive Director
Public Staff NCUC
4326 Mail Service Center
Raleigh, NC 27699-4326
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC 29211
Donald E. Warren
Brunswick County Board of
Commissioners
P. O. Box 249
Bolivia, NC 28422
Dan E. Summers
Emergency Management Coordinator
New Hanover County Department of
Emergency Management
P. O. Box 1525
Wilmington, NC 28402
Ms. Jackie Gawron
Training Manager
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461-0429
4
Distribution w/encl:
B. Mozafari, NRR
C. Evans (Part 72 Only)
L. Slack, RII EICS
RIDSRIDSNRRDIPMLIPB
PUBLIC
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA/
/RA By G. MacDonaod for/
NAME
KODonohue
MErnstes
PFredrickson
DATE
11/ 12 /2003
11/12 /2003
11/ 12 /2003
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML033160394.wpd
Enclosure
Materials Request List
The items listed below are being requested per telephone conversation on November 12, 2003,
to support the upcoming IP-71111.11 inspection in December 2003 at Brunswick Steam Electric
Plant. Items in paragraph "A" are to be sent prior to the inspection. They must be received in
our office by November 18, 2003. Please have the items listed in paragraph "B" ready for our
review upon arrival on December 1, 2003.
A.
In-office inspection material:
1.
Exam results since last requal inspection, copies of exam that had pass/failure rates
significantly outside the average.
2.
A copy of the Written Exams to be administered and all biennial re-takes.
3.
List of personnel scheduled for requal testing the weeks of December 1, 2003.
4.
Copies of simulator scenarios for this exam.
5. A list of all personnel that reactivated their licenses since the last requal inspection.
6.
Simulator documentation
a.
List of all open simulator discrepancies (DRs).
b.
Copy of the Simulator Management and Configuration Procedures.
c.
List of all closed simulator DRs for last 12 months.
d.
List of Simulator Performance tests.
B.
On-site inspection material:
1.
Condition Reports and LERs resulting from human performance errors since the last
requal inspection.
2.
Program management observations/evaluations for the previous 2 years training cycle.
3.
All training feedback forms since the last requal inspection.
4.
All remedial training packages since the last requal inspection.
5.
Security badge and HP printouts for all (selected) personnel that reactivated their
licenses since the last requal inspection.
2
6.
Copies of the reference list for all administrative procedures which direct the training
process, including development of training and test materials, remedial training,
modifications, plant and industry experience.
7.
Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last
requal inspection.
8.
All Medical Exam Records with a copy of the individuals licence attached.
9.
Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
10.
Copy of an Organizational Chart for the training department including the simulator
group.
11.
Complete list of all Licensed individuals complete with license restrictions.
12.
Security procedures for the simulator.