ML033140182

From kanterella
Jump to navigation Jump to search

Table, CEDM Nozzle Freespan Lengths
ML033140182
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/04/2003
From: Davant G
Entergy Operations
To: Kalyanam N
NRC/NRR/DLPM/LPD4
Kalyanam N, NRR/DLPM, 415-1480
Shared Package
ML033140175 List:
References
Download: ML033140182 (2)


Text

From:

"DAVANT, GUY H" <GDAVANT@entergy.com>

To:

"Kaly" <nxk@nrc.gov>

Date:

11/4/03 10:44AM

Subject:

W3 CEDM Nozzle Freespan Lengths

Kaly, Attached is a table that documents the actual as-built freespan lengths of the Waterford 3 CEDM nozzles. These lengths were determined from the UT scan data. In Entergy letter CNRO-2003-00057, dated 10/24/03, Entergy responded to an NRC question pertaining to reanalysis criterion. In that letter, Entergy provided the amount of freespan length, designated as "minimum propagation length", required for each nozzle group. A nozzle with less freespan length than the designated miminum propagation length would require augmented inspection. As can be seen from the attached table, the actual as-built freespan lengths of the CEDM nozzles exceed the minimum propagation lengths. Therefore, no augmented inspections of the CEDM nozzles were required. Please let me know if you have any questions about this information.

Thanks!

Guy CC:

"KRUPA, MICHAEL A" <MKRUPA@entergy.com>, "BURFORD, FRANCIS G"

<FBURFOR@entergy.com>, "LEWIS, RAYMOND S" <RLEWIS1@entergy.com>, "SWAIN, RONALD VANCE" <RSWAIN1@entergy.com>, "SIMS, WILLIAM D" <WSIMS@entergy.com>,

"JAMES, WILLIAM" <WJAMES1@entergy.com>, "BENNETT, STEVE A"

<SBENNE2@entergy.com>, "PAYNE, GARY - WF3" <GPAYNE@entergy.com>,

"HOUGHTALING, JOHN B" <JHOUGHT@entergy.com>, "MANZELLA, JUSTINE M"

<JMANZEL@entergy.com>

Mail Envelope Properties (3FA7C95A.9DD : 21 : 6621)

Subject:

W3 CEDM Nozzle Freespan Lengths Creation Date:

11/4/03 10:42AM From:

"DAVANT, GUY H" <GDAVANT@entergy.com>

Created By:

GDAVANT@entergy.com Recipients nrc.gov owf4_po.OWFN_DO NXK (N. Kaly Kalyanam) entergy.com JMANZEL CC (MANZELLA, JUSTINE M)

JHOUGHT CC (HOUGHTALING, JOHN B)

GPAYNE CC (PAYNE, GARY - WF3)

SBENNE2 CC (BENNETT, STEVE A)

WJAMES1 CC (JAMES, WILLIAM)

WSIMS CC (SIMS, WILLIAM D)

RSWAIN1 CC (SWAIN, RONALD VANCE)

RLEWIS1 CC (LEWIS, RAYMOND S)

FBURFOR CC (BURFORD, FRANCIS G)

MKRUPA CC (KRUPA, MICHAEL A)

Post Office Route owf4_po.OWFN_DO nrc.gov entergy.com Files Size Date & Time MESSAGE 856 11/04/03 10:42AM Part.001 2682 W3 CEDM Nozzle Freespan Lengths.pdf 328885 Mime.822 374749 Options Expiration Date:

None Priority:

Standard Reply Requested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard