ML033110376
ML033110376 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 10/31/2003 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
28401 EP-PS-245, Rev 5 | |
Download: ML033110376 (11) | |
Text
Oct. 31, 2003 Page of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-51885 USER INFORMATION:
Name CH*RO EMPL#:28401 CA#:0363 Address:
Phone#: -
TRANSMITTAL INFORMATION:
TO: -- 10/31/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
245 - 245 - DOSE ASSESSMENT SUPERVISOR REMOVE MANUAL TABLE OF CONTENTS DATE: 10/27/2003
\_JADD MANUAL TABLE OF CONTENTS DATE: 10/30/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-245 REPLACE: REV:5 REPLACE: REV:5 REMOVE: PCAF 2003-1638 REV: N/A ADD: PCAF 2003-1638 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
'~~ ~ ~ ~ ~~~A
Tab 3
.EP-PS-245-3 PAR AIRBORNE RELEASES
[ E ENERED l MONITOR CONDITIONS:
- PLANT STATUS/PROCEDUR ES . OTNUE
- ONSrTE RAD CONDITIONS . ASSESSMENT
- STATUS OF RELEASE _
- DOSE PROJECTIONS P
/1SGENERK EMERGENCY BEEN NO ELARE YES S THE A VALID DOS RECOMMEND EVACUATION
/ ROJECTION INDICATIN \-0 MILESMEND VAIE DOSES OF a 1 REM TEDE OR YES 0 CIZENS TO TAKE K IN
\ 5 REM THYROID CDE AT A ACCORDANCE WITH THE ISTANCE OF 2 2 MILES' STATES EMERGENCY PLANS.
PA-P NO OR UNKNOWN .
RECOMMEND EVACUATING 0-2 MILES AND SHELTERING CONTINUE R 2-10 MILES AND ADVISE CTZENS T EF E QENT TO TAKE KLIN A CCORDANCE T CMM THE STATES EMERGENCY PLANS. PA-1 PA-4
- 1. PA-# CAN BE USED TO REFER TO PROCEDURE STEPS FOR MORE DETAILED INFORMATION ON THE ACTION TO BE TAKEN.
.2. DOSE PROJECTIONS DO NOT INCLUDE DOSE ALREADY RECEIVED.
- 3. TEDE - WHOLE BODY (TEDE) ISTHE SUM OF EFFECTIVE DOSE EQUIVALENT RESULTING FROM EXPOSURE TO EXTERNAL SOURCES. THE COMMITTED EFFECTIVE DOSE EQUIVALENT (CEDE) FROM ALL SIGNIFICANT INHALATION PATHWAYS AND THE DOSE DUE TO GROUND DEPOSITION.
- 4. CDE - COMMITTED DOSE EQUIVALENT TO THE CHILD THYROID.
EP-AD-000-1 26, Revision 11, Page 1 of 6
Tab3 EP-PS-245-3 PAR LIQUID RELEASES INDICATIONS OF A POTENTIAL UQUID RELEASE
-UNISOLABLE RADWASTE TANK RELEASE
-LEAK TO COOUNG TOWER BASIN
. -LEAKTOSPRAYPOND PL-1 ENSURE CHEMIESD TAKES AND ANALYZES SAMPLES PL-2 NPANED RELEA NO ACIN CNIU TO THE RIVER No REUD RADIONUC UDE EC Values (pjCihnl) pUAL TO -
Co-6 l 3E' Yes Sr-91 2E' I Mo-99 2E4 RAD PERSONNEL NOTIFY Te-132 9E' DEPIBRP THAT A RELEASE 1-131 1E' HAS OCCURRED .
1-133 7E' 1-134 4E' 1-135 3E' EL >,
7 Cs-134 9E Cs-136 6E6
<EHREQUIREMENTS (T Cs-137 1E' I ELEASE POIN Ba-139 2E4 I Ba-140 SE' I P-5 ,
Ba-141 3E- I Ys Np-239 2E' II I
II I
I II I
I II
.I
.I I
II I-II I
NOTES: I
- 1. PL- CAN BE USED TO REFER TO II PROCEDURE STEPS FOR MORE I DETAILED INFORMATION ON TE ACTION TO BE TAKEN.
- 2. CALLS TO DANVILLE ARE COURTESY INFORMATION CALLS ONLY.
PROTECTIVE ACTION RECOMMENDATION CALLS MUST BE MADE BY DEPIBRP.
Yes RAD PERSONNEL NOTIFY DEPIBRP FOR DOWNSTREAM USERS TO DIVERT WATER SUPPLY &ESTIMATED TIME OF ARRIVAL OF RELEASE AT DANVILLE PL-9 EP-AD-000-126, Revision 11, Page 2 of 6
Tab 3
.EP-PS-245-3 PUBLIC PROTECTIVE ACTION RECOMMENDATION GUIDE AIRBORNE RELEASES 0 PA-1 MONITOR CONDITIONS FOR PAR APPLICATION The following conditions should be continuously evaluated to determine if a PAR should be implemented or changed:
- Plant status and prognosis for changes in conditions
- Onsite radiological conditions
- Status of actual or potential radioactive releases
- Offsite dose projections or actual offsite radiological conditions
- Escalation in Emergency Classification (i.e., General)
(Go to PA-2)
El PA-2 HAS A GENERAL EMERGENCY BEEN DECLARED?
O YES- If a GENERAL EMERGENCY has been declared, a PAR must be made within 15 minutes of the emergency declaration-The PAR requirement is found in NUREG-0654. (Go to PA-3)
O NO- If a GENERAL EMERGENCY has not been declared, continue to monitor plant status, parameter trends, and prognosis for termination or escalation of the event. (Go to PA-1) a PA-3 IS THERE A VALID DOSE:PROJECTION INDICATING DOSES OF > 1 REM TEDE OR 5 REM CDE CHILD THYROID AT A DISTANCE OF >-2 MILES?
o YES- It the projected doses at 2 miles are 1 REM TEDE-or->5.5 REM CDE child thyroid, then-full evacuation (0-10 miles) is recommended. (Go to PA-5)
O NO/UNKNOWN- (Go to PA-4) 0 PA-4 RECOMMEND EVACUATION 0-2 MILES; SHELTER 2-10 MILES AND ADVISE CITIZENS TO TAKE KI IN ACCORDANCE WITH THE STATE'S EMERGENCY PLANS.
Limited Evacuation (0-2 miles) and sheltering is appropriate for events that are significant enough to cause a General Emergency classification and dose projections are low, unknown, or below full evacuation guidelines. A recommendation is also given to the state to advise 6itizens to take KI in accordance with the state's emergency plans.
0 PA-5. EVACUATE 0-10 MILES AND ADVISE CITIZENS TO TAKE KIlIN ACCORDANCE WITH THE STATE'S EMERGENCY PLANS.
Full evacuation of members of the general public is recommended at this point based on the emergency classification and dose projections. A recommendation is also given to the state to advise citizens to take KI in accordance with the state's emergency plans.
EP-AD-000-1 26, Revision 11, Page 3 of 6
Tab 3
.EP-PS-245-3 LIQUID 0 PL-1 ENTRY This section is entered when there are indications of a potential unplanned radioactive liquid release.
Indications of potential unplanned releases include:
- an unisolable radwaste tank release
- leaks to cooling tower basin
- leak to spray pond (Go to PL-2)
O PL-2 CHEMISTRY/ENVIRONMENTAL SAMPLING DIRECTOR (ESD)
TAKES AND ANALYZES SAMPLE (Go to PL-3)
PL-3 IS THERE AN UNPLANNED RELEASE TO THE RIVER?
o YES - An unplanned release to the river has occurred when event-related radioactive materials are released to the river that are not controlled by the release methodologies described in the ODCM arid applicable Chemistry procedures; (Go to PL-4) o NO- If there is no unplanned release to the river, then no notifications are required and monitoring should continue.
o PL-4 RAD PERSONNEL NOTIFY DEP/BRP THAT A RELEASE HAS OCCURRED Depending on which facility is activated, the notification to BRP will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF.
DO NOT MAKE-ANY PROTECTIVE ACTION RECOMMENDATIONS AT THIS TIME.
(Go to PL-5)
EP-AD-000-126, Revision 11, Page 4 of 6
Tab 3 EP-PS-245-3 LIQUID (CoNT'D)
PL-5 IS RELEASE 2 TECHNICAL REQUIREMENTS LIMITS (AT THE RELEASE POINT)?
0 YES - Releases are at or greater than Technical Requirements limits when Chemistry determines that the limits are exceeded based on methodologies described in the ODCM and applicable Chemistry procedures.
(Go to PL-6) o NO'- If the release is < Technical Requirements limits, then no further notifications are required and monitoring should continue.
O PL-6 RAD PERSONNEL NOTIFY DANVILLE THAT A RELEASE HAS OCCURRED Depending on which facility is activated, the notification to Danville will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF.
DO NOT MAKE ANY PROTECTIVE ACTION RECOMMENDATIONS AT THIS TIME.
(Go to PL-7) o PL-7 CHEM/FTD EVALUATES RELEASE VERSUS PAGs The results of the sample analysis are compared to the PAGs for radionuelides in drinking water. The analysis calculates the expected concentration at Danville, taking into account the dilution afforded by the river.
PL-8 DOES RELEASE EXCEED PAGs (AT DANVILLE)?
0 YES - If a single isotope exceeds its effluent concentration (EC) value or the sum of EC fractions exceeds 0.85, then a protective action recommendation should be made for downstream water users (e.g.,
Danville) to DIVERT DRINKING WATER supply t6 a backup supply or terminate user intake until the release has passed.
(Go to PL-9) 0 NO- If the PAGs are not exceeded, monitoring should continue and the State should be notified that no PAR for the liquid release is required.
(Go to PL-10)
EP-AD-000-1 26, Revision 11, Page 5 of 6
Tab 3 EP-PS-245-3 LIQUID (CONT'D) 0 PL-9 RAD PERSONNEL NOTIFY DEPIBRP OF PAR Depending on which facility is activated, the PAR notification to DEP/BRP will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF. The PAR FORM shall be used to document the PAR.
DO NOT COMMUNICATE THE PROTECTIVE ACTION RECOMMENDATION TO DANVILLE. THE DEP/BRP IS RESPONSIBLE FOR THIS COMMUNICATION AND ANY COMMUNICATION TO OTHER DRINKING WATER SUPPLIERS OR WATER USERS.
O PL-10 RAD PERSONNEL NOTIFY DEPIBRP No PAR is required. Depending on which facility is activated, the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF shall notify DEP/BRP that no PAR is required.
EP-AD-000-1 26, Revision 11, Page 6 of 6
Tab 5 EP-PS-245-5 Affected Unit Control No.
PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION O This is a Drill O This is an Actual Event Preparer:
The EMERGENCY CLASSIFICATION is:
0 Unusual Event E Alert E Site Area Emergency El General Emergency Basis: EAL #
This represents:
0 Initial Classification El Escalation E Reduction E No Change in the Classification Status Emergency Action(s) implemented onsite:
E None O Evacuation of non-essential personnel E Local Area Evacuation E KI to onsite personnel ' -
E Site Accountability O Other Bases:
The PROTECTIVE ACTION RECOMMENDATION is:
E No Protective Action Recommendation Required O Evacuate 0-2 miles and Shelter 2-10 miles and advise E Divert Danville Drinking Water*
citizens to take KI in accordance with the State's Cl Relocation emergency plans. . E Control of Access 0 Evacuate 0-10 miles and advise citizens to take KI D Contamination Controls/Decon in accordance with the State's emergency plans E Other
- Expected arrival of release at Danville:
This represents: El Initial E Change E No Change in the Protective Action Recommendation EP-AD-000-1 10, Revision 11, Page 1 of 2
.. Tab 5
. EP-PS-245-5 The BASIS for the Protective Action Recommendation is:
Plant Status
- Status of Radioactive Release: Event-related release in progress? Yes No Total Site Release Rate Airborne Liquid
< Tech Requirements Limit 0
. Tech Requirements Limit I I NOTE: TRM Limits (Cfmin): Noble Gas 1.OQE+6; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)
Based on: O Effluent Monitors 0 Field Measurements 0 Engineering Judgement Data measured in the field confirm release rate estimations: 0 Yes No N/A Weather Conditions: Wind Speed Wind Direction Dose Projections: 0 TEDE > 1 rem or thyroid CDE > 5 rem at 2 miles E TEDE > 1 rem or thyroid CDE > 5 rem at EPB E TEDE 1 rem and thyroid CDE < 5 rem at EPB-Other:
Approval: Date/Time:
Emergency Director or Recovery Manager approval required if change in Classification or Protective Action Recommendation.
RPC or DASU approval if no change in the Classification or Protective Action Recommendation.
Transmittal: 0 Verbal 0 Electronic 0 Both Communicated To:
NAME AGENCY DATE/TIME EP-AD-000-1 10, Revision 11, Page 2 of 2
Of
(..~~~~~~~~~~~~~~~~~(* (
Tab5 EP-PS-245-5 I
SHIFT TAKEOVER CHECKLIST Accident Status: (DASU)
- a. Current Emergency Classification: None Unusual Event Alert Site Area General EAL #
- b. Affected Unit(s): 1 2 Both None
- c. Onsite Emergency Actions: 0 None 03 Local Area Evacuation 0 Site Accountability Cl Evacuation of non-essential personnel
- d. Plant Status:
.1*
- e. Current PAR:
- f. Last transmitted PAR form: Number: Time:
- g. Last DEP/BRP Communication Time: _______
- 3. MIDAS Information: (DAST) i
- a. Accident dose calculation method in use: Menu B Menu C Menu D Menu E-W Menu G
- b. Accident Source Term Selection: ATWS Coolant Activity Leak (LOCA) DP-No Fuel Damage (LOCA) Cladding Failure (LOCA) Fuel Melt Fuel Handling Accident (Percent Clad Failure or Fuel Melt: _ )
EP-AD-000-217, Revision 3, Page of 2
( C (
Tab 5 EP-PS-245-5 C. Projected Doses (TEDE): @ EPB _ @2 ni @ lomi
- d. Proj. Doses (THY CDE): @ EPB (X 2 ni @ lomi_
- e. Has release occurred or is one In progress? Y N If yes: Gaseous Liquid I
- f. Release type: _ Monitored Unmonitored
- 4. Field Data: (FTD)
- a. Status of Monitoring Teams:
Team Name Status
- b. Measured Field Dose Rates:
I
- c. Meteorological Conditions:
Wind From Wind Speed Affected Sector Stability Class Precipitation: None L M H EP-AD-000-217, Revision 3, Page 2 of 2