ML033090504

From kanterella
Jump to navigation Jump to search
Tech Spec for Waterford Steam Electric Station, Unit 3, Fuel Rod Maximum Allowable Gas Pressure
ML033090504
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/2003
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML033090504 (2)


Text

ADMINISTRATIVE CONTROLS INDUSTRIAL SURVEY OF TOXIC OR HAZARDOUS CHEMICALS REPORT 6.9.1.9 Surveys and analyses of major industries in the vicinity of Waterford 3 which could have significant inventories of toxic chemicals onsite to determine impact on safety shall be performed and submitted to the Commission at least once every 4 years.

6.9.1.10 A survey of major pipelines ( > 4 inches) within a 2-mile radius of Waterford 3, which contain explosive or flammable materials and may represent a hazard to Waterford 3, including scaled engineering drawings or maps which indicate the pipeline locations, shall be performed and submitted to the Commission at least once every 4 years.

CORE OPERATING LIMITS REPORT COLR 6.9.1.11 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT prior to each reload cycle or any remaining part of a reload cycle.

6.9.1.11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC as follows:

1) "The ROCS and DIT Computer Codes for Nuclear Design," CENPD-266-P-A, and "C-E Methodology for Core Designs Containing Gadolinia-Urania Burnable Absorber," CENPD-275-P-A. (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margins, 3.1.1.3 for MTC, 3.1.3.6 for Regulating and group P CEA Insertion Limits, 3.1.2.9 Boron Dilution (Calculation of CBC & IBMW, and 3.9.1 Boron Concentration).
2) "C-E Method for Control Element Assembly Ejection Analysis," CENPD-01 90-A.

(Methodology for Specification 3.1.3.6 for Regulating and group P CEA Insertion Limits and 3.2.3 for Azimuthal Power Tilt).

3) "Modified Statistical Combination of Uncertainties" CEN-356(M-P-A. (Methodology for Specification 3.2.4 for DNBR Margin and 3.2.7 for ASI).
4) "Calculative Methods for the C-E Large Break LOCA Calculation Model For The Analysis of C-E and W Designed NSSS," CENPD-132, Supplement 3-P-A. (Methodology for Specification 3.1.1.3 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt and 3.2.7 for ASI).
5) "Calculative Methods for the ABB CE Small Break LOCA Evaluation Model," CENPD-137-P, Supplement 2-P-A. (Methodology for Specification 3.1.1.3 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt and 3.2.7 for ASI).

WATERFORD - UNIT 3 6-20 AMENDMENT NO. 68,102,158,+82,191

ADMINISTRATIVE CONTROLS CORE OPERATING LIMITS REPORT COLR (Continued)

6) "CESEC - Digital Simulation for a Combustion Engineering Nuclear Steam Supply System," CENPD-107. (Methodology for Specification 3.1.1.1 and 3.1.1.2 for Shutdown Margins, 3.1.1.3 for MTC, 3.1.3.1 for Movable Control Assemblies - CEA Position, 3.1.3.6 for Regulating and group P CEA Insertion Limits, and 3.2.3 for Azimuthal Power Tilt).
7) "Qualification of Reactor Physics Methods for the Pressurized Water Reactors of the Entergy System," ENEAD-01-P. (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margins, 3.1.1.3 for MTC, 3.1.3.6 for Regulating and group P CEA Insertion Limits, 3.1.2.9 Boron Dilution (Calculation of CBC & IBW), and 3.9.1 Boron Concentration).
8) "Fuel Rod Maximum Allowable Gas Pressure," CEN-372-P-A. (Methodology for Specification 3.2.1, Linear Heat Rate).

6.9.1.11.2 The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met.

6.9.1.11.3 The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance, for each reload cycle, to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.

SPECIAL REPORTS 6.9.2 Special reports shall be submitted in accordance with 10 CFR 50.4 within the time period specified for each report.

6.10 Not Used AMENDMENT NO. *2714,1568182-WATERFORD - UNIT 3 6-20a 488, 191