ML033070269

From kanterella
Jump to navigation Jump to search
Submittal of Revision to the Nine Mile Point, Unit 1, Final Safety Analysis Report (Updated), Including Technical Specification Bases, Changes to Quality Assurance Program Description, and the 10CFR50.59 Evaluation Summary Report
ML033070269
Person / Time
Site: Nine Mile Point 
Issue date: 10/23/2003
From: Katz P
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1782
Download: ML033070269 (3)


Text

P.O. Box 63.

Lycoming, New York 13093 Constellation Energy Group Nine Mile Point Nuclear Station October 23, 2003 NMPIL 1782 U. S. Nuclear Regulatory Commission 10 C.F.R. §50.71(e)

Attn: Document Control Desk 10 C.F.R. §50.54(a)(3)

Washington, DC 20555 10 C.F.R. §50.59(d)(2)

SUBJECT:

Nine Mile Point Unit 1 Docket No. 50-220 Facility Operating License No. DPR-63 Submittal of Revision 18 to the Nine Mile Point Nuclear Station, LLC, Unit 1 Final Safety Analysis Report (Updated), Including Unit 1 Technical Specifications Bases, Changes to the Quality Assurance Program Description, and the 10 C.F.R.

§50.59 Evaluation Summary Report Gentlemen:

Pursuant to the requirements of 10 C.F.R. §50.71(e), 10 C.F.R. §50.54(a)(3), and 10 C.F.R. §50.59(d)(2), Nine Mile Point Nuclear Station, LLC, hereby submits Revision 18 to the Nine Mile Point Nuclear Station Unit 1 Final Safety Analysis Report (Updated), including changes to the Nine Mile Point Quality Assurance Topical Report, and the 10 C.F.R. §50.59 Evaluation Summary Report.

One (1) signed original and ten (10) copies of the Unit 1 FSAR (Updated), Revision 18, are enclosed. Copies are also being sent directly to the Regional Administrator, Region I, and the NRC Senior Resident Inspector at Nine Mile Point. The Unit 1 FSAR (Updated) revision contains changes made since the submittal of Revision 17 in October 2001. The revision reflects all changes up to and including July 15, 2003. The certification required by 10 C.F.R. §50.71(e) is included.

The enclosed 10 C.F.R. §50.59 Evaluation Summary Report (Enclosure A) contains a brief description of changes, tests, and experiments, and includes a summary of the §50.59 Evaluation of each. None of the 10 C.F.R. §50.59 Evaluations involved obtaining a license amendment as defined in 10 C.F.R. §50.59(c)(1).

A t t?

I 7fi I'4 D-Oo

Page 2 NMP1L 1782 Also enclosed is a summary of changes made to the Technical Specifications Bases (Enclosure B) since May 2001, and the revised Bases pages.

I declare under penalty of perjury that the foregoing is true and correct. Executed on October 23, 2003.

Very truly yours, Pe er.

atz Vice President Nine Mile Point PEK/LWB/bjh Enclosures cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Mr. P. S. Tam, Senior Project Manager, NRR