N Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 OCT 2 7 2003 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555 Gentlemen:
In the Matter of
)
Docket No.50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN) UNIT 1-CORE OPERATING LIMITS REPORT FOR CYCLE 6, REVISIONS 3 AND 4 The purpose of this letter is to provide the Cycle 6 Core Operating Limits Report (COLR) in accordance with WBN Technical Specification 59.5.d.
Enclosed are Revisions 3 and 4 of the COLR.
Revision 3, which was effective on September 29, 2003, was limited to Modes 6 and 5 of the Cycle 5 Refueling Outage in order to permit core load and reactor assembly to proceed in advance of NRC's approval of the License Amendment Requests for Robust Fuel Assemblies and Boron Concentration Reductions in the refueling water storage tank and the cold leg accumulators.
Revision 4 of the COLR was effective October 13, 2003, and removed the restrictions identified in Revision 3 following NRC's approval of the above License Amendment Requests in Amendments 46 and 48, respectively.
Pned on ced paw
U.S. Nuclear Regulatory Commission Page 2 OCT 2 7 2003 If you have any questions about these reports, please contact me at (423) 365-1824.
Sincerely, P. L.
Pace Manager, Site Licensing and Industry Affairs Enclosures Core Operating Limits Report, Unit 1 Cycle 6, Revision 3 Core Operating Limits Report, Unit 1 Cycle 6, Revision 4 cc (Enclosures):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. Margaret H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
U.S. Nuclear Regulatory Commission Page 3 OCT 2 7 2003 PLP:RNM Enclosures cc (Enclosures):
C. E. Ayers, WR 3W-C L. S. Bryant, MOB 2R-WBN M. J. Burzynski, BR 4X-C M. H. Dunn, ET 1OA-K M. J. Fecht, LP 6A-C P. W. Harris, ADM lV-WBN J. C. Kammeyer, EQB A-WBN G. J. Laughlin, EQB A-WBN J. E. Maddox, LP 6A-C NSRB Support, LP 5M-C L. V. Parscale, ADM B-WBN J. A. Scalice, LP 6A-C K. W. Singer, LP 6A-C J. E. Semelsberger, EQB 2W-WBN J. A. West, MOB 2R-WBN Sequoyah Licensing Files, OPS 4C-SQN EDMS, WT 3B-K S:\\SHARED\\LROUSE\\SUBMIT\\COLR CYCLE 6.doc
L36 031009 805 QA Record WATTS BAR NUCLEAR PLANT, UNIT 1, CYCLE 6 CORE OPERATING LIMITS REPORT October 2003 Prepared:
Nuclear Vuel Date Reviewed:
&&~' i/&zs A4~ -Sr:
I
/
3 Reactor Engineering Supervisor /
Date Approve Opfayations Manager Date
_______________________________/' /0/o/
PORC Chairman Date Date of PORC PORC Meeting Affected Revision Approval Number Pages Reason for Revision 0
n/a n/a All Initial issue 1
n n/ a n/a All Early shutdown of cycle 5 2
n/a n/a 1 and 9 Add missing data to Figure 4 3
9/26/03 3989 1,3-4,13-18 consistency with TS I__ ___ _
I_
I__
nomenclature 4
20/z7/Q3All Redesign due to damage to
'ii 4 3 I__
_ _ _ _ _ _ _ _ _ _ _ assem bly G20 Unit 1 WATTS BAR Cycle 6 Revision 4 Page 1 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Watts Bar Unit 1 Cycle 6 has been prepared in accordance with the requirements of the Technical Specifications 5.9.5.
The Technical Specifications affected by this report are listed below:
3.1.4 Moderator Temp:erature Coefficient (MTC) 3.1.6 Shutdown Bank Insertion Limits 3.1.7 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))
3.2.2 Nuclear Enthalpy Rise Hot.Channel Factor (FtH")
3.2.3 Axial Flux Difference (AFD) 3.5.1 Accumulators 3.5.4 Refueling Water Storage Tank (RWST) 3.9.1 Boron Concentration 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in the Technical Specifications Section 5.9.5.
The following abbreviations are used in this section:
BOL Beginning of Cycle Life ARO All Rods Out HZP Hot Zero Thermal Power EOL End of Cycle Life RTP Rated Thermal Power Unit 1 Cycle 6 WAITS BAR Page 2 of 18 Revision 4
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign 2.1 MODERATOR TEMPERATURE COEFFICIENT - MTC (LCO 3.1.4) 2.1.1 The MTC limits are:
The BOLUAROIHZP - MTC shall be less positive than or equal to 0 AkJk/0F (upper limit). With the measured BOLJARO/HZP - MTC more positive than
-0.70 x 10` Ak/k/0F (as-measured MTC limit), establish control rod withdrawal limits to ensure the MTC remains less positive than or equal to 0 Ak/k/'F (upper limit) for all times in core life.
The EOLIARO/RTP - MTC shall be less negative than or equal to
-4.5 x 0 Ak/k/0F (lower limit).
2.1.2 The 300 ppm surveillance limit is:
The measured 300 ppm ARO/RTP-MTC should be less negative than or equal to
-3.75 x 10' AWk/k/F.
2.1.3 The 60 ppm surveillance limit is:
The measured 60 ppm /ARO/RTP-MTC should be less negative than or equal to
-4.28 x 104 Ak/k/F.
2.2 SHUTDOWN BANK INSERTION LIMITS (LCO 3.1.6) 2.2.1 The shutdown banks shall be withdrawn to a position greater than or equal to 225 steps withdrawn.
2.3 CONTROL BANK INSERTION LIMITS (LCO 3.1.7) 2.3.1 The control banks shall be limited in physical insertion as shown in Figure 1.
2.3.2 Table I shows the control rod overlap positions.
Unit 1 Cycle 6 WATTS BAR Page 3 of 18 Revision 4
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign 2.4 HEAT FLUX HOT CHANNEL FACTOR - F,(Z) (LCO 3.2.1)
FQ(Z) * [CFQ/ P]
K(Z) for P > 0.5 F0(Z) * [CFQ/ 0.5]
- K(Z) for P
- 0.5 Where P = Thermal Power Rated Thermal Power 2.4.1 CFQ = 2.50 2.4.2 K(Z) is provided in Figure 2.
2.4.3 FC(Z) = FQm(Z)
- 1.0815 where: FQM(Z) is the measured value of FQ(Z) obtained from incore flux map results and 1.0815 is a factor that accounts for fuel manufacturing tolerances and flux map measurement uncertainty.
2.4.4 FQW(Z) = FQC(Z)
- W(Z) where:
W(Z) values are provided in Figures 4 through 7. The figures provide sufficient information to determine W(Z) versus core height for all cycle burnups.
2.4.5 FQW(Z)
Penalty Factor The FQW(Z) penalty factor is provided In Table A. 1.
I Unit 1 WATTS BAR Cycle 6 Revision 4 Page 4 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign 2.5 NUCLEAR ENTHALPY RISE HOT CHANNEL FACTOR - FsHN (LCO 3.2.2)
FH F*
(1 + PF
(
P))
where P = Thermal Power Rated Thermal Power FAHRTP = 1.65 for RFA-2 fuel, and FwH
= 1.62 for VANTAGE+/PERFORMANCE+ fuel PF
=0.3 2.6 AXIAL FLUX DIFFERENCE - AFD (LCO 3.2.3) 2.6.1 The AFD limits for Cycle 6 are provided in Figure 3.
2.7 REFUELING BORON CONCENTRATION (LCO 3.9.1) 2.7.1 The refueling boron concentration shall be 2 2103 ppm.
2.8 ACCUMULATORS (LCO 3.5.1) 2.8.1 There are 240 tritium producing burnable absorber rods (TPBARs) in the reactor core for Cycle 6.
2.9 REFUELING WATER STORAGE TANK - RWST (LCO 3.5.4) 2.9.1 There are 240 tritium producing burnable absorber rods (TPBARs) in the reactor core for Cycle 6.
Unit 1 Cycle 6 WATTS BAR Page 5 of 18 Revision 4
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign I50 I
IIII III I I I I I~l I
I I
jl~~~I I
I Tl I
I11 I II EI3:=
1 4 (0.632, 231)J
. l ll m I I II
_ I I 1 I 1
_I Ll 11 T.i 231 225 200 I I I I I I I -
,g I I I I I I
z0.
Cn IL I-z 0
0:
z 00 I.
175 150 125 10C 75 5c 2Er 0
-~~~~~~~~~~~~J
_ Z F T g 4,0.6060225)lF
_ lill T~~~~~~~~~00
_ I I li I I L ll lT I 1
II l I l
_ I Ll I T~~~~~~~~~~~~~~~~~
_ hIZ & I _ I~~~~~~~~~~0 lTHA+WET3A 3f X ;+ 1 1 e B~~~~~~~~~~~~~~~~
' _ I 1l l Ll ll~~~l IC~r ^uI l -Ll L11 I r XT~~vIr
_~~~~~~~~~~~~~~~ ' 0lv sX'z TT IlL:l lII Il
§I 1111,1.NTl ll lI 11/11
, 01lT IlX IT Il I
i, I,
I I,
~~~~~~~10,IIX, II,l,,
_ I rl 1I T I III I I IIII llI Lll T_
7 X11 1 1
_ I I I I I l rl l l l l l l l l l l l l l l l l l l 0
0.20 0.40 0.60 0.80 FRACTION OF RATED THERMAL POWER 1.00 Figure 1 Control Bank Insertion Limits Versus Thermal Power Four Loop Operation Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of Ž225 and S 231 steps withdrawn.
Unit 1 WAITS BAR Cycle 6 Revision 4 Page 6 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign la 0) 0-a LL a)
.N 0z 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.1 0
i
~~~~~~Core Heioht_
0.000 1.000 6.000 1.000 i
_ ___12.000 0.9256 I
- _ a=
0 2
4 6
8 Core Height (feet) 10 Figure 2 K(Z) - Normalized F,(Z) as a Function of Core Height Unit 1 WAITS BAR Cycle 6 Revision 4 Page 7 of 18
A
-~
~~~~~~~...
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign 120 110 L-a) 0 Q.
I-a) co 0
-50
-40
-30
-20
-10 0
10 20 30 40 50 Flux Difference (Al) %
Figure 3 Axial Flux Difference Acceptable Operation Limits as a Function of Rated Thermal Power (RAOC)
Unit 1 WAITS BAR Cycle 6 Revision 4 Page 8 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign I I I I I I I I I I I I I I I I I I III II I I III 11
- H I I I I I I---
--U-LLLL
- Hill
- TT-I T-H -LL - -- :---
Jll-
-- Hill
- -I I I
Ili J H 1 1 7- -
- I-FFTT
- 11111111 - -- :---
_a I ID
- Hill 11111111 11111 lll 111111111 1 1111 401 1.
IN111111 11-111-11111 NHIMM11111 1111111111 11 I -LLLI
-JAAJ-L-.-l
-411ul 1.30 N
1.20 1.10 i i i i i i i i i i i i i i i i i i i i i ! i i i i i i i i i i i ! I I I I I.
I. I I 1 1 1 1 111-1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I i i i I m i I i I I I I i I I i I i I I i i i i r i I i i iA I I I i I i I i t i i I MM IMI !I11111 !MMMM M! IT! ll ll
........ I......................................
Height (teet) o.0000 0.2000 0.4000 0.6000 0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 5.8000.
6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 9.0000 9.2000 9.4000 1.2 9.6000 9.8000 TOP 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000 11.2000 11.4000 11.6000 11.8000 12.0000 Max W(z) 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.2820 1.2685 1.2526 1.2352 1.2169 1.1980 1.1787 1.1594 1.1394 1.1236 1.1158 1.1142 1.1141 1.1149 1.1160 1.1 17b 1.1190 1.1215 1.1229 1.1270 1.1374 1.1521 1.1653 1.1796 1.1951 1.2099 1.2232 1.2349 1.2449 1.2530 1.2591 1.2631 1.2646 1.2637 1.2602 1.2541 1.2452 1.2330 1.2206 1.2152 1.2149 1.2146 1.2102 1.2111 1.2176 1.2229 1.2303 1.2366 1.2409 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 I I I I I I I-I I I I I I I I I-( I I-m-H I-Ij I Ij I I-I-I h-I rd ill I I I I I I I I I.1 I I I I-Li IJ41-W-
.- 111111 IQ II11111 111411 11111 11111 11111
.- iiiiii I LI I11111 111111 11111 11111 11111 I I I I 1-1-1
-1.1 1-1-1111
-1 1-1.1 L 1 II11111 I 1111 11111 J=
111 11111 1 1111 11111 H il l
-i ii-i i i i U 111111111 H U-1 IM11111 11111 11111 111111 MIMMI1111 MM H JA III III III III III III III III III III III III III I J.
1.0 0--- -
0 1
2 3
4 5
6 7
8 9
10 11 BOTOK5 CORE HEIGHT (FEET)
Figure 4 RAOC Summary of Max W(z) at 150 MWD/MTU with HFP AFD Band of -12/+6 %
Cop and Bottom 10% Excluded)
Unit 1 WA1TS BAR Cycle 6 Revision 4 Page 9 of 8
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign 1.50 1.4 111111111111111111111111111111-1111111111111..
C.~~
II Hil _
I II II -iI illTI I IiII IT
§ l l lr @ 1l UliiiiI I..
.I....
I I..............................
C.
II I I
-l I
-1 I III I-I IIl u ii I I I 1
1 I I 1:
1 1 W il
.1 1
I 111111 11111 1
1 1
[11111:
- 11 :
1 11 III;::
1111 111111 111111 II 11111 I 1.30 1.2 11111111 1 1 1 1 1 1 1 1 111111111 1 11111 1 11 I:111 II
- I111
- 111 11111 lr 11117 11111ll
. - - - - - - - - - - - - - - - - - - - - - - - - - -iA
- 1 :
111
- 11 M il
- M
- IM 111 111-1^1 I I
Ml!l Helght (reet) 0.0000 0.2000 0.4000 0.6000 0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 5.8000 6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 9.0000 9.2000 9.4000 9.6000 12 9.8000 TOP 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000 11.2000 11.4000 11.6000 11.8000 12.0000 Max.
W(z) 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.2818 1.2679 1.2515 1.2335 1.2144 1.1947 1.1746 1.1546 1.1344 1.1231 1.1201 1.1174 1.1156 1.1132 1.1131 1.1153 1.1166 1.1176 1.1187 1.1185 1.1200 1.1329 1.1445 1.1572 1.1714 1.1850 1.1972 1.2082 1.2176 1.2253 1.2313 1.2353 1.2372 1.2370 1.2344 1.2294 1.2220 1.2120 1.1995 1.1937 1.1948 1.1999 1.2075 1.2145 1.2209 1.2287 1.2369 1.2439 1.2489 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 r
~.~ 1l 11 -l 11 11 11....... Il
.0I H :
- ii I '12 11111 I1 li IIITTITI
- 1.
1 1 1 111 1111111111111111 1 1111 1 1 111 l1 11 1.0 IX 'j L I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0
1 2
3 4
5 6
7 8
9 10 BOTTOM CORE EXIGHT (FEET)
Figure 5 RAOC Summary of Max W(z) at 3000 MWD/MTU with HFP AFD Band of -12/+6 %
(Top and Bottom 10% Excluded)
Unit 1 WATITS BAR Cycle 6 Revision 4 Page 0 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign 1.5c t ill I I I H il l ti ll III I ti ll 114 111 little lim it I
1111 I I lot I I I
I I I I I I I I I I I I I II1AI I 1q I1 41 l i t t l e t i l l I
1 1 1 1 Height (feet) lIlII 0.00Do 0.2000 II I IIII_
0.4000
_1 _
11111 0.6000 X1 X 11111 0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 61A HAA
-I ooo0 IPWI I II II 6.0000
- 1 1
.11 11 1
6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 I H-1 ILLL-
~
9.0000 9.2000 9.4000 9.6000 9.8000 TOP 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000 MVVD/MTU 11.2000
~~~~~11.4000 11.6000
!d) 11.8000 12.0000 Max.
W(z) 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.2660 1.2557 1.2431 1.2290 1.2141 1.1985 1.1826 1.1663 1.1498 1.1350 1.1268 1.1257 1.1248 1.1250 1.1258 1.1261 1.1261 1.1274 1.1289 1.1298 1.1330 1.1481 1.1644 1.1796 1.1936 1.2061 1.2172 1.2267 1.2344 1.2403 1.2442 1.2459 1.2455 1.2428 1.2376 1.2301 1.201 1.2071 1.1946 1.1872 1.1855 1.1840 1.1820 1.1800 1.1787 1.1786 1.1804 1.1850 1.1889 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
-,--I I III II II I I II II II II I 1 1 1 1 1 1 1 I 1 1 1 1 1 1 L I l i t t l e I I 1 1 1 1 1 1 I l i t t l e I 1 1 1 1 1 I I 1 1 1 1 1 1 I I I I I I I I I I I I I I I lit t l e 1-1.1.
I I
- - -111111
-1.
T TFF JOEL I
1.1 I 1 1 I1 1.0 A 1 Blow 1 9 I I I I
......... I. - - - - I 0
2 3
4 5
6 7
8 BOTTOM CORE HEIGHT (FEET)
Figure 6 RAOC Summary of Max W(z) at 10000 with HFP AFD Band of -121+(
(Top and Bottom 10% Excludi Unit 1 WAITS BAR Cycle 6 Revision 4 Page 11 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign 1.s0 1.4 I I I I I I I I I
I I I I I I I I I I I
I I I 1.111 LLLL_
ILL---
LLL -
. I _U
__ TFF
- a
- =
- Lm - 7 7- =
-111:1_
HM M. HiM M.. I.. M I................
- LI-1
- 11111111 ---
- II LL I I I I "-LL-I I I I I
- I LL111 _11 - - -
- -.- H LI
- I I I H LLL_
=
Full-I LUTI
- _LIjUI
_J1111111-1
-TUT-UJ1.11111M 1.30 N
1.20
.1-1 LL 1 1.1 1-1-1 1-1
- 11.11-1-Lu I-I Li III-111 -LUILIJ-1-1 -,.
D-M -JI-11 11111hvml -I Li IJ -1 J.-I.
JI-111-11-11 i -W 14 I I C-
-a-W Mii11 il. M! M
.1 M.I 1.7MIM!
1 il I I I I....................
............I........................ ---
Height (feet) 0.0000 0.2000 0.4000 0.6000 0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 5.8000 6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 9.0000 9.2000 9.4000 9.6000 9.8000 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000 11.2000 11.4000 11.6000 11.8000 12.0000 Max.
W(z) 1.0000 1.0000 1.0000 1.OOa 1.0000 1.0000 1.2660 1.2561 1.2441 1.2308 1.2168 1.2023 1.1875 1.1725 1.1567 1.1487 1.1481 1.1481 1.1507 1.1556 1.16Q5 1.1643 1.1674 1.1696 1.1703 1.1719 1.1781 1.1902 1.2046 1.2190 1.2319 1.2430 1.2521 1.2592 1.2643 1.2671 1.2677 1.2659 1.2618 1.2551 1.2460 1.2344 1.2203 1.2044 1.1926 1.1812 1.1678 1.1639 1.1660 1.1730 1.1810 1.1880 1.1944 1.1997 1.2032 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 I.........
. r r I I I I I I I I I I I I I I I I.
111111111 111 1111 li MI1 1
i ll II tAI
.1 2
3 4
5
- 6.....
- 8.
. 10 1
2 3
4 5
6
'7 8
9 10 t 3 12 CORE HEIGHT (FEET)
TOP Figure 7 RAOC Summary of Max W(z) at 16000 MWD/MTU with HFP AFD Band of -12/+6 %
(Top and Bottom 10% Excluded)
Unit 1 WAITS BAR Cycle 6 Revision 4 Page 12 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign Table A.1 FQ(Z) Penalty Factor Core Burnup (MWDMTU)
All burnups FQW(Z)
Penalty Factor 1.0200 Note:
- 1. 'the Penalty Factor, which is applied to F(Z) for compliance with Surveillance Requirement 3.2.1.2.a, is the maximum factor by which FQW(Z) is expected to increase per 31 Effective Full Power Days (EFPD) starting from the burnup at which the FW(Z) was determined.
Unit 1 WA`TS BAR Cycle 6 Revision 4 Page 13 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign Table 1: Control Rod Overlap Band A Bank B Bank C Bank D Bank Overlap Counter (steps) o 0
2 2
4 4
6 6
8 8
10 10 12 12 14 14 16 16 18 18 20 20 22 22 24 24 26 26 28 28 34 34 l
36, 36 38 38
+/-
40%
40 42 42 44 44 46 46 48 48 50 50 52 52 54 54 56 56 58 58 60 60 62 62 64 64 66 66 68 68 70 70 Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 72 72 74 74 76 76 78 78 80 80 82 82 84 84 86 86 88 88 90 90 92 92 94 94 96 96 98 98 100 100 102 102 104 104 106 106 108 108 110 110 112 112 114 114 116 116 118 118 120 120 122 122 124 124 126 126 128 128 0
130 130 2
132 132 4
134 134 6
136 136 8
138 138 10 140 140 12 142 142 14 Unit 1 WAITS BAR Cycle 6 Revision 4 Page 14 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign Table 1: Control Rod Overlap Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 144 144 16 146 146 18 148 148 20 150 150 22 152 152 24 154 154 26 156 156 28 158 158 30 160 160 32 162 162 34 164 164 36 166 166 38 168 168 40 170 170 42 172 172 44 174 174 46 176 176
.48 178 178 50 180 180 52 182-182 54 184 184 56 186 186 58 188 188 60 190 190 62 192 192 64 194 194 66 196 196 68 198 198 70 200 200 72 202 202 74 204 204 76 206 206 78 208 208 80 210 210 82 212 212 84 214 214 86 216 216 88 218 218 90 Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 220 220 92 222 222 94 224 224 96 226 226 98 228 228 100 230 230 102 232 232 104 234 106 236 108 238 110 240 112 242 114 244 116 246 1118 248 1120 250 122 252 124 254
-126 256 128
'0 258 130 1 2 260 132 4
262 134 6
264 136 8
266 138 10 268 140 (12 270 142 14 b
272 144 16 274 146 18 276 148 20 278 IS0 22 280 152 24 282 154 26 284 156 28 286 1 158 30 288 160 32 290 162
-34 292 164 36 294 1166 138 Unit I WATTS BAR Cycle 6 Revision 4 Page 15 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign Table 1: Control Rod Overlap Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 296 168 40 298 170 42 300 172 44 302 174 46 304 176 48 306 178 50 308 180 52 310 182 54 312 184 56 314 186 58 316 188 60 318 190 62 320 192 64 322 194 66 324 196 68 326 198 70 328 200 72 330 202 74 332 204 76 334-206 78 336 208 80 338 210 82 340 212 84 342 214 86 344 216 88 346 218 90 348 220 92 350 222 94 352 224 96 354 226 98 356 228 100 358 230 102 360 232 104 362 106 364 108 366 110 368 112 Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 370 114 372 116 374 l
118 376 120 378 122 380 124 382 126 384 128 0
386 130 2
388 132 4
390 134 6
392 136 8
394 138 10 396 1
40 12 398 142 14 400 144 16 402 l
146 18 404 1 148 20 406 150 22 408 152 24 410 j _
154 26 412 156 28 414 158 30 416 160 32 418 162 34 420 164 36 422 166 38 424 168 40 426 170 42 428 172 44 430 174 46 432 176 48 434 178 50 436 180 52 438 182 54 440 184 56 442 186 58 Unit 1 WAITS BAR Cycle 6 Revision 4 Page 16 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign Table 1: Control Rod Overlap Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 444 188 60 446 190 62 448 192 64 450 194 66 452 196 68 454 198 70 456 200 72 458 202 74 460 204 76 462 206 78 464 208 80 466 210 82 468 212 84 470 214 86 472 216 88 474 218 90 476 220 92 478 222 94
- 480, 224 96 482'.
226 98 484 228 100 486 230 102 488 232 104 490 106 492 108 494 110 496 112 498 114 S00 116 502 118 504 120 506 122 508 124 510 126 512 128 514 130 516 132 Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 518 134 520 136 522 138 524 140 526 142
.528 144 530 146 532 148 534 I _
150 536 I
152 538 154 540 j
156 542 i
158 544 1
160 546 162 548 164 550 I
166 552 168 554 170 556
.172 558 174 560 176 562 178 564 180 566 182 568 184 570 186 572 188 574 190 576 192 578 194 580 196 582 198 584 200 586 202 588 204 590
_ j _ _ _ _ 206 Unit 1 WAITS BAR Cycle 6 Revision 4 Page 17 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Redesign Table 1: Control Rod Overlap Band A Bank B Bank C Bank D Bank Overlap Counter (steps)__
592 208 594 210 596 212 598 214 600 216 602 218 604 220 606 r 222 608 224 610 1226 612 228 614 230 616 232 This information is provided in 2 step increments.
One step increments can be derived by interpolation.
Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of >225 and <231 steps withdrawn. The Table indicates a maximum step of 232 to be consistent with 2 step increments.
Unit I WATTS BAR Cycle 6 Revision 4 Page 18 of 18
L36 030925 800 QA Record WATTS BAR NUCLEAR PLANT, UNIT 1, CYCLE 6 CORE OPERATING LIMITS REPORT, REVISION 5(
'1 IMPLEMENTATION LIMITED TO MODE 6 AND MODE 5 September 2003 Prepared:
N Fuel
/ 4c.. A?-.
r,
-u I
I Nur Fuel
'a' Date Reviewed:
I-yI s-':,**
I,
3 Reactor Engieering'Supervisor Date Appr I' AL Z-
-/A)
I 9/A
-3 Q~rations Manager Date PORC Chairman Date Date of PORC PORC Meeting Affected Revision Approval Number Pages Reason for Revision 0
n/a n/a All Initial issue 1
n/a n/a All Early shutdown of cycle 5 2
n/a n/a 1 and 9 Add missing data to Figure 4 3
9/26/03
'5 34,3.8 consistency with TS
_ 'AS"~?)L/~ S nom enclature Unit 1 WATTS BAR Page 1 of 18 Cycle 6 RevisionX'-
e./)
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Watts Bar Unit 1 Cycle 6 has been prepared in accordance with the requirements of the Technical Specifications 5.9.5.
The Technical Specifications affected by this report are listed below:
3.1.4 Moderator Temperature Coefficient (MTC) 3.1.6 Shutdown Bank Insertion Limits 3.1.7 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor (F,(Z))
3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FH')
3.2.3 Axial Flux Difference (AFD) 3.5.1 Accumulators 3.5.4 Refueling Water Storage Tank (RWST) 3.9.1 Boron Concentration 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in the Technical Specifications Section 5.9.5.
The following abbreviations are used in this section:
BOL Beginning of Cycle Life ARO All Rods Out HZP Hot Zero Thermal Power EOL End of Cycle Life RTP Rated Thermal Power Unit 1 Cycle 6 WNATTS BAR Page 2 of 18 Revision 1
COLR for Watts Bar Unit, Cycle 6 - TPC Design 2.1 MODERATOR TEMPERATURE COEFFICIENT - MTC (LCO 3.1.4) 2.1.1 The MTC limits are:
The BOIJARO/HZP - MTC shall be less positive than or equal to 0 k/°F (upper limit). With the measured BOLAROIHZP - MATC more positive than
-0.70 x 10 ' ALdcld0F (as-measured MTC limit), establish control rod withdrawal limits to ensure the MTC remains less positive than or equal to 0
&/kf°F (upper limit) for all times in core life.
The EOIJARO/RTP - MTC shall be less negative than or equal to
-4.5 x 104 Ak/k1PF (lower limit).
2.1.2 The 300 ppm surveillance limit is The measured 300 ppm AROJRTP-MTC should be less negative than or equal to
-3.75 x 10' Ak/
0 F.
2.1.3 The 60 ppm surveillance limit is:
The measured 60 ppm /AROIRTP-MTC should be less negative than or equal to
-4.28 x 104 Ak/kI0F.
2.2 SHUTDOWN BANK INSERTION LIMITS (LCO 3.1.6) 2.2.1 The shutdown banks shall be withdrawn to a position greater than or equal to 225 steps withdrawn.
2.3 CONTROL BANK INSERTION LIMITS (LCO 3.1.7) 2.3.1 The control banks shall be limited in physical insertion as shown in Figure 1.
2.3.2 Table 1 shows the control rod overlap positions.
Unit 1 Cycle 6 WATTS BAR Page 3 of 18 Revision 3
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 2.4 HEAT FLUX HOT CHANNEL FACTOR - FQ(Z) (LCO 3.2.1)
Fq(Z) [CFQIPJ*K(Z) for P>0.5 FQ(Z) < [CFQ/ 0.5]
- K(Z) for P
- 0.5 Where P = Thermal Power / Rated Thermal Power 2.4.1 CFQ = 2.50 2.4.2 K(Z) is provided in Figure 2.
2.4.3 FQc(Z) = Fq"'(Z) 1.0815 where: F(Z) is the measured value of FQ(Z) obtained from incore flux map results and 1.0815 is a factor that accounts for fuel manufacturing tolerances and flux map measurement uncertainty.
2.4.4 FQW(Z) = Fq&(Z)
W(Z) where:
W(Z) values are provided in Figures 4 through 7.
The figures provide sufficient information to determine W(Z) versus core height for all cycle burnups.
2.4.5 FQW(Z) 'Penalty Factor The FCw(Z) penalty factor is provided in Table Ap.
Unit 1 Cycle 6 WATS BAR Page 4 of 18 Revision 3
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 2.5 NUCLEAR ENTHALPY RISE HOT CHANNEL FACTOR - Fa 3 N (LCO 3.2.2)
F'Sti <F
- ( +PF 1l-P))
where P = Thermal Power / Rated Thermal Power F&HX1
= 1.65 for RFA-2 fuel, and Faze = 1.62 for VAN1TAGE+/PERFOR'MANCE+ fuel PF
= 0.3 2.6 AXIAL FLUX DIFFERENCE -AFD (LCO 3.2.3) 2.6.1 The AFD limits for Cycle 6 are provided in Figure 3.
2.7 REFUELING BORON CONCENTRATION (LCO 3.9.1) 2.7.1 The refueling boron concentration shall be > 2103 ppm.
2.8 ACCUMULATORS (LCO 3.5.1) 2.8.1 There are 240 tritium producing burnable absorber rods (TPBARs) in the reactoi-core for Cycle 6.
2.9 REFUELING WATER STORAGE TANK - RWST (LCO 3.5.4) 2.9.1 There are 240 tritium producing burnable absorber rods (TPBARs) in the reactor core for Cycle 6.
Unit 1 Cycle 6 WATTS BAR Page 5 of 18 Revision 1
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 250 231 225 200 0
0 uJ I-z 0*
0.
z 00a:
(0.074,231) 606.
I I I T I
I 0011 Ole 175 150 125 1 00 i 1 9 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 : 1 1 17F 1 1 1 I II rm I
Vi-I I i i I
i i I I i W fi i M i I I M ! 3F i --. - ---
CD H
.I...
.......... I----i-I 75 i........
. I....... I..
11 1 1 1 I 1 1 A 1 1 1 1 1 !--I N-I- I I I I I. I I.
I I I I I I I I I I I I I I 1-1-1 1-41 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 50 25 0
I Y1 oe 0
0.20 OA0 0.60 0.80 FRACTION OF RATED THERMAL POWER 1.00 Figure 1 Control Bank Insertion Limits Versus Thermal Power Four Loop Operation Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of 2 225 and < 231 steps withdrawn.
Unit 1 WAITS BAR Cycle 6 Revision 1 Page 6 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 1.2 1.1 1.0 0.9 0.8 Q
3 0.7 LL 0.6 N
= 0.5 0z 0.4 0.3 0.2 0.1 0
FCoe Height K(
0.000 1.000 j ~~~~~6.000 1.000 123.000 0.9256 0
2 4
6 8
Core Height (feet) 10 12 Figure 2 K(Z) - Normalized F,(Z) as a Function of Core Height Unit 1 WArITS BAR Cycle 6 Revision 1 Page 7 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 120 110 100 90 00-
-a E
-c
.3 80 70 60 50 40 30 20 10 0
-50
-40
-30
-20
-10 0
10 20 30 40 50 Flux Difference (Al) %
Figure 3 Axial Flux Difference Acceptable Operation Limits as a Function of Rated Thermal Power (RAOC)
Unit 1 WATTS BAR Cycle 6 Revision 1 Page 8 of 18
COLR for Watts Bar Unit, Cycle 6 - TPC Design
'LI 1
'111111111111111111'i i
1111ii
! i i i i Ii i
!!! 111111 11111 MIMI IMMMMM!
................. I.........-...........
i1-n.
1 I I I I I I I I I I I I I I I f
I I I I I I I I I I I I I I
I............
i i i I i I i i i i1111111 111111111 111111111.
1111111111 H H -H ii H I,11111 11111 11111 1.30 1.20
... I..........................
11 !!'!.!!111111 MM11111 Ill I!11111 Mill I..............................
ill 111111 111111111 N1111111 I N I I I I ill I I 1111 11 11N11 1111W ll 1-
I I I I I I I II I I I I I I I I I I I I I I Ij I I I I I I I I I I I I It 1 1,....
I I I I I LI I I I II 4a I
I I LLLL I
-1 H Height (reet) 0.0000 0.2000 0.4000 0.6000 0.800U 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5._0000 5.2000 5.4000 5.6000 5.8000 6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.000 B.2000 9.4000 8.6000 8.8000 9.0000 9.2000 9.4000 9.8000 TOP 10.0000 10.2000 II.4000
- 10. 6000 10.8000 11.0000 U
~~~11.2000 11.4000 11.6000 11.8000 12.0000
&12x.
W(z) 1.000U 1.0000 1.0000 1.0000 1.0000 1.0000 1.2820 1.2685 1.2526 1.2352 1.2169 1.1980 1.1787 1.1594 1.1394 1.1236 1.11 58 1.1142 1.1141 1.1149 1.1160 1.1170
.1190 1.1215 1.1229
- 1. 1270 1.1374 1.1521 1.1653 1.179G
.1951 1.2099 1 2232 1.2349 1.2449 1.2530 1.2591 1.2631 1.2646 1.2637 1.2602 1.2541 1.2452 1.2330 1.2206 1.2152 1.2 49 1.2146 1.2102 1.2111 1.2176 1.2229 1.2303 1.2366 1.24n9 1.0000 1.0000 1.00co 1.0000 1.0000 1.0000 l.lC(
1.00JAALJ I I I I I II II 1 11 1 1 11 1 1 1 1 11 1 I I I 0
1 2
3 4
5 6
7 a
9 10 BOTTOM CORE HEIGHT (FEET)
Figure 4 RAOC Summary of Max W(z) at 150 MWD/MT with HFP AFD Band of -121+6 %
(Top and Bottom 10% Excluded)
Unit I WATTS BAR Cycle 6 Revision 2 Page 9 of 8
i COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 1.so 1.40 1.30 CE I... I.. II 111111--11 1111111111..II II II.
I I I I
I I T I I1 I
I.r 11 -,....
T.r............
................................ I........
III! I It' liii!
liii It 11111111111111111111111111111 N
1.2 1.10 im
- nimm imi i
nimpnll APii n
I IIAII
... I I I I I I i I I I I I
I I I. I I I 1 i I F I I I I I 1
I... I Height Max.
(feet)
W(z) 0.0000 1.0000 0.2000 1.0000 0.4000 1.0000 0.6000 1.0000 0.8000 1.0000 1.0000 1.0000 1.2000 1.2818 1.4000 1.2679 1.6000 1.2515 1.8000 1.2335 2.0000 1.2144 2.2000 1.1947 2.4000 1.1746 2.6000 1.1546 2.8000 1.1344 3.0000 1.1231 3.2000 1.1201 3.4000 1.1174 3.6000 1.1156 3.8000 1.1132 4.0000 1.1131 4.2000 1.1153 4.4000 1.1166 4.6000 1.1176 4.8000 1.1187 5.0000 1.1185 5.2000 1.1200 5.4000 1.1329 5.6000 1.1445 5.8000 1.1572 6.0000 1.1714 6.2000 1.1850 6.4000 1.1972 6.6000 1.2082 6.8000 1.2176 7.0000 1.2253 7.2000 1.2313 7.4000 1.2353 7.6000 1.2372 7.8000 1.2370 8.0000 1.2344 8.2000 1.2294 8.4000 1.2220 8.6000 1.2120 8.8000 1.1995 9.0000 1.1937 9.2000 1.1948 9.4000 1.1999 9.6000 1.2075 9.8000 1.2145 DP 10.0000 1.2209 10.2000 1.2287 10.4000 1.2369 10.6000 1.2439 10.8000 1.2489 11.0000 1.0000 11.2000 1.0000 11.4000 1.0000 11.6000 1.0000 11.8000 1.0000 12.0000 1.0000 Cycle 6 Revision 1 MII :
I M11111111111111111111i 1IM111 I IM ::
t 1111 1111 11111 M
M1111 1111 1111 1 T 11 I I I I I I I I 11 I 11 11 I I1 I I I1 I I I I 1 11 1 I
1.00 I 1 1 1 1 1 I 1 LI 0
1 2
3 4
5 6
7 8
9 10 11 1
BOTTOM CORE EIGHT (FEET)
TC Figure 5 RAOC Summary of Max W(z) at 3000 MWD/MTU with HFP AFD Band of -121+6 %
(Top and Bottom 10% Excluded)
Unit 1 WAIS BAR Page 10 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 11 11 11 lI II 11 11 III II I III I III I 11 11 11-Ll l 111111111 i! i 1 11 11 11 1 11 1 1 1 11 1 11 11 1 11 11 1 111 1I L1.1-11 11 11111 1 111 11 11 1 1 11 111111 L
40 1 11 11 111 11 11 111 11 11 1 1 11 11 111 1
- - - - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-I 1.
iiiii l 1111111111111111ilii 11ili 111111 I
!1 1 !I!!! !I I MII! M M111111111111 11 1111111 1.30 N
1 I II I i I
.I I
.I I II.II I I It I I I I II I II I IIIII I I I I 1 P1 1-...
11 111....11111 s I IIIII I 1 1 1 1 1 1 T I 1 1 1 1 1 1 1 1 i 1 1 1 1 14 1 1 1 1 1 1 1 1 PI 1 1 1 1 1 1 1 1 1 1
- a. -
11 11 111 MUM 11 11 111 MMMM M llrMM.V11 Height (feet) 0.0000 0.2000 0.4000 0.6000 0.8000 1.0000 1.2000 1.4000 1.000 1.8000 2.0000 2.2000 2.4000 2.6000 2.8000 3.0000 3.2000 3.4000 3.6000 3.8000 4.0000 4.2000 4.4000 4.6000 4.8000 5.0000 5.2000 5.4000 5.6000 5.8000 6.0000 6.2000 6.4000 6.6000 6.8000 7.0000 7.2000 7.4000 7.6000 7.8000 8.0000 8.2000 8.4000 8.6000 8.8000 9.0000 9.2000 9.4000 12 9.6000 9.8000 TOP 10.0000 10.2000 10.4000 10.6000 10.8000 11.0000 11.2000 11.4000 11.6000 11.8000 12.0000 Max.
W(z) 1.0000 1.0000 1.0000 1.OO0 1.0000 1.0000 1.2660 1.2557 1.2431 1.2290 1.2141 1.1985 1.1826 1.1663 1.1498 1.1350 1.1268 1.1257 1.1248 1.1250 1.1258 1.1261 1.1261 1.127t 1.1289 1.1298 1.1330 1.1481 1.1644 1.1796 1.1936 1.2061
-1.2172 1.2267 1.2344 1.2403 1.2442 1.2459 1.2455 1.242S 1.2376 1.2301 1.2201 1.2071 1.1946 1.1872 1.1855 1.1840 1.1820 1.1800 1.1787 1.1786 1.1804 1.1850 1.1889 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 i
1 1 1 1 1 1 1 1 1 1.
1 1 1 1 1 1 1 1 1 1.1 I
I I P-1 1
1 111111 f 1111111 I I 1 I
1111111 I 1111111111111111111111111111 11 11 11111111111
.1-n.0 I
l 1 1 l i I l l lll I I l l ll ll 1
l ll II ll
- Lul s
x l
s s
- s s
E E
- iQd, 0
1 2
3 4
5 6
7 8
9 10 21 BOTTOM CORE HEIGHT (FEET)
Figure 6 RAOC Summary of Max W(z) at 10000 MWD/MTU with HFP AFD Band of -12+6 %
(Top and Bottom 10% Excluded)
Unit 1 WATTS BAR Cycle 6 Revision 1 Page 11 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design 1.50 1.40 1.30 N
1.20
- I I I
l I lIIII 11 m II-m1 I II I
- II I; 11111111111111I11 1111
-~~~~~rT T
I I
I I TTTTT-I I
- =
I : -1111 I
ET~ll
~~~~~.
I liii '11i 1 lI'IlI11111 I M
! 11
. 11 11111 11 Il I I 1M 1111111 11 Hl 11 I II it
.1 11
.l.II I llTTII 11 1111111 I
11 I I 11 11 11 11 I I 11 11 I 11 11 1 I 11 4-4+1 1 1-1 III III III III III II III 1-!MAj III 11 11114 1111 111111 11111 1114A III II _I i ! i I I I I I
_2.
§llllll1l1111_.......l 1 1 H111111'1111111
.1 ill I
1M lt111 Mull IHHLII 11 IiLiIL Height M;
(feet)
W 0.0000 1.0 0.2000 1.C 0.4000 1.0 0.6000 1.C 0.8000 1.C 1.0000 1.0 1.2000 1.2 1.4000 1.2 1.6000 1.2 1.8000 1.2 2.0000 1.2 2.2000 1.
2.4000 1.1 2.6000 1.1 2.8000 1.1 3.0000 1.1 3.2000 1.1 3.4000 1.1 3.6000 1.1 3.8000 1.
4.0000 1.
4.2000 1.2 4.4000 1.2 4.6000 1.
4.8000 1.
5.0000 1.1 5.2000 1.:
5.4000 1.
5.6000 11 5.8000 1.S 6.0000 1.S 6.2000 1S 6.4000
-1.!
11 6.6000 1.
6.8000 1.
7.0000 1.S 7.2000 1.:
7.4000 1.:
7.6000 1.:
7.8000 1.
8.0000 12 8.2000 1.:
8.4000 1.:
8.600 1.:
8.8W00 1.:
9.0000 1.
9.2000 1!2 abt 9.4000 1.
12 9.6000 1.-
9.8000 1.
TOP 10.0000 1.
10.2000 1.
10.4000 1.
10.6000 1.
10.8000 1.
11.0000 1.
112000 1.
11.4000 1.1 11.6000 1.'
11.8000 1.
12.0000 1.
Cycle 6 Revision 1 Xz) p000 000 000 1000
)00
.660
.561
.441
.308
.168
.02.3
.875
.725 157
.487 1481 1481 L507 LS56 L605 L643 L674 L696 L703 L719 L781 L902 2046 2190 2319 2430 2521 2592 2643 2671 2677 2659 2618 2551 2460 2344 2203 2044 1926 1812 1678 1639 1660 1730 1510 1880 1944 1997 2032 0000 0000 0000 0000 0000 0000 l
+
l l,1 1 1 1 l I 1.11 K~~~~~~~fl~
~~
~l C:
- : : 111111111111 11 : t 1
.1-11 li
.III
- 11.
I............
1_0
._. _4.. _.
.lllll1m 0
2 2
3 4
5 6
7 8
9 10 11 BOT CORE HEIGHT (FEET)
Figure 7 RAOC Summary of Max W(z) at 16000 MWDIMTU with HFP AFD Band of -121+6 %
(Top and Bottom 10% Excluded)
Unit 1 WA1TS BAR Page 12 of 18
I COLR for Watts Bar Unit I, Cycle 6 - TPC Design Table A-1 FQW(Z) Penalty Factor Core Burnup (MWD/MTU) 8149 8300 8450 8601 8752 FQ'W(Z)
Penalty Factor 1.0200 1.0208 1.0212 1.0203 1.0200 a
Notes:
- 1. The Penalty Factor, which is applied to FQW(Z) for compliance with Surveillance Requirement 3.2.1.2.a, is the maximum factor by which Fw(Z) is expected to increase per 31 Effective Full Power Days (EFPD) starting from the burnup at which the Fw(Z) was determined.
- 2. Linear interpolation is adequate for intermediate cycle burnups.
- 3. For all cycle burnups outside the range of the table, a penalty factor of 1.020 shall be used for compliance with Surveillance Requirement 3.2.1.2.a.
Unit 1 WATTS BAR Cycle 6 Revision 3 Page 13 of 18
I COLR for Watts Bar Unit 1, Cycle 6 - TPC Design Table 1: Control Rod Overlap Band A Bank B Bank C Bank D Bank Overlap Counter (steps) o o
2 2
4 4
6 6
8 8
10 10 12 12 14 14 16 16 18 18 20 20 22 22 24 24 26 26 28 8
30 30 32 32 34 34 36 36 38 38 40 40 42 42 44 44 46 46 48 48 60 60 52 52 54 54 56 56 58 58 60 60 62 62 64 64 66 66 68 68 70 70 Band ABank BBank CBank D Bank Overlap Counter (steps) 72 72
- 74 74 76 76 78 78 80 80 82 82 84 84 86 86 88 88 90 90 92 92 94 94 96 96 98 98 100 100 102 102 104 104 106 106 108 108 110 110 112 112 114 114 116 116 118 118 120 120 122 122 124 124 126 126 128 128 0
130 130 2
132 132 4
134 134 6
136 136 8
138 138 10 140 140 12 142 142 14 Unit 1 WA[TS BAR Cycle 6 Revision 3 Page 14 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design Table 1: Control Rod Overlap Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 144 144 16 146 1 146 18 148 148 20 150 150 22 152 152 24 154 154 26 156 156 28 158 158 30 160 160 32 162 162 34 164 164 36 166 166 38 168 168 40 170 170 42 172 172 44 174 174 46 176 176 48 178 178 50 160 180 52 182.
182 54 184 184 56 186 186 68 188 188 60 190.
190 62 192 192 64 194 194 66 196 196 68 198 198 70 200 200 72 202 202 74 204 204 76 206 206 78 208 208 80 210 210 82 212 212 84 214 214 B6 216 216 88 218 218 90 Band A Bank B Bank CBank D Bank Overlap Counter (steps) 220 220 92 222 222 94 224 224 96 226 226 98 228 228 100 230 230 102 232 232 104 234 106 23G 108 238 110 240 112 242 114 244 116 246 118 248 120 250 122
-252 124 254 126 256
-128 0
258 130 2
260 132 4
262 134 6
264 136 B
266 138 10 268 140 12 270 142 14 272 144 16 274 146 18 276 148 20 278 IS0 22 280 152 24 282 154 26 284 156 28 286 158 30 288 160 32 290 162 34 292 164 36 294 166 38 Unit 1 WAITS BAR Cycle 6 Revision 3 Page 15 of 18
COLR for Watts Bar Unit 1, Cycle 6 - TPC Design Table 1: Control Rod Overlap Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 296 168 40 298 170 42 300 172 44 302 174 46 304 176 48 306 178 50 308 180 52 310 182 54 312 184 66 314 186 58 316 188 60 318 190 62 320 192 64 322 194 66 324 196 68 326 198 70 328 200 72 330 202 74 332 204 76 334 206 78 336 208 80 338 210 82 340.
212 84 342-214 86 344 216 88 346 218 90 348 220 92 350 222 94 352 224 96 354 226 98 356 228 100 358 230 102 360 232 104 362 106 364 108 366 110 368 112 Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 370 114 372 116 374 118 376 120 378 122 380 124 382 126 384 128 0
386 130 2
388 132 4
390 134 6
392 136 a
394 138 10 396 140 12 398 142 14 400 144 16
-402 146 18 404 148 20 406 150 22 408 j 152 24 410 154 26 412 156 28 414 158 30 416 160 32 418 162 34 420 164 36 422 166 38 424 168 40 426 170 42 428 172 44 430 174 46 432 176 48 434 178 50 436 180 62 438 182 54 440 184 6
442 186 58 Unit 1 WATTS BAR Cycle 6 Revision 3 Page 16 of 18
COLR for Watts Bar Unit 1. Cycle 6-TPC Design Table 1: Control Rod Overlap Band ABank BlBank CBank DIBank Overlap Counter (steps) 444 188 60 446 190 62 448 192 64 450 194 66 452 196 68 454 198 70 456 200 72 458 202 74 460 204 76 462 206 78 464 208 80 466 210 82 i 468 212 84 470 214 86 472 216 88 474 218 90 476 220 92 478 222 94 480 224 96 482 226 98 484 228 100 486 230 102 488.
232 104 490-106 492 108 494 110 496 112 498 114 500 116 502 118 604 120 506 122 508 124 510 126 512 128 514 130 516 132 Band A Bank B Bank C Bank D Bank Overlap Counter (steps) 518 134 520 136 522 138 524 140 526 142 528 144 530 146 532 148 534 150 536 152 538 154 540 156 542 158 544.
160 546 162 548 164 550 166 652 168 664 170 556 172 558 174 560 176 562 178 564 180 566 182 568 184 570 186 572 188 574 190 576 192 578 194 680 196 582 198 584 200 586 202 588 204 590 206 Unit 1 WATTS BAR Cycle 6 Revision 3 Page 17 of 18
7 COLR for Watts Bar Unit 1. Cycle 6 - TPC Design Table 1: Control Rod Overlap Band ABank B Bank CBank DRank Overlap Counter (steps) 592 208 594 210 596 212 698 214 600 216 602 218 604 220 606 222 608 224 610 226 612 228 614 230 616 232 This information is provided in 2 step increments.
One step increments can be derived by interpolation. Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of 225 and 5231 steps withdrawn. The Table indicates a maximum step of 232 to be consistent with 2 step increments.