September 2003 Monthly Operating Report for Oyster Creek
ML032970410
Person / Time
Site: Oyster Creek
Issue date: 10/15/2003
From: Harkness E
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-03-20265, GL-97-002
Download: ML032970410 (2)


Text

AmerGen SM AmerGen Energy Company, LLC An Exelon/British Energy Company Oyster Creek US Route 9 South P.O. Box 388 Forked River, NJ 08731-0388 GL 97-02 October 15 20OB 2130-03-20265 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219

Subject:

Monthly Operating Report - September 2003 Enclosed is the September 2003 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.

If any further information or assistance is needed, please contact William Stewart at 609-971-4775.

Sincerely, Ernest J. Harkness P. E.

Vice President, Oyster Creek Generating Station EJH/WVS Enclosures - Operating Data Report cc:

H. J. Miller, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek J. Herrera, USNRC Senior Resident Inspector, Oyster Creek File No. 03001

. ~

~

~

~

~

~

~

.~~ ~ ~~~~

~~~

~~~~~~~~~~~~~~~~~~~

Z !.:..: : : X

  • 7#'-,*.eh-.'}.,

Report Viewer Page 1 of 2 Renrt Viewer Page I of 2 OPERATING DATA REPORT DOCKET NO.

5 UNIT NAME C

DATE C

COMPLETED BY V

TELEPHONE Tf REPORTING PERIOD:

0-219

)yster Creek 1

)ctober 10, 2003

i. V. Stewart 309) 971-4775 September 2003
1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 650.00 619.00 Is Month Yrh-tD a

-3.

Number of Hours the Reactor-was Critical

__720.00 L

6,306.92--

4.

Number of Hours Generator On-line 720.00 6,259.45

5.

Reserve Shutdown Hours 0.00 0.00

6.

Net Electrical Energy Generated (MWHrs) 447,339.00 3,864,761.00

-21 6,228.02.

211,986.65 918.20 121,003,189.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments 1

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

During September, Oyster Creek generated 447,339 net MWh electric, which was 100.4% of its MDC rating.