October 28, 2003 LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Davis-Besse Nuclear Power Station, Unit 1
SUBJECT:
SUMMARY
OF MEETING ON OCTOBER 21, 2003, TO DISCUSS THE LICENSEES MODIFICATIONS TO THE HIGH PRESSURE INJECTION PUMPS (TAC NO. MB9667)
On October 21, 2003, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with FirstEnergy Nuclear Operating Company (the licensee), representatives at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, MD. The meeting was also video-conferenced with NRC staff at Region III. The purpose of the meeting was to discuss the licensees modifications to the Davis-Besse high pressure injection (HPI) pumps.
The meeting was a Category 1 public meeting with an audioconference bridge available for those unable to attend in person. The meeting was noticed on October 3, 2003, with the agenda (ADAMS No. ML032760206). The licensees presentation slides were available on the NRC Web site for the meeting and were placed in ADAMS following the meeting (ADAMS No.
ML032950134). Enclosure 1 is a list of attendees.
The licensees presentation included background information on the HPI pump and the problems associated with potential debris accumulation in the pump hydrostatic bearing and a discussion of the licensees initial approach to solving the problem using a self-flushing strainer.
The licensee discussed that some of the key original assumptions they made were proved invalid during developmental testing, which resulted in their revising the strainer design. The developmental testing also resulted in the licensee deciding to remove all fibrous material from the containment, with the exception of about 1 cubic foot of pipe insulation that was irremovable. The licensee discussed their qualification testing of the strainer design and results, and their conclusion that the testing demonstrates that the HPI pumps will meet design criteria. The licensee noted that their test results are preliminary and are still undergoing final review and acceptance by management. The licensee responded to questions from the NRC staff throughout and at the conclusion of their presentation. Members of the public asked the NRC staff (1) for clarification of the licensees explanation of the debris accumulation pattern on the strainer, (2) what NRC evaluations remained to be done on the issue, (3) for clarification of the licensees interaction with the French pump manufacturer, and (4) the generic impact of soft fibrous material on other components in containment. The NRC staff expressed appreciation to the licensee for the presentation and noted that NRC evaluation of the issue and the licensees modification to the HPI pumps has not been completed. Following the licensees final review, the NRC staff will complete its review and, pending any additional questions, make a recommendation for closure to the IMC 0350 Davis-Besse Oversight Panel.
/RA/
Carl F. Lyon, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
Attendance List cc w/encl: See next page the licensee for the presentation and noted that NRC evaluation of the issue and the licensees modification to the HPI pumps has not been completed. Following the licensees final review, the NRC staff will complete its review and, pending any additional questions, make a recommendation for closure to the IMC 0350 Davis-Besse Oversight Panel.
/RA/
Carl F. Lyon, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
Attendance List cc w/encl: See next page DISTRIBUTION:
PUBLIC PDIII-2 Reading TMarsh/ELeeds WRuland AMendiola JHopkins THarris OGC ACRS/ACNW HNieh CLipa, RIII MKotzalas ADAMS Accession Number: ML032950560 OFFICE PDIII-2/PM PDIII-2/LA PDIII-1/SC NAME FLyon THarris AMendiola DATE 10/23/03 10/23/03 10/28/03 OFFICIAL RECORD COPY
Davis-Besse Nuclear Power Station, Unit 1 cc:
Mary E. OReilly FirstEnergy Corporation 76 South Main St.
Akron, OH 44308 Manager - Regulatory Affairs FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State - Route 2 Oak Harbor, OH 43449-9760 Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60523-4351 Michael A. Schoppman Framatome ANP 1911 N. Ft. Myer Drive Rosslyn, VA 22209 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Randel J. Fast, Plant Manager FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State - Route 2 Oak Harbor, OH 43449-9760 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General Department of Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH 43604-6506 David Lochbaum, Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20006 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515 The Honorable Dennis J. Kucinich, Member United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107 Mr. James P. Riccio Nuclear Policy Analyst Greenpeace 702 H. Street, NW, Suite 300 Washington, DC 20001 Paul Gunter Director Nuclear Watchdog Project Nuclear Information & Resource Service 1424 16th Street NW Suite 401 Washingon, DC 20009
ATTENDANCE LIST NRC MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY DAVIS-BESSE HPI PUMP MODIFICATIONS OCTOBER 21, 2003 J. ONeill, FENOC J. Powers, FENOC R.Coward, MPR Associates R. Schrauder, FENOC G. Leidich, FENOC J. Hagan, FENOC A. Mendiola, NRC J. Grobe, NRC W. Ruland, NRC E. Imbro, NRC S. Unikewicz, NRC C. Grimes, NRC L. Marsh, NRC D. Terao, NRC W. Lyon, NRC D. Lochbaum, UCS G. Wright, Gannett D. Warner, McGraw-Hill D. Wuokko, FENOC D. Raleigh, Scientech J. Strnisha, NRC F. Lyon, NRC M. Phillips, NRC A. Dunlop, NRC