ML032940249
| ML032940249 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/09/2003 |
| From: | Danni Smith Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 219-02871-DMS/JMM | |
| Download: ML032940249 (5) | |
Text
IAM A subsidiary of Pinnackc West Capital Corporation David M. Smith Operations Director Palo Verde Nuclear Generating Station Tel. 602-393-2656 Fax 602-393-1806 e-mail:
David M Smith(aapsc.com Mail Station 7294 PO Box 52034 Phoenix, Arizona 85072-2034 October 9, 2003 219-02871 -DMS/JMM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for SEPTEMBER 2003 Enclosed are the Monthly Operating Reports for SEPTEMBER 2003, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
Also included, is a corrected page for Unit 3 August 2003 Report.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Judy Mellody at (623) 393-6422.,
- cerely, DMS/JMM/mb
Enclosures:
AUGUST 2003 Monthly Operating cc:
(all w/enclosures)
Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute 4
Je
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-528 PVNGS-1 10/09/03 J. M. Mellody (623) 393-6422 Reporting Period:
September 2003
- 1.
Design Electrical Rating (Net MWe):
1265
- 2.
Maximum Dependable Capacity (Net MWe):
1243 3.
4.
5.
6.
Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 720.0 6,412.7 120,573.9 Hours Generator was On-Line 720.0 6,397.6 119,181.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 889,500 7,842,474 143,511,058 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.
Date Type1 Reason2 No reactor shutdowns occurred during the month of September 2003.
1F-Forced S-Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training I License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-529 PVNGS-2 10/09/03 J. M. Mellodv (623) 393-6422 Reporting Period:
September 2003
- 1.
Design Electrical Rating (Net MWe):
1265
- 2.
Maximum Dependable Capacity (Net MWe):
1243 3.
4.
5.
6.
Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 624.0 6,415.9 120,327.4 Hours Generator was On-Line
-624.0 6,402.6 118,982.2 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 779,176 8,032,580 144,976,261 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.
Date Type1 Reason2 03-02 09/27/03 S
95.98 C
1 Tripped RX to start 2R1 1 and replace steam generators.
IF-Forced S-Scheduled 2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1 -Manual 2-Manual Trip / Scram 3-Automatic Trip I Scram 4-Continuation 5-Other-(Explain)
SUMMARY
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-530 PVNGS-3 10/09103 J. M. Mellody (623) 393-6422 Reporting Period:
September 2003
- 1.
Design Electrical Rating (Net MWe):
1269
- 2.
Maximum Dependable Capacity (Net MWe):
1247 3.
4.
5.
6.
Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 720.0 5,571.6 115,755.3 Hours Generator was On-Line 720.0 5,507.5 114,703.4 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 905,771 6,757,909 140,265,068 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.
Date Type:
Reason2 No reactor shutdowns occurred during the month of September 2003.
F-Forced S-Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
I-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
NRC MONTHLY OPERATING DATA REPORT Revised DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-530 PVNGS-3 09/10/03 J. M. Mellodv (623) 393-6422 Reporting Period:
August 2003
- 1.
Design Electrical Rating (Net MWe):
1269
- 2.
Maximum Dependable Capacity (Net MWe):
1247 3.
4.
5.
6.
Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 658.8 4,851.6 115,035.3 Hours Generator was On-Line 649.0 4,787.5 113,983.4 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 788,381 5,852,138 139,359,297 UNIT SHUTDOWNS Outage Duration Hours Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No.
Date Typel Reason2 No reactor shutdowns occurred during the month of August 2003.
1 F-Forced S-Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY