October 20, 2003 Mr. John L. Skolds President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
FOLLOW-UP OF AN INSPECTION OPEN ITEM RELATED TO THE DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3, AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Skolds:
By letter dated January 3, 2003, Exelon Generation Company, LLC (EGC) submitted, for the Nuclear Regulatory Commissions (NRCs) review, an application pursuant to 10 CFR Part 54, to renew the operating license for the Dresden Nuclear Power Station (DNPS), Units 2 and 3, and Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2. As part of the NRCs review process, the NRC conducted the scoping/screening inspection during the period of July 28 -
August 1, 2003. An inspection report documenting the results of the inspection was issued on September 15, 2003.
The inspection identified an open item that requires additional information in order for the NRC staff to complete its review. Specifically, the enclosed request for additional information is related to the applicants methodology for establishing system boundaries where nonsafety-related piping was attached to the safety-related piping.
We have discussed this request with Messrs. R. Stachniak and F. Polaski of your staff on October 1, 2003. The staff is willing to meet with EGC prior to the submittal of the responses to provide clarifications of the staffs RAIs.
Sincerely,
/RA/
Tae Kim, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-237, 50-249, 50-254, and 50-265
Enclosure:
As stated cc w/enclosure: See next page
October 20, 2003 Mr. John L. Skolds President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
FOLLOW-UP OF AN INSPECTION OPEN ITEM RELATED TO THE DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3, AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Skolds:
By letter dated January 3, 2003, Exelon Generation Company, LLC (EGC) submitted, for the Nuclear Regulatory Commissions (NRCs) review, an application pursuant to 10 CFR Part 54, to renew the operating license for the Dresden Nuclear Power Station (DNPS), Units 2 and 3, and Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2. As part of the NRCs review process, the NRC conducted the scoping/screening inspection during the period of July 28 -
August 1, 2003. An inspection report documenting the results of the inspection was issued on September 15, 2003.
The inspection identified an open item that requires additional information in order for the NRC staff to complete its review. Specifically, the enclosed request for additional information is related to the applicants methodology for establishing system boundaries where nonsafety-related piping was attached to the safety-related piping.
We have discussed this request with Messrs. R. Stachniak and F. Polaski of your staff on October 1, 2003. The staff is willing to meet with EGC prior to the submittal of the responses to provide clarifications of the staffs RAIs.
Sincerely,
/RA/
Tae Kim, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-237, 50-249, 50-254, and 50-265
Enclosure:
As stated DISTRIBUTION: See next page
- See Previous Concurrence Document Name: C:\\ORPCheckout\\FileNET\\ML032940056.WPD Accession No: ML032940056 OFFICE LA:RLEP:DRIP PM:RLEP:DRIP SC:DIPM*
SC:EMEB:DE*
SC:RLEP:DRIP NAME YEdmonds TKim DThatcher KManoly SLee DATE 10/20/2003 10/20/2003 10/17/2003 10/17/2003 10/20/2003 OFFICIAL RECORD COPY
DISTRIBUTION: Follow-up of an Inspection Open Item Re: Dresden, Units 2 and 3 and quad Cities, Units 1 and 2 Renewal Application: Dated: October 20, 2003 ML032940056 HARD COPY RLEP RF T. Kim E-MAIL:
PUBLIC J. Craig D. Matthews F. Gillespie RidsNrrDe R. Barrett E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo C. Holden H. Nieh H. Walker S. Black B. Boger D. Thatcher G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
T. Kobetz C. Munson RLEP Staff L. Rossbach C. Lyon M. Ring, RIII
Dresden and Quad Cities Nuclear Power Stations cc:
Site Vice President - Quad Cities Nuclear Power Station Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Quad Cities Nuclear Power Station Plant Manager Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Regulatory Assurance Manager - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Quad Cities Resident Inspectors Office U.S. Nuclear Regulatory Commission 22712 206th Avenue N.
Cordova, IL 61242 William D. Leech Manager - Nuclear MidAmerican Energy Company P.O. Box 657 Des Moines, IA 50303 Vice President - Law and Regulatory Affairs MidAmerican Energy Company One River Center Place 106 E. Second Street P.O. Box 4350 Davenport, IA 52808 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.
Rock Island, IL 61201 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, IL 60532-4351 Document Control Desk-Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Engineering Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Chief Operating Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Counsel, Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Dresden and Quad Cities Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Robert E. Stachniak Sr. Engineer - License Renewal Prog.
Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Dresden Nuclear Power Station Plant Manager Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Dresden Resident Inspectors Office U.S. Nuclear Regulatory Commission 6500 N. Dresden Road Morris, IL 60450-9766 Chairman Grundy County Board Administration Building 1320 Union Street Morris, IL 60450 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Frederick W. Polaski Manager - License Renewal Program Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-3 Kennett Square, PA 19348
DRESDEN AND QUAD CITIES LICENSE RENEWAL APPLICATION FOLLOWUP OF INSPECTION OPEN ITEM (50-237; 50-249; 50-254; 50-265/03-04-01)
REQUEST FOR ADDITIONAL INFORMATION Open Item (50-237; 50-249; 50-254; 50-265/03-04-01)
The subject open item is described below:
The applicants methodology for establishing system boundaries where nonsafety-related piping was attached to safety-related piping was not consistent with the guidance provided by the NRC staff in the interim staff guidance letter.
Specifically, the applicant developed the concept of an equivalent anchor which included restraints at multiple locations rather than the traditional definition of an anchor as a three dimensional, six degrees of freedom restraint (pipe displacements and pipe rotations) at the same physical location. This was considered an open item pending evaluation by the Office of Nuclear Reactor Regulation technical staff.
Please clarify whether or not the subject methodology is consistent with the applicable plants current licensing basis (CLB). In your response, please identify the applicable CLB. If the methodology is not supported by the plants CLB, then provide justification and/or references to demonstrate that failure of the nonsafety-related piping that was excluded from the scope of license renewal will not adversely impact the safety-related portion of the piping system in accordance with 10 CFR 54.4(a)(2).