ML032940051

From kanterella
Jump to navigation Jump to search
Tech Spec for Point Beach, Unit 1 and 2, License Amendment, Re Allowed Outage Time for the Control Room Emergency Filtration System from 7 Days to 30 Days
ML032940051
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/16/2003
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML032940051 (1)


Text

CREFS 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Emergency Filtration System (CREFS)

LCO 3.7.9 CREFS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, 4, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. CREFS inoperable. A.1 Restore CREFS to 7 days OPERABLE status. I B. Required Action and B.1 Suspend CORE Immediately associated Completion ALTERATIONS.

Time not met.

AND B.2 Suspend movement of Immediately irradiated fuel assemblies.

AND B.3 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND B.4 Be In MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I

Point Beach 3.7.9-1 Unit I - Amendment No. 263, 210 Unit 2 - Amendment No. 208, 215