ML032881022

From kanterella
Jump to navigation Jump to search
To Technical Requirements Manual, Susquehanna, Unit 1
ML032881022
Person / Time
Site: Susquehanna  
Issue date: 10/06/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
28401
Download: ML032881022 (9)


Text

Oct. 06, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-45744

,: 5 -0.. 9, F'71-

',PC 9 I USE INFORMATION:

Name:

LACH E M Addres2 Ph TRANSMITTAL INFORMATION:

EMPL#:28401 CA#:0363 TO:

CDThL1f l

0D o 10/06/2003 LOCATIONS USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

TRM1 -

TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 09/26/2003

\\,DD MANUAL TABLE OF CONTENTS DATE: 10/03/2003 CATEGORY: DOCUMENTS TYPE: TRM1 ID:

TEXT B3.11.2.5 REMOVE:

REV:0 ADD:

REV: 1 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

Aco

TRM APPROVED AMENDMENT TO UNIT 1 TECHNICAL REQUIREMENTS MANUAL EFFECTIVE DATE:

0912612003 Replace the following pages of the Technical Requirements Manual with the enclosed pages.

The revised pages are identified by Effective Date and contain vertical lines indicating the area of change.

REMOVE0PAGES z

u--

_INSERTAT TRM / LOES-1 through TRM I LOES-6 TRM / LOES-1 through TRM LOES-6 09/26/2003 TRMI B 3.11-22 TRM / B 3.11-22 09/26/2003

) I 11 W Lii SEP 3 ° 2.

DOCUMENT CONTROL SERVICES - SS ES G:%gqodmbnHc'\\TRM WordNTRM Removelnserh 9/18/03

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFEC77VE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section TOC Tidle TABLE OF CONTENTS Effective Date 05/16/2003 1.0 USE AND APPLICATION Pages TRM /1.0-1 through TRM /1.0-3 10/04/2002 2.0 3.0 3.1 3.2 3.3 PLANT PROGRAMS Pages 2.0-1 through 2.0-2 Page TRM / 2.0-3 Page TRM /2.0-4 Pages TRM /2.0-5 through Page TRM / 2.0-7 Page I KM I2.U-0 Page TRM /2.0-9 Pages TRM /2.0-10 through TRM I 2.0-12 Page TRM / 2.0-13 APPLICABILITY Pages TRM /3.0-1 and TRM /3.0-2 Pages TRM /3.0-3 Page TRM / 3.0-4 A'

REACTIVITY CONTROL SYST MS Pages 3.1-1 through 3.1-s Pages TRM /3.1-7 andiRMl /3 18' Pages TRM /3.1-9 4nd6TRM /3.1 -9a Page TRM / 3.1-1 CORE OPERATI G LIMITS REPORT Page TRM 3.2-1 Pages TRA 3.2-2,through TRM / 3.2-35 INSTFUQMENTATION PagsTRM/3.3-1 through TRM / 3.3-3 PageRM / 3.34 Pages 3.3-5 through 3.3-8 Pages TRM /3.3-9 and TRM / 3.3-9a Pages TRM /3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 through TRM / 3.3-15 Page TRM 13.3-16 Pages TRM /3.3-17 and TRM / 3.3-18 Pages TRM /3.3-19 through TRM / 3.3-21 Page 3.3-22 Pages TRM /3.3-23 through TRM / 3.3-25 Page TRM /3.3-26 08/31/1998 08/01/2001 06/25/2002 04/02/1999 03/29/2000 09/04/2002 04/02/1999 06116/2000 04/08/1999 03/15/2002 04/08/1999 08/31/1998 06/0512002 02/1811999 02/18/1999

-07/07/1999 07/28/^2003.

07/16/1999 1 1/28/2000 08131/1998 12/17/1998 12/17/1998 03/30/2001 12/14/1998 06/27/2001 0611412002 12/14/1998 08/31/1998 05/16/2003 04/02/1999 SUSQUEHANNA - UNIT TRM / LOES-1 EFFECTIVE DATE 09/26/2003

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section 3.4 Title REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 Effective Date 10/23/1998 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 08/31/1998 04/17/2000 08/31/1998 3.6 3.7 3.8 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM / 3.6-4 Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 08/31/1998 01/07/2002 08/31/1998 12/31/2002 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-34 Page TRM / 3.7-34a Pages TRM /3.7-35 through TRM / 3.7-37 Pages 3.7-38 through 3.7-40 Pages TRM / 3.7-41 and TRM / 3.7-41 a Pages 3.7-42 and 3.7-43 Pages 3.7-44 through 3.7-48 Page TRM / 3.7-49 Pages TRM / 3.7-50-and TRM / 3.7-51 Pages TRM / 3.7-52 and TRM 13.7-53 Page TRM / 3.7-54 08/31/1998 08/02/1999 12/29/1999 08/02/1999 11/1612001 10/05/2002 02/01/1999 08/31/1998 08/11/2000 08131/1998 10/13/1998

- 03108/2003 03109/2001 04115/2003 07/29/1999 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Page 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-9 Page TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-1 la Pages 3.8-12 through 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 04/02/2002 08/31/1998 12/31/2002 04/02/2002 08/31/1998 07/19/2001 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 04/0212002 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 09/26/2003

SUSQUEHANNA STEAM ELECTRIC STATION USTOF EFFECTIVE SECTIONS(TECHNICALREQUIREMENTSMANUAL)

Section Title Effective Date Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 08/31/1998 06106/1999 08131/1998 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 08/31/1998 0310812003 06/05/2002 04107/2000 Corrected 04/17/2002 Page TRM / 3.10-8 3.11 3.12 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 through 3.11-21 Pages TRM / 3.11-22 through TRM / 3.11-24 Pages 3.11-25 through 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM I 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 09101/1998 08/31/1998 04/02/2002 09/01/1998 08/31/1998 02105/1999 4.0 A- 08/31/1998 SUSQUEHANNA - UNIT 1 TRM /LOES-3 EFFECTIVE DATE 09/2612003

SUSQUEHANNA STEAM ELECTRIC STATION UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section itle Effective Date B3.0 B3.1 B3.2 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM I B 3.1-3 Page B 3.1-4 Pages TRM I B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 03/15/2002 07/13/1999 08/31/1998 07/13/1999 02/18/1999 08/31/1998 B3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page B 3.3-15 Pages TRM / B 3.3-16 and TRM iB 3.3-17 Pages TRM / B3.3-18 through TRM / B 3.3-21 04/07/2000 08/31/1998 12/29/2000 03/21/2003 03/30/2001 08/31/1998 06/25/2002 06114/2002 06/14/2002 08/31/1998 04/07/2000 05/1612003 B3.4 B3.5 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 08/31/1998 10/15/1999 08/31/1998 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 B3.6 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Pages TRM / B 3.6-6 through TRM / B 3.6-11 07/26/2001 02/01/1999 08/31/1998 09/23/1999 01/07/2002 12/31/2002 SUSQUEHANNA - UNIT TRM / LOES-4 EFFECTIVE DATE 09/26/2003

SUSQUEHANNA STEAM ELECTRIC STATION USTOFEFFEC77VESECTIONS(TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM I B 3.7-3 through TRM / B 3.7-7 Page TRM I B 3.7-7a Pages TRM I B 3.7-8 through TRM I B 3.7-10 Page TRM I B 3.7-1Oa Pages TRM I B 3.7-11 and TRM I B 3.7-11 a Pages TRM I B 3.7-12 through TRM / B 3.7-14 Pages TRM I B 3.7-14a and TRM / B 3.7-14b Pages TRM I B 3.7-15 and TRM I B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM/B 3.7-21 through TRMtB 3.7-21a Pages TRMIB 3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM / B 3.7-32 Page TRM / B 3.7-33 Pages TRM I B 3.7-34 and TRM / B 3.7-35 08131/1998 08102/1999 08/02/1999 08102/1999 08102/1999 08102/1999 08102/1999 08102/1999 02/01/1999 08131/1998 05111/2001 04/07/2000 08/31/1998 03/09/2001 04/15/2003 07/05/2000 El3.8 B.3.9 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM I B 3.8-2 Page TRM / B 3.8-2a Page TRM I B 3.8-3 Page TRM I B 3.8-3a Page TRM I B 3.8-4 Page TRM I B 3.8-4a Page TRM I B 3.8-5 Pages TRM / B 3.8-6 through TRM B 3.8-17 REFUELING OPERATtONS BASES Pages B 3.9-1 through B 3.9-7 04/02/2002 04/02/2002 04102/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM B 3.10-4 and TRM B 3.10-5 Pages TRM / B 3.10-6 and TRM / B 3.10-7 08131/1998 03/0812003 08/23/1999 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRMIB 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 08130/1998 02/01/1999 04/07/2000 02/01/1999 11/01/1999 02/01/1999 08/30/1998 04/02/2002 SUSQUEHANNA - UNIT TRM / LOES-5 EFFECTIVE DATE 09/26/2003

SUSQUEHANNA STEAM ELECTRIC STATION USTOFEFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Tirtle Page TRM / B 3.11-20a Page TRM B 3.11-21 Page TRM I B 3.11-22 Page TRM / B 3.11-23 Page TRM I B 3.11-23a Page TRM / B 3.11-24 Page TRM / B 3.11-25 Pages B 3.11-26 through Page TRM I B 3.11-36 Effective Date 04/0212002 04/02/2002 09/2612003 04/0212002 04/02/2002 03121/2003 04/15/2003 B 3.11-35 08130/1998 02/1211999 B3.3.12 LOADS CONTROL PROGRAM BASES Pages TRM t B 3.12-1 through TRM / B 3.12-3 NFMLTTRM1 ext LOES.doc 02105/1999 SUSQUEHANNA - UNIT TRM / LOES-6 EFFECTIVE DATE 09/2612003

PPL Rev. 1 VENTILATION EXHAUST TREATMENT SYSTEM B 3.112.5 B 3.11.2.5 VENTILATION EXHAUST TREATMENT SYSTEM BASES TRO

. (continued)

The Radwaste Building filtered exhaust system, including the following filters:

OF355A and OF355B The Radwaste Tank Vent exhaust system, including the following filters:

OF358 and 0F359.

The SA Hot Shop exhaust system, including the following filters:

OF716.

The Control Structure Filter Unit exhaust systermincluding the following filters:

I OF1 34, OF1 35, OF1 37, OF1 38, OF1 40, OF1 41, OF1 43, and OF1 44.

This section of the TRM is part of the ODCM (Ref. 2) and implements the requirements of the Radiological Effluent Controls Program (Ref. 3).

ACTIONS The ACTIONS are defined to ensure proper corrective measures are taken in response to the inoperable components. Dose evaluations are performed when evolutions occur which result in an effluent path to the environment with some level of degraded treatment;- In-effect, degraded treatment renders the monthly dose projection per TRS 3.11.2.5.1 questionable. The dose-evaluation is an estimated projection under the degraded conditions.

Dose evaluations should be performed under the following conditions:

1. When bypassing a treatment system (a preliminary evaluation prior to bypassing the filter and a follow-up evaluation after the bypass);

(continued)

SUSQUEHANNA - UNIT 1 TRM B 3.11-22 EFFECTIVE DATE 09126/2003