ML032880374
| ML032880374 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/10/2003 |
| From: | Shiever A Constellation Energy Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NMP-97975, RIS-03-014 | |
| Download: ML032880374 (3) | |
Text
RO. Box 63 Lycoming, New York 13093 Constellation Energy Group Nine Mile Point Nuclear Station NMP-97975 October 10, 2003 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
NRC Regulatory Issue Summary (RIS) 2003-14, Preparation and Scheduling of Operator Licensing Examinations Gentlemen:
Nine Mile Point Nuclear Station, LLC has gathered the information requested by RIS 2003-14 and has documented the information on the attached NRC Forms 536 (5-2003). If you have any questions, please contact Mr. David J. Russell at (315) 349-4568.
Sincerely, Alan R.
ever Manage Training ARSIDJR/crr Attachments cc:
Mr. H.J. Miller, NRC Regional Administrator Region I Mr. G.K. Hunegs, NRC Senior Resident Inspector Mr. P.S. Tam, Senior Project Manager, NRR (2 copies)
()03
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0713112005 (5-203)
Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-4 E6), U.S. Nucear Regulatory OPErATR LICENSING UCommission.
Washington. DC 20555-0001, or by Internet e-mall to infoolicts~rc~ov.
nd o th Dek Officer. Office of Information and EXAMINATION DATA Rto Afairs N B131).
Office of Management nd Budget, Washington, DC 20503.
a#
- means used to Impose an nformation coletion does not display a currenly valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the inomaion collection.
FACILITY NRC REGION Nine Mile Point Unit 1 1
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2004 Cy2005 Cy2006 Cy2007 ESTIMATED NUMBER OF RO 1 RO 1 LICENSEE-PREPARED 0
0 EXAMINATIONS SRO 1 SRO 1 ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY22004 Cy 2a B
Cy 2KE CY2 7 NUMBER OF REACTOR 6
0 6
0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6
0 6
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
0 0
0 NUMBER OF SENIOR REACTOR 0
OPERATORS - LIMITED 0
0 PROPOSED DATES PRIMARY DATE 11/01/2004 01/16/2006 ALTERNATE DATE 12/01/2004 02/16/2006 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2004 CY 2007 NUMBER MARCH JUNE SEPTEMBE DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
12 0
12 0
0 CANDIDATES NRC FORM 536 (5-2003)
PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2005 s5-2003)
Estimated burden per response to comply with this voluntary Information collection request:
hour. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LI CENSINGestimate to the Records Management Branch (T-6 E6). U.S. Nuclear Regulatory OPERATOR LICENSING Commission. W~ashington, DC 20555-0001. or by Internet -mail to EXnNTcNDTets anr.gov, and to the Desk Officer Office of Information and EXAMINATION DATA ~ ~ ~~R inNEOB-10202, 3150-01311). Office of Management and Budget, Washington, DC 20503.
f a means used to Impose an Information cocton dosot isplaya currently veaid 0MB control number, the NRC may not conduct or a~sr nd a person Is not required to respond to. the information colton.
FACILTY NRC REGION Nine Mile Point Unit 2 1
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2004 CY2005 Cy2006 C Y2007 ESTIMATED NUMBER OF RO 1 0OSR LICENSEE-PREPARED RO10 RO10 EXAMINATIONS SRO1 SR1 ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER l
2004 CY2005 CY2OO6 Cy2X7 NUMBER OF REACTOR 0
0 6
OPERATORS NUMBER OF SENIOR REACTOR 3
OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
3 0
3 NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 05/02/2005 03/12/2007 ALTERNATE DATE 06/02/2005 04/12/2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2005 CY 2007 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED E
NUMBER OF 0
0 0
12 0
0 0
0 CANDIDATES I
NRC FORM 536 (5-2003)
PRINTED ON RECYCLED PAPER