ML032820342

From kanterella
Jump to navigation Jump to search

Technical Specification, Changes to Technical Specifications Associated with Core Offload Decay Time
ML032820342
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/03/2003
From:
NRC/NRR/DLPM/LPD1
To:
Shared Package
ML03282352 List:
References
TAC MB6612
Download: ML032820342 (1)


Text

e - * - - - - . . - 1@

3/4.9.3 DECAY TIME LIMITING CONDITION FOR OPERATION 3.9.3 The reactor shall be subcritical for at least 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.

I APPLICABILITY: During movement of irradiated fuel in the reactor vessel.

ACTION:

With the reactor subcritical for less than 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />, suspend all operations involving I movement of irradiated fuel in the reactor vessel.

SURVEILLANCE REQUIREMENTS 4.9.3 The reactor shall be determined to have been subcritical for at least 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> by I verification of the date and time of subcrlticality prior to movement of Irradiatesi fuel In the reactor vessel.

SEABROOK - UNIT 1 3/4 9-3 Amendment No. 95