ML032820027
| ML032820027 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 10/09/2003 |
| From: | Kuo P NRC/NRR/DRIP/RLEP |
| To: | Mecredy R Rochester Gas & Electric Corp |
| Kuo PT, NRR/DRIP/RLEP, 415-1183 | |
| Shared Package | |
| ML032820021 | List: |
| References | |
| Download: ML032820027 (4) | |
Text
October 9, 2003 Dr. Robert C. Mecredy, Vice President R.E. Ginna Nuclear Power Plant Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
LICENSE RENEWAL SAFETY EVALUATION REPORT FOR THE R.E. GINNA NUCLEAR POWER PLANT
Dear Dr. Mecredy:
By letter dated July 30, 2002, Rochester Gas and Electric Corporation (RG&E) submitted, for the Nuclear Regulatory Commissions (NRCs) review, an application pursuant to 10 CFR Part 54, to renew the operating license for the R.E. Ginna Nuclear Power Plant (Ginna) for an additional 20 years. The NRC determined that the License Renewal Application (LRA) was complete and acceptable for docketing on August 19, 2002. The NRC staff has reviewed the Ginna LRA and has developed the enclosed Safety Evaluation Report With Open Items Related to the License Renewal of the R.E. Ginna Nuclear Power Plant, herein after referred to as the Safety Evaluation Report (SER). This SER reflects the status of the staffs review of the applicants LRA, requests for additional information and clarification, and the applicants responses to the NRC staffs requests through September 16, 2003, unless otherwise noted.
Issuance of the enclosed SER is an important milestone for both the applicant and the staff.
The NRC staff has identified open and confirmatory items in its review that must be resolved before it can make a final determination on the application. These open items and confirmatory items, the majority of which were previously discussed with your staff, are summarized in Sections 1.5 and 1.6, respectively, of this SER.
In accordance with the schedule for completing the review of the Ginna LRA, the applicant is requested to review the enclosed SER, verify its accuracy, and provide comments and responses to the open and confirmatory items by December 24, 2003. The NRC staff plans to review the current content and format of the SER to further improve the SER while incorporating the applicants responses. A complete, revised SER will then be issued by March 8, 2004.
R. Mecredy The staff is committed to completing the review of the Ginna SER in a timely manner. If you have any questions regarding this matter, you can contact the project manager, Russell J. Arrighi, at 301-415-3936.
Sincerely,
/RA/
Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
As stated cc w/enclosure: See next page
R. Mecredy The staff is committed to completing the review of the Ginna SER in a timely manner. If you have any questions regarding this matter, you can contact the project manager, Russell J. Arrighi, at 301-415-3936.
Sincerely,
/RA/
Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
As stated cc w/enclosure: See next page Distribution:
- See previous concurrence See next page C:\\ORPCheckout\\FileNET\\ML032820027.wpd OFFICE PM:RLEP:DRIP LA:RLEP:DRIP D:DE D:DSSA NAME RJArrighi*
YEdmonds*
(ltr only)
RBarrett/
CGrimes* for SBlack/
MJohnson* for DATE 10/3/03 10/1/03 10/7/03 10/7/03 OFFICE D:DIPM OGC PD:RLEP:DRIP NAME BBoger/CCarpenter* for JMoore/AFernandez* for PTKuo DATE 10/6/03 10/8/03 10/9/03 OFFICIAL RECORD COPY
DISTRIBUTION: Letter to Dr. R. Mecredy, Dated: October 9, 2003 Package: ML032820021 HARD COPY RLEP RF Project Manager E-MAIL:
PUBLIC J. Craig D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski H. Nieh J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy S. Zane S. Smith (srs3)
S. Duraiswamy Y.L. (Renee) Li RLEP Staff R. Clark B. Platchek M. Modes M. Sikes
R.E. Ginna Nuclear Power Plant cc:
Kenneth Kolaczyk, Sr. Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Daniel F. Stenger Ballard Spahr Andrews & Ingersoll, LLP 601 13th Street, N.W., Suite 1000 South Washington, DC 20005 Ms. Thelma Wideman, Director Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31 Lyons, NY 14489 Ms. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness 1190 Scottsville Road, Suite 200 Rochester, NY 14624 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 George Wrobel Manager, License Renewal R.E.Ginna Nuclear Power Plant 1503 Lake Rd.
Ontario, NY 14519 Mr. David F. Wilson R.E. Ginna Nuclear Power Plant 1503 Lake Rd.
Ontario, NY 14519