September 14, 2003 MEMORANDUM TO: Davis-Besse Oversight Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel /RA/

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE OVERSIGHT PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held on August 5, 2003. Attached for your information are the minutes from the internal meeting of the Davis-Besse Oversight Panel, the Memorandum to DB 0350 Oversight Panel from G. Wright Re: Comparison of the Preliminary and Final Safety Culture Reviews Conducted by Performance Safety and Health Associates, Inc. and the Open Action Items List.

Attachments: As stated cc w/att: H. Nieh, OEDO L. Dudes, OEDO J. Dyer, RIII J. Caldwell, RIII R. Gardner, DRS B. Clayton, EICS G. Wright, DRP B. Burgess, DRP Branch 2 DB0350

MEMORANDUM TO: Davis-Besse Oversight Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE OVERSIGHT PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held on August 5, 2003. Attached for your information are the minutes from the internal meeting of the Davis-Besse Oversight Panel, the Memorandum to DB 0350 Oversight Panel from G. Wright Re: Comparison of the Preliminary and Final Safety Culture Reviews Conducted by Performance Safety and Health Associates, Inc. and the Open Action Items List.

Attachments: As stated cc w/att: H. Nieh, OEDO L. Dudes, OEDO J. Dyer, RIII J. Caldwell, RIII R. Gardner, DRS B. Clayton, EICS G. Wright, DRP B. Burgess, DRP Branch 2 DB0350 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032740030.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII RIII RIII NAME *MPhillips/klg Clipa JGrobe *DPassehl DATE 08/07/03 08/20/03 09/11/03 09/14/03

  • See previous concurrence OFFICIAL RECORD COPY

MEETING MINUTES: Internal IMC 0350 Oversight Panel Meeting Davis-Besse Nuclear Power Station DATE: August 5, 2003 TIME: 1:00 p.m. Central ATTENDEES:

J. Grobe J. Rutkowski M. Phillips D. Passehl C. Lipa W. Ruland C. Thomas J. Hopkins A. Mendiola J. Stang G. Wright D. Hills Agenda Items:

1. Discuss/Approve Todays Agenda The Panel approved the agenda, but modified the order of presentations. THE APPROVED AGENDA REFLECTS THE ORDER LISTED IN THESE MINUTES.
2. Discuss Comparison of the Preliminary and Final Safety Culture Reviews Conducted by Performance Safety and Health Associates Mr. Wright led a discussion on the comparison of the preliminary and final safety culture review reports conducted by Performance Safety and Health Associates. In preparation for this discussion, Mr. Wright sent out a memorandum to the Panel summarizing the comparison with an attachment to the memorandum providing a detailed assessment.

The assessment included specific information from the preliminary and final review reports. The Panel concluded that there was no difference in the content of the two reports although the format of the final report was more readable than the preliminary report. THE MEMO FROM MR. WRIGHT TO THE PANEL IS ATTACHED TO THESE MINUTES. THE ATTACHMENT IS CONSIDERED PROPRIETARY AND IS THEREFORE WITHHELD FROM PUBLIC DISCLOSURE (EXEMPTION 4).

3. Discuss Plant Status and Inspector Insights and Emergent Issues List Mr. Thomas led a discussion on plant status and inspector insights and emergent issues. The Panel discussed the status of the high pressure injection pumps, the electrical distribution system modifications, reactor coolant pump seal resistance temperature detector capping, high pressure injection pump recirculation piping modification, schedule of milestones, and plans for shipment of the old reactor vessel head.

Mr. Grobe mentioned that there will be a briefing of the NRC Executive Director for Operations on August 18, 2003, regarding a closed Commission briefing on the status of investigatory and enforcement matters at Davis-Besse. The closed Commission briefing is scheduled for August 25, 2003.

4. Discuss Status of Inspection Issues Mr. Grobe and Ms. Lipa led a discussion of the status of inspection issues. Ms. Lipa provided an update of the corrective action team inspection. Ms. Lipa and the corrective action team inspection leader met with licensee representatives today to discuss corrective actions and their status and priority. A revision to the previously approved corrective action team inspection plan is being drafted. The revised plan is scheduled to be discussed at the 0350 internal Panel meeting on August 12, 2003.

The Panel discussed the status of the draft Task Interface Agreement (TIA) regarding the high pressure injection pumps (ref. Action Item No. 200, "Draft a TIA letter to send to B. Ruland regarding whether the proposed modification that the licensee is performing to the high pressure injection pumps is sufficient to address the design deficiency.")

NEW ACTION ITEM 205 - J. HOPKINS TO ARRANGE A TELEPHONE CALL WITH THE LICENSEE AND EUGENE IMBRO OF NRR TO DISCUSS DETAILS OF THE HIGH PRESSURE INJECTION PUMP MODIFICATION.

The Panel discussed the status of Action Item 193, ""Consider TIA on an issue pertaining to 10 CFR 50 Appendix R Section III-L, "Alternative and Dedicated Shutdown Capability." Mr. Stang is researching the exact licensing basis to determine whether the licensee is in compliance. Region III sent a draft TIA to Headquarters on this issue.

The Panel discussed the status of the normal operating pressure (NOP) test. John Jacobson is developing a Task Interface Agreement with the Panels questions on the NOP test. Messrs. Ruland and Mendiola stated that Headquarters (Bill Batemans group) was not amenable to a TIA and requested consideration of an email with the Panels questions instead. Further discussions are ongoing.

The Panel discussed the status of the licensees 10 CFR 50.54(f) letter. Mr. Grobe asked Ms. Lipa to draft a White Paper outlining the licensees status regarding this letter.

5. Discuss/Approve Inspection Plan to Address Restart Checklist Item 3.i, "Process for Ensuring Completeness and Accuracy of Required Records and Submittals to the NRC."

Mr. Passehl discussed the licensees status on resolving Restart Checklist Item 3.i, "Process for Ensuring Completeness and Accuracy of Required Records and Submittals to the NRC." Following this discussion Mr. Passehl presented his inspection plan relative to this area. The Panel had some suggestions for the inspection plan which Mr.

Passehl will incorporate and present to the Panel at a future Panel meeting.

6. Discuss Riccio Letter The Panel discussed a July 31, 2003, letter from Jim Riccio of Greenpeace to Mr.

Grobe. Mr. Phillips added this letter to the Restart Action Matrix as Item E-37.

NEW ACTION ITEM 206 - CHRISTINE LIPA TOOK ACTION TO CALL MR.

RICCIO AND LET HIM KNOW WHEN THE PANEL WILL RESPOND TO HIS LETTER.

The Panel also discussed an August 4, 2003, email from Mr. Dave Lochbaum of the Union of Concerned Scientists regarding the basis for the initiating event frequency used in the recent preliminary Yellow finding documented in Inspection Report 50-346/03-15.

NEW ACTION ITEM 207 - SONIA BURGESS TOOK ACTION TO WRITE A LETTER IN RESPONSE TO MR. LOCHBAUMS LETTER QUESTIONING THE BASIS FOR THE INITIATING EVENT FREQUENCY USED IN THE PRELIMINARY YELLOW FINDING DOCUMENTED IN INSPECTION REPORT 50-346/03-15.

Ms. Lipa briefed the Panel on the status of emails and letters from citizens of Ohio and elsewhere regarding Davis-Besse. The specific concerns relate to citizens requests that Davis-Besse should remain shutdown. To date the NRC has received about 2000 hand-written letters and 300 emails. On July 15, V. Mityling, J. Strasma, and R.

Doornbos discussed plans to address the correspondence with the 0350 Panel. Jan Strasma has an action to respond to the emails and letters from concerned citizens in the August 2003 newsletter. J. Grobe is communicating with E. Merschoff and L.

Chandler on how the Panel should handle the correspondence in ADAMS.

7. Discuss New Allegations M. Phillips led a discussion on two new allegations that were received.
8. Discuss Any Allegations for Which an Extension Was Requested Mr. Phillips informed the Panel that there were no allegations for which an extension was requested.
9. Discuss Confirmatory Action Letter Revision Ms. Lipa led a discussion on the status of the Confirmatory Action Letter. The letter is in the process of being updated to reflect closure of the issues concerning the quarantine on the reactor vessel head and the root cause reports.
10. Discuss Action Items The Panel reviewed all the open Action Items and had the following comments:

Item 136 (Open) - NRR acceptance of NOP criteria and method John Jacobson working on a draft Task Interface Agreement.

Item 147 (Open) - Generate a list of items to consider after restart as well as transition back to the normal 0350 when terminating the 0350 Panel

Dave Passehl to bring the list back to the Panel on or about September 16, 2003.

11. Discuss New/Potential Licensing Issues Mr. Hopkins informed that Panel that there were no new licensing issues. Mr. Hopkins mentioned that the licensee is still considering submittal of a Licensing Amendment Request (LAR) to revise the Updated Safety Analysis Report (USAR) as a result of modifying auto transfer of 13.8 kV busses to prevent an alignment where both 13.8 kV busses are powered from a single startup transformer.
12. Discuss OI Findings Mr. Grobe led a discussion of the status of findings by the NRCs Office of Investigations.
13. Discuss Panel Process Plan Mr. Passehl led a brief discussion of the complete Panel Process Plan and will incorporate the Panels comments.
14. Discuss Items for Licensee Weekly Calls The Panel discussed items for the weekly calls with the licensee.
15. Discuss/Update Milestones and Commitments The Panel reviewed and discussed upcoming milestones and commitments.

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 24a Discuss making Panel Discuss by June 30, after safety information related to significance assessment complete; HQ/licensee calls 6/27 - Invite Bateman to panel mtg. To publicly available discuss what else is needed to closeout the CAL (i.e. quarantine plan); 7/2 - NRR not yet ready to discuss; 7/16 - See if procedures have changed on CAL closeout - does JD need to send letter?; 7/18 - Discussed

- is there an applicable regional procedure?; 8/6 - Discussed. Need to determine the final approach on the core removed from the head and the final approach on the head before the quarantine can be lifted; 8/22 - Revisit action item after letter sent to licensee confirming plans with old vessel head (head may be onsite longer than originally anticipated); 8/29 - Memo to be sent to Region, with a letter to go out next week; 10/01- Discussed. 1)

Conduct NRC staff survey-due 10/7 2)Memo to NRR - due 10/11 3)

Region to issue letter; 11/07-Letter required from NRR on head quarantine status; 11/19 - Letter in draft; 01/03 - A. Mendiola to look at phone conference writeups on quarantine decision making to determine if they can be released to the public; 01/07 - discussed; 01/21 -

discussed; 01/31- A. Mendiolas action; 02/11 - Completion of Licensee Phase 3 sampling plan required; 02/21

- 17.5 Rem to cut samples, Less samples may be required; 04/03 -

Completion of Phase 3 sampling plan scheduled for late April - discuss again then; 04/08 - Revisit in June 2003; 07/01 - Nozzle specimen removal begins tomorrow; 07/22 - Await verification that all samples are received at Battelle before making public;

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 73 Send feedback form on Lipa/ 8/6 - Generate feedback after panel IMC 0350 procedure to Mendiola meetings reduced to once per week; IIPB (8/6) 8/29 - Discussed - no change; 10/1 -

Discussed; 11/7 - D Passehl sent email to C Carpenter and D Coe indicating that we would be able to perform a review of the draft IMC 0350 during the first quarter of 2003; 12/3-discussed; 01/03 - 2 parts, short part-C. Lipa with P. Harris, long part- B.

Dean; 01/07 - 2nd larger response will require meeting between all parties; 01/21 - Communications with P.

Harris; 01/31-Meeting with P. Harris on Feb 4; 02/11 - Many concerns identified by the panel for inclusion; 02/21 - July 1 due date for larger input; 07/01 - Request two month extension of due date; 07/22 - Due date extended to September 1.

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 136 NRR acceptance of W. Ruland/ 01/07 - Item discussed. Meeting NOP criteria and J. Grobe summary of November 26, 2002 method (01/03) meeting has notation of NRR staff J. Grobe to send an impressions of test plan. Once email week of 05/19 drafted, issue will be surveyed to staff with question of to determine if consensus is correct; whether the licensees 01/21 - Meeting summary to discuss method and criteria are Flus System, Test agreement, and adequate to address future inspections; 1/31 - T. Chan fwd the TS for zero to J. Hopkins; 2/11 - J. Jacobson unidentified reactor questions need to be folded in (chem-coolant leakage from wipes); 2/21 - Polling of staff the reactor coolant discussed; 2/24 - Polling of staff by system. By the end of March 7; 3/25 - Staff to be polled after the week of 05/19 NRR 4/4/03 meeting in headquarters, and to formulate a proposed meeting should address whether a position for discussion. rational basis exists that the bottom The position by NRR head is not leaking, and whether a will be discussed by the critical flaw size will not appear during Panel during the 05/27 the next operating cycle; 04/08 - J.

0350-Panel meeting. Hopkins writing mtg summary for 4/4, After discussing on licensee to address additional 05/27 the issue is to be questions on 4/9 telephone call; 05/16 presented internally - Closed; 05/27 - Reopen; 06/17 -

within the NRC for Meeting held in HQ the week of June dissenting views 9. R. Barrett et. al. discussed that the (05/27 - Reopen) licensee has no basis that the nozzles are not cracked. May need a TS Amendment. The next step is to engage the licensee; 07/01 - Phone call held 6/30 with licensee. Licensee to provide written response to J.

Jacobson; 7/29 - Licensee letter received; 08/05 - RIII sending in a draft TIA for discussion.

138 Evaluate the A. 01/31 - Ongoing; 02/21 - New EDO effectiveness of the Mendiola, Comm Plan for Crisis Update, A.

Comm Plan (01/07) C. Lipa Mendiola to review for inclusion.

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 147 Generate a list of items D. Passehl 01/31 - working; to consider after restart 02/11 - Include dates and deadlines to as well as transition Manual Chapter 0350 restart back to the normal inspections planner; 07/01 -

0350 when terminating Discussed; 7/22 - Dave has list with the 0350 Panel. The Christines comments; 08/05 -

items should include Discussed. Bring back 6 weeks.

plans to augment inspection of corrective actions, inservice inspection, and safety culture monitoring.

(01/09) 178 Determine the type of C. Lipa backlog assessment that will be performed and by whom. Two attributes need to be considered: (1) the capability of the licensee to manage the backlog in an operating environment; and (2) the impact of the backlog on equipment reliability. (03/04) 186 Add Dennis Kucinich to A. Saso the standard distribution list on documents for Davis-Besse. Then remove Dennis Kucinich from distribution 90 days after the final NRC reply to his 10 CFR 2.206 Petition is signed out. (04/22)

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 189 Collect Information on J. Stang 05/27-Discussed; 07/01 - The the Regulatory Millstone Order was reviewed and the Approach to Research approach is not appropriate. Bill also the Process to Ensure look at the South Texas approach; Proper Regulatory 07/15 -Discussed, title changed; 7/22 -

Footprint upon Restart Lead changed.

(05/16) 193 Consider TIA on an J. Stang A concern was identified for the issue pertaining to 10 shutdown function performance goal CFR 50 Appendix R of maintaining reactor coolant level.

Section III-L, An NRC safety evaluation report "Alternative and issued in 1991 apparently allows the Dedicated Shutdown licensee to maintain reactor coolant Capability." (05/27) level above the top of active fuel instead of maintaining level within the range of indication in the pressurizer; 7/1 - John Hannon to determine if a TIA is necessary or the issue is moot.

Sent in draft TIA to HQa J. Stang to review licensing basis first.

195 Review worker fatigue S. Thomas 6/24 - J. Grobe took action to contact issues at the site during L. Myers and discuss; 07/22 - Scott to the current inspection update in early August.

period. (06/17) 196 Determine whether the J. Grobe 6/24 - Closed; 7/1 - Re-opened - see shift manager is meeting minutes for additional qualified to fulfill the information.

shift engineer position in an emergency and whether there is an adverse impact on the licensee's emergency procedure Implemention. (06/17)

Item re-opened at 7/1 Panel meeting.

197 Develop a A. Mendiola 6/24 - Lead changed communication plan with restart Qs and As.

(06/17)

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 200 Draft a TIA letter to C. Lipa 6/24 -The Panel assigned D. Hills with send to B. Ruland action to send an email next week with regarding whether the summary of the concept; 07/01 - On proposed modification hold pending a licensee decision on that the licensee is whether to pursue this option or performing to the high replace the pumps; 07/15 - A pressure injection teleconference was held on July 14, pumps is sufficient to 2003, with the licensee to get an address the design updated status; 07/22 - Item taken off deficiency. (06/20) hold - questions to be developed and forwarded to NRR; 08/05 - HPI Pumps draft TIA submitted.

201 Coordinate with L. T. Mendiola 6/24 - The Panel determined that Gerke and ask her to when the communication plan is call Rep. Kapturs staff developed for the preliminary regarding the June 13, significance determination for HPI 2003, letter from Pump issue that we consider Chairman Diaz to interfaces with those people who Kaptur. The purpose of receive the letter; 07/15 - Discussed.

the call would be to update Rep. Kaptur on the recent issues with the HPI Pumps and provide information on NRC actions to review LER 2003-02.(06/20) 202 Put a discussion of the J. Strasma actions the NRC took in reviewing concerns involving the reactor coolant pumps in the August 2003 newsletter.

(07/15)

DAVIS-BESSE OVERSIGHT PANEL OPEN ACTION ITEM LIST Item Action Item (Date Assigned to Comments Number generated) 203 Put a discussion of the J. Strasma actions the NRC is taking to respond to the emails and letters from concerned citizens regarding Davis-Besse in the August 2003 newsletter. This includes responding to the citizens and Amy Ryder with a letter including a copy of the most recent newsletter.

(07/15) 204 Send an email to E. J. Grobe 7/22 - E-mail sent 7/15, awaiting reply.

Merschoff and L.

Chandler inquiring how the Panel should handle the correspondence in ADAMS. (07/15) 205 Arrange a telephone J. Hopkins call with the licensee and Eugene Imbro of NRR to discuss details of the high pressure injection pump modification. (08/05) 206 Call Mr. Riccio and let C. Lipa him know when the panel will respond to his letter. (08/05) 207 Write a letter in S. Burgess response to Mr.

Lochbaums letter questioning basis for the initiating event frequency used in the preliminary yellow finding documented in inspection report 50-346/03-15. (08/05)