ML032681207

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Nuclear Management Company, LLC, and Framatome Anp, Inc., Re Potential Repairs to the Upper Vessel Head Penetrations at Point Beach Nuclear Plant
ML032681207
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/26/2003
From: Spaulding D
NRC/NRR/DLPM/LPD3
To: Raghavan L
NRC/NRR/DLPM/LPD3
References
Download: ML032681207 (5)


Text

September 26, 2003 MEMORANDUM TO: L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management FROM: Deirdre W. Spaulding, Project Manager, Section 1 /RA/

Project Directorate III Division of Licensing Project Management

SUBJECT:

FORTHCOMING MEETING WITH NUCLEAR MANAGEMENT COMPANY, LLC (NMC), AND FRAMATOME ANP, INC., REGARDING POTENTIAL REPAIRS TO THE UPPER VESSEL HEAD PENETRATIONS AT THE POINT BEACH NUCLEAR PLANT DATE & TIME: Monday, October 6, 2003 2:00 p.m. - 4:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 12B4 Rockville, Maryland PURPOSE: To discuss the technical justification for potential repairs that may overlap remnant J-groove welds on the upper reactor vessel head penetrations at Point Beach, Units 1 and 2.

CATEGORY 2:

  • This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC/NRR NMC FRAMATOME T. Chan J. Gadzala B. Behnke D. Killian T. Steingass B. Kemp D. Waskey B. Djazmati D. Spaulding J. Langdon B. Grambau Docket Nos. 50-266 and 50-301

Attachment:

Agenda (ADAMS Accession No. ML032681207) cc w/att: See next page CONTACT: D. Spaulding, NRR 301-415-2928 dws@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings," (67 FR 36920)

May 28, 2002

ML032681207) cc w/att: See next page CONTACT: D. Spaulding, NRR 301-415-2928 dws@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings," (67 FR 36920)

May 28, 2002 DISTRIBUTION: See next page OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME DSpaulding RBouling LRaghavan DATE 09/26/03 09/26/03 09/26/03 ADAMS Accession No. ML032681207 Notice of October 6, 2003, Meeting with NMC and Framatome regarding potential repairs to the upper vessel head penetrations DISTRIBUTION:

PUBLIC PDIII-1 Reading BSheron LMarsh/ELeeds WRuland LRaghavan DSpaulding KJohnson RBouling OPA TChan TSteingass OGC ACRS TMensah JStrasma, RGN-III KRiemer, RGN-III PMNS Receptionist* (OWFN and TWFN)

  • Hard copy

Point Beach Nuclear Plant, Units 1 and 2 cc:

Jonathan Rogoff, Esquire Ms. Sarah Jenkins General Counsel Electric Division Nuclear Management Company, LLC Public Service Commission of Wisconsin 700 First Street P.O. Box 7854 Hudson, WI 54016 Madison, WI 53707-7854 Mr. Richard R. Grigg Nuclear Asset Manager President and Chief Operating Officer Wisconsin Electric Power Company Wisconsin Electric Power Company 231 West Michigan Street 231 West Michigan Street Milwaukee, WI 53201 Milwaukee, WI 53201 Mano K. Nazar Manager, Regulatory Affairs Senior Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC Nuclear Management Company, LLC Prairie Island Nuclear Generating Plant 6610 Nuclear Road 1717 Wakonade Drive East Two Rivers, WI 54241 Welch, MN 55089 Mr. Ken Duveneck John Paul Cowan Town Chairman Executive Vice President & Chief Nuclear Town of Two Creeks Officer 13017 State Highway 42 Nuclear Management Company, LLC Mishicot, WI 54228 700 First Street Hudson, WI 54016 Chairman Public Service Commission Mr. Alfred J. Cayia of Wisconsin Site Vice President P.O. Box 7854 Point Beach Nuclear Plant Madison, WI 53707-7854 Nuclear Management Company, LLC 6610 Nuclear Road Regional Administrator, Region III Two Rivers, WI 54241 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspectors Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 August 2003

AGENDA FOR OCTOBER 6, 2003 MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION (NRC),

NUCLEAR MANAGEMENT COMPANY, LLC (NMC), AND FRAMATOME ANP, INC.,

TO DISCUSS THE TECHNICAL JUSTIFICATION FOR POTENTIAL REPAIRS TO THE UPPER REACTOR VESSEL HEAD PENETRATIONS WHICH MAY OVERLAP REMNANT J-GROOVE WELDS AT THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2.

TOPIC PRESENTER Opening Remarks, Introductions NRC Technical Justification For Potential Repairs NMC Discussion Between NRC, NMC, and Framatome Questions From Members of the Public Adjorn ATTACHMENT