Technical Specification. Corrected TS Page 3.6.1.3-8
ML032680861
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/15/2003
From: Macon W
NRC/NRR/DLPM/LPD3
To: Skolds J
Exelon Generation Co, Exelon Nuclear
Macon W, NRR/DLPM,415-3965
Shared Package
ML032680927 List:
References
TAC MB8464, TAC MB8465
Download: ML032680861 (1)


Text

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.6 Verify the isolation time of each MSIV is In accordance 3 seconds and 5 seconds. with the Inservice Testing Program SR 3.6.1.3.7 Verify each automatic PCIV actuates to 24 months the isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.8 Verify each reactor instrumentation line 24 months EFCV actuates to the isolation position on an actual or simulated instrument line break signal.

SR 3.6.1.3.9 Remove and test the explosive squib from 24 months on a each shear isolation valve of the TIP STAGGERED TEST System. BASIS SR 3.6.1.3.10 Verify leakage rate through any one main In accordance steam line is 100 scfh and through all with the four main steam lines is 400 scfh when Primary tested at 25.0 psig. Containment Leakage Rate Testing Program SR 3.6.1.3.11 Verify combined leakage rate through In accordance hydrostatically tested lines that with the penetrate the primary containment is Primary within limits. Containment Leakage Rate Testing Program LaSalle 1 and 2 3.6.1.3-8 Amendment No. 147/133