EDISON SOUTHERN CALIFORNIA Dr. Raymond W. Waldo Station Manager San Onofre An EDISON INTERNATIONALO Company September 19, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Response to Regulatory Issue Summary 2003-14 San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

NRC Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations," dated August 27, 2003 Gentlemen:

This letter provides the Southern California Edison (SCE) response to NRC Regulatory Issue Summary 2003-14, "Preparation and Scheduling of Operator Licensing Examinations," dated August 27, 2003.

The schedule shown on Attachment 1, Operator Licensing Examination Data," provides SCE's best estimate to meet our operator licensing needs through calendar year 2007.

If you have any questions, please feel free to contact me or Mr. Clay E. Williams at (949) 368-6707.

Sincerely, Attachment cc: T. P. Gwynn, Acting Regional Administrator, NRC Region IV C.C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3 A. T. Gody, Chief, Operations Section Region IV P.O. Box 128 San Clemente, CA 92672-0128 949-368-8725/PAX 88725 Fax 949-368-6183 waldorw~songs.sce.com "0Di

Attachment 1 RIS 2003-14 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY APPROVED BY OMB NO. 3150-0 31 EXPIRES 7-31-20D5 COMMISSION E-atin buden per m -loes onply evm Us okw" iosmilon (5-200) collecion reques I tou. T biforiaf i sed i plan bdgef and resouaes for eperm ainaons, Send conem ng burden

.estrnle t the Recant. Managarnert Branch (r-8 ES), U.S Nuclear Regulatory OPERATOR UCENSING C .s Wa DC 20555-MM, b e t EXAMINATION DATA Rmulatory Am WOs10202 PIW-oM3), Oio. of Managemrentand Budget, Washiaon, DC 2. 1a means sed so rnpose hbioon collecodoes nratsplay acurenydOMB conr umn e NRC may not conduct or pf. and person is not inpired to rsopnd is ft Ifoabn o leon-FACLITY NRC REON SAN ONOFRE NUCLEAR GENERATING STATION IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER CY 04 CY 05 CY 06 CY 07 ESTIMAT9 NUMBER OF LCENSEEPREPARED 0  % 1/22  % 0 EXAMATIONS ESTIMATED NUMBER OF 1 NRCPREPARED 0 h 'h I/2 0 B. InITIAL OPERATOR LCENSE EXAMINATIONS PROPOSED NUMBER CY 04 l_ CY 06 CY 07 NUMBER OF REACTOR OPERATORS 0 6 4 8 0 NUMBER OF SENIOR REACTOR OPERATORS - NSTAN 0 3 1 2 3 O NUMBER OF SENIOR REACTOR OPERATORS - UPRAE O O 3 3 0 NUMBER OF SEIOR REACTOR OPERATORS-LIMIED 0 0 0 0 0 PROPOSED DATES PRAIIARY DATE NA 04r2M 1&W 5 1OM6 WA ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION WE) SCHEDULE PROPOSED CY 04 CY 05 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED.

NMR OF 5 O O 4 O0 O CAN5DATES NRC Pon36(5.2003)

PX4-iw1\Q.p~iEa aa of~ o