MONTHYEARIR 05000528/20200112020-12-15015 December 2020 NRC Inspection Report 05000528/2020011, 05000529/2020011, and 05000530/2020011 ML1004908602010-02-17017 February 2010 Response to Confirmatory Order Modifying License (Effective Immediately) (Office of Investigations Report No. 4 2007-009), Condition 2 ML1004000702010-02-0909 February 2010 IR 05000528-09-005, 05000529-09-005, 05000530-09-005; on 10/01/09-12/31/09; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - NRC Integrated Inspection Report, and Notice of Violation ML0517803802005-06-27027 June 2005 EA-05-037 Arizona Public Service Company Notice of Violation (NRC Inspection Report 05000528-05-011, 05000529-05-011, and 05000530-05-011) ML0510100062005-04-0808 April 2005 EA-05-051, Arizona Public Service Company, Notice of Violation and Proposed Imposition of Civil Penalty - $50,000 (NRC Special Inspection Report 2005-014, Palo Verde Nuclear Generating Station ML0510100092005-04-0808 April 2005 EA-04-221, Arizona Public Service Company, Final Significance Determination for a Yellow Finding and Notice of Violation - NRC Special Inspection Report 2004-014 - Palo Verde Nuclear Generating Station ML0326006102003-09-17017 September 2003 EA-03-138, EA-03-139, EA-03-140 Arizona Public Service Company, NRC Investigation Report Nos. 4-2003-011, -015 & -026 2020-12-15
[Table view] Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
September 17, 2003 EA-03-138 EA-03-139 EA-03-140 Gregg R. Overbeck, Senior Vice President, Nuclear Arizona Public Service Company P.O. Box 52034 Phoenix, Arizona 85072-2034
SUBJECT:
NRC INVESTIGATION REPORT NOS. 4-2003-011, -015 & -026
Dear Mr. Overbeck:
This refers to investigation reports issued by the NRCs Office of Investigations (OI) in response to Arizona Public Service (APS) informing the NRC of possible misconduct by three employees of the Palo Verde Nuclear Generating Station. In each case, APS informed the NRC that employees had come forward and admitted that they had failed to follow procedures that required them to report arrests. Specifically, in February and March of 2003, a security officer, an auxiliary operator, and a maintenance services employee admitted to having been arrested for driving under the influence of alcohol (DUI) anywhere from 3 to 6 years earlier and had failed to report this information as required by PVNGS procedures. The NRC has reviewed the information compiled by APS and documented by OI and determined that the individuals willfully failed to make the required reports.
The actions of these individuals caused APS to be in violation of its access authorization procedures. PVNGS procedure 20DP-OSK40, PVNGS Access Screening and Badge Processing, Revision 13, Section 3.8.3, states, in part, Each individual granted unescorted access to PVNGS ... . shall promptly notify the Access Authorization Section Leader and their immediate leader/designee in the event that he/she is arrested or charged with any misdemeanor or felony.
Based on the results of these investigations, the NRC has determined that a willful violation of NRC requirements occurred, consisting of three examples. This violation is being treated as a Non-Cited Violation (NCV), consistent with Section VI.A of the Enforcement Policy. Specifically, although willfulness was involved, APS identified each of the examples of the violation and voluntarily provided this information to the NRC. In addition, the examples involved the isolated actions of the employees without management involvement, involved non-managerial personnel, and resulted in APS taking appropriate remedial and corrective action. APS initially revoked the individuals access to the facility and placed them on administrative leave. Each of the individuals appealed their access revocations, and was reauthorized access to the facility following reconsideration of the circumstances, including the fact that each had voluntarily
Arizona Public Service Company reported this information. APS documented its actions in Condition Report/Deficiency Report Nos. 2590311, 2590656, and 2593279.
If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region IV, the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001, and the NRC Resident Inspector at PVNGS.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, and any response you submit will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, any response you submit should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Please contact Gary Sanborn of my staff at 817-860-8222 should you have any questions.
Sincerely,
/RA/
Thomas P. Gwynn Acting Regional Administrator Dockets: 50-528 50-529 50-530 Licenses: NPF-41 NPF-51 NPF-74 cc:
Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, California 91770
Arizona Public Service Company Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Craig K. Seaman, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, Arizona 85072-2034 Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, Arizona 85004 Terry Bassham, Esq.
General Counsel El Paso Electric Company 123 W. Mills El Paso, Texas 79901 John W. Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, California 90051-0100 John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, New Mexico 87107-4224 Cheryl Adams Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. DIN San Clemente, California 92672
Arizona Public Service Company Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, Arizona 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326
Arizona Public Service Company Electronic distribution by RIV:
Acting Regional Administrator (TPG)
DRP Director (ATH)
Acting DRS Director (GMG)
Senior Resident Inspector (NLS)
Branch Chief, DRP/D (LJS)
Branch Chief, DRS/PSB (TWP)
HP, DRS/PSB (DRC)
Senior Project Engineer, DRP/D (JAC)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
J. Clark (JAC), OEDO RIV Coordinator J. Dixon-Herrity, OE (JLD)
OEMAIL G. Sanborn, ACES (GFS)
R4ALLEGE J. Armenta, OI (JXA)
ADAMS: U Yes
- No Initials: GFS U Publicly Available
- Sensitive U Non-Sensitive C:\ORPCheckout\FileNET\ML032600610.WPD D:ACES C:PSB D:DRS C:DRP/D D:OE SANBORN PRUETT GOOD L. SMITH CONGEL
/RA/ /GPick Actg for/ /RA/ /RAzua Actg for/ /JDixon-Herrity Actg for/
9/14/2003 9/15/2003 9/15/2003 9/16/2003 9/15/2003 DRA RA CHAMBERLAIN GWYNN
/RA/ /RA/
9/16/2003 9/17/2003 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax