ML032471567
| ML032471567 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 09/04/2003 |
| From: | Conte R NRC/RGN-I/DRS/OSB |
| To: | Christman R Entergy Nuclear Northeast |
| Conte R | |
| References | |
| 50-247/OL-03-303 | |
| Download: ML032471567 (2) | |
Text
September 4, 2003 Mr. Robert Christman, Superintendent of Operations Training Entergy Nuclear Northeast Indian Point Station, Unit 2 Training Department P.O. Box 308 295 Broadway, Suite 3 Buchanan, NY 10511
SUBJECT:
INITIAL EXAM CERTIFICATES
Dear Mr. Christman:
Enclosed are two certificates for the following operators:
Reactor Operator Senior Reactor Operator Peter A. Campbell Timothy J. Buchal No response to this letter is required.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No: 050-247 License No: DPR-26
Enclosure:
As stated cc w/o enclosure:
F. Dacimo, Site Vice President CERTIFIED MAIL -
RETURN RECEIPT REQUESTED
Mr. Robert Christman Distribution:
Facility File DOCUMENT NAME: G:OSB/Fish/IP2RETAKEAug2003/ExamCertsLtr.wpd ADAMS PKG: ML031631236 After declaring this document An Official Agency Record it will/will not be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
!"