ML032461267

From kanterella
Jump to navigation Jump to search
Rev 11 to Table of Contents to EP-PS-355, Previous Emergency Declarations at Susquehanna.
ML032461267
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/25/2003
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Security and Incident Response
References
0363
Download: ML032461267 (3)


Text

Aug. 25, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-38311 USER INFORMATION:

Name:GERLACH*ROSE M EMPL#:28401 CA#:0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 08/25/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

355 - 355 - MEDIA/PUBLIC OFFICIALS CONTACT: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 07/30/2003

"-,-'ADD MANUAL TABLE OF CONTENTS DATE: 08/22/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-355 REPLACE: REV:11 REPLACE: REV:11 REMOVE: PCAF 2003-1548 REV: N/A ADD: PCAF 2003-1548 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

Aof

- Tab 9 EP-PS-355-9 PREVIOUS EMERGENCY DECLARATIONS AT SUSQUEHANNA DATE CLASSIFICATION DESCRIPTION 09/22/82 ALERT A small electrical fire in the ESW pump house on the plant site.

The fire was out within 10 minutes. The emergency was downgraded to UNUSUAL EVENT an hour later and ended 30 minutes after that. This event occurred before the plant went commercial.

06/22183 UNUSUAL EVENT Bomb threat phoned to plant security. A thorough search turned up no explosives. The event lasted nine hours.

07/26/84 UNUSUAL EVENT Failure of diesel generators to start during a planned test on Unit 2. The unit was in start-up testing and had not begun commercial operation. A problem in the electrical system was corrected, and power restored. The event lasted 40 minutes.

03/21/86 UNUSUAL EVENT Injured and contaminated worker.

05/24/86 ALERT Erosion discovered in pumps for one of the ESW loops. A second ESW loop was operable. PPL shut down the plant to inspect all ESW pumps. The alert lasted 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> while the units were being shut down.

09/23187 UNUSUAL EVENT A main steam line plug dislodged during a Unit 1 refueling outage. The plug was suspended over the reactor core by three air hoses. Plant crews placed a net under the plug and removed it from the reactor vessel. The event lasted 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.

01/13/88 UNUSUAL EVENT Injured and contaminated worker.

04/10/89 UNUSUAL EVENT Injured and contaminated worker.

02/03/90 ALERT Loss of a shutdown cooling system on Unit 1 resulted in an increase in reactor water temperature. An alternate system was used to stabilize the water temperature until PPL could restore a circuit breaker that disabled the cooling system. The alert lasted six hours.

01/18/92 UNUSUAL EVENT A small hydrogen explosion in the basement of the plant's turbine building injured two workers, one of whom was contaminated with radioactive dust. The event lasted about an hour and a half.

8/23/01 UNUSUAL EVENT An unarmed individual scaled the outer perimeter fence and was apprehended by plant security. The individual did not enter the Protected Area. The event lasted about 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 10/03/02 UNUSUAL EVENT A fire in the Unit two start-up transformer. The fire was extinguished by an automatic fire suppression system. The event lasted about 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

EP-AD-000-480, Revision 5, Page 1 of 2

- Tab9 EP-PS-355-9 PREVIOUS EMERGENCY DECLARATIONS AT SUSQUEHANNA DATE CLASSIFICATION I DESCRIPTION 1/29/03 UNUSUAL EVENT Monitors briefly detected a higher than normal radioactive gas release from the Unit 1 turbine building vent. The event lasted about five hours.

03/24/03 UNUSUAL EVENT Injured and contaminated worker. A contract worker tipped and fell inside the Unit 2 containment structure. The event lasted about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

EP-AD-000-480, Revision 5, Page 2 of 2