August 27, 2003 Carolina Power and Light Company ATTN: Mr. John W. Moyer Vice President H. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - H. B.

ROBINSON STEAM ELECTRIC PLANT

Dear Mr. Moyer:

On August 12, 2003, the NRC staff completed its mid-cycle plant performance assessment of the H. B. Robinson Steam Electric Plant. The mid-cycle review for Robinson involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the first half of the current assessment cycle, January 1 - December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2004.

The enclosed inspection plan details the inspections scheduled through September 30, 2004.

Included in the inspection schedule is a review of your activities in response to NRC Bulletin 2002-02, "Reactor Pressure Vessel (RPV) Head and Vessel Head Penetration (VHP) Nozzle Inspection Programs." The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

CP&L 2

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 404-562-4530 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-261 Licensee No. DPR-23

Enclosure:

Robinson Inspection/Activity Plan cc w/encl: (See page 3)

CP&L 3

cc w/encl:

Chris L. Burton Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution T. P. Cleary Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution James W. Holt, Manager Performance Evaluation and Regulatory Affairs CPB 9 Electronic Mail Distribution C. T. Baucom, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution B. L. Fletcher III, Manager Support Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.

Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.

S. C. Department of Health and Environmental Control Electronic Mail Distribution Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution Steven R. Carr Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Institute of Nuclear Power Operations 700 Galleria Parkway SE Atlanta, GA 30339-5943 Distribution w/encl: (See page 4)

CP&L 4

Distribution w/encl:

C. Patel, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE DRP/RII DRP/RII SIGNATURE GTM POB NAME GMacdonald POBryan DATE 08/27/2003 08/27/2003 9/ /2003 9/ /2003 9/ /2003 9/ /2003 9/ /2003 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML032400159.wpd