ML032400103
| ML032400103 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/27/2003 |
| From: | NRC Region 4 |
| To: | |
| Shared Package | |
| ML032400085 | List: |
| References | |
| Download: ML032400103 (1) | |
Text
Brunswick Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 08/27/2003 07:06:04 Report 22 2
EB2-MR
- MAINTENANCE RULE Baseline Inspections 10/14/2003 10/17/2003 Maintenance Effectiveness IP 7111112B 1, 2 4
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 11/03/2003 11/07/2003 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 11/17/2003 11/21/2003 Identification and Resolution of Problems IP 71152B 1, 2 1
- EP INSPECTION Baseline Inspections 12/01/2003 12/05/2003 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Performance Indicator Verification IP 71151 1, 2 2
- REQUAL INSPECTION Baseline Inspections 12/01/2003 12/05/2003 Licensed Operator Requalification IP 7111111B 1, 2 3
PS-RP
- RADIATION PROTECTION Baseline Inspections 01/26/2004 01/30/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 01/26/2004 01/30/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 01/26/2004 01/30/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 01/26/2004 01/30/2004 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 01/26/2004 01/30/2004 Performance Indicator Verification IP 71151 1, 2 1
EB2-ISI
- INSERVICE INSPECTION Baseline Inspections 03/08/2004 03/12/2004 Inservice Inspection Activities - BWR IP 7111108G 1
3 EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 03/29/2004 04/02/2004 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 03/29/2004 04/02/2004 Permanent Plant Modifications IP 7111117B 1, 2 1
EB2-HS
- HEAT SINK Baseline Inspections 05/17/2004 05/21/2004 Heat Sink Performance IP 7111107B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.