IR 05000237-04-001 & 05000249-04-001- Mid-Cycle Assessment Letter
ML032400081
Person / Time
Site: Dresden  
Issue date: 08/27/2003
From: Grant G
Division Reactor Projects III
To: Skolds J
Exelon Generation Co, Exelon Nuclear
References
Download: ML032400081 (8)


See also: IR 05000237/2004001

Text

August 27, 2003

Mr. John L. Skolds, President

Exelon Nuclear

Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

Dear Mr. Skolds:

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - DRESDEN NUCLEAR POWER

STATION (REPORT 50-237/04-01; 50-249/04-01)

Dear Mr. Skolds:

On July 30, 2003, the NRC staff completed its mid-cycle plant performance assessment of the

Dresden Nuclear Power Station. The mid-cycle review involved the participation of all technical

divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection

results for the first half of the current assessment cycle, January 1, 2003 - December 31, 2003.

The purpose of this letter is to inform you of our assessment of your safety performance during

this period and our plans for future inspections at your facility so that you will have an

opportunity to prepare for these inspections and to inform us of any planned inspections that

may conflict with your plant activities.

Plant performance for the most recent quarter for Dresden Unit 3 continued to be within the

Regulatory Response Column of the NRCs Action Matrix, based on the White Unit 3 high

pressure coolant injection (HPCI) safety system unavailability PI in the mitigating system

cornerstone. This PI went White in the third quarter of 2001 due to the fault exposure hours

following the Unit 3 HPCI water hammer event on July 5, 2001. As a result of the White PI, a

supplemental inspection conducted in accordance with Inspection Procedure 95001 is

scheduled for November 2003.

Additionally, by letter dated June 23, 2003, the staff issued a Severity Level III Notice of

Violation of 10 CFR 50.9 in accordance with the enforcement policy. The violation was for

incomplete and inaccurate information provided to the NRC on September 27, 2001, that was

material to the NRC because the NRC staff was evaluating the operability determination for the

Dresden, Unit 3, HPCI system. A White finding was also issued with the same letter for

inadequate corrective actions when the HPCI water hammer was initially identified. The

supplemental inspection mentioned above for the White performance indicator will include the

White finding for inadequate corrective action and the 50.9 violation.

With respect to Unit 2, plant performance for the most recent quarter was within the Licensee

Response Column of the NRCs Action Matrix, based on all inspection findings being classified

as having very low safety significance (Green) and all PIs indicating performance at a level

requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline

inspections for Unit 2 through September 30, 2004.

J. Skolds

-2-

The enclosed inspection plan details the inspections scheduled through September 30, 2004.

The inspection plan is provided to minimize the resource impact on your staff and to allow for

scheduling conflicts and personnel availability to be resolved in advance of inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last 6 months of the inspection plan are tentative and may be revised at

the end-of-cycle review meeting.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Mark Ring at 630/829-9703 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA by Steve A. Reynolds acting for/

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure: Dresden Inspection/Activity Plan

See Attached Distribution

J. Skolds

-2-

The enclosed inspection plan details the inspections scheduled through September 30, 2004.

The inspection plan is provided to minimize the resource impact on your staff and to allow for

scheduling conflicts and personnel availability to be resolved in advance of inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last 6 months of the inspection plan are tentative and may be revised at

the end-of-cycle review meeting.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Mark Ring at 630/829-9703 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA by Steve A. Reynolds acting for/

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure: Dresden Inspection/Activity Plan

See Attached Distribution

DOCUMENT NAME: G:\\Branch TSS\\midcycle 2003\\Dre midcycle ltr 03.wpd

To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RIII

RIII

RIII

NAME

BLerch:co

MRing

GGrant

DATE

08/26/03

08/26/03

08/26/03

OFFICIAL RECORD COPY

J. Skolds

-3-

cc w/encl:

Site Vice President - Dresden Nuclear Power Station

Dresden Nuclear Power Station Plant Manager

Regulatory Assurance Manager - Dresden

Chief Operating Officer

Senior Vice President - Nuclear Services

Senior Vice President - Mid-West Regional

Operating Group

Vice President - Mid-West Operations Support

Vice President - Licensing and Regulatory Affairs

Director Licensing - Mid-West Regional

Operating Group

Manager Licensing - Dresden and Quad Cities

Senior Counsel, Nuclear, Mid-West Regional

Operating Group

Document Control Desk - Licensing

M. Aguilar, Assistant Attorney General

Illinois Department of Nuclear Safety

State Liaison Officer

Chairman, Illinois Commerce Commission

J. Mikan, Will County Executive/

Board Chairman

P. Kaupas, Will County Sheriff

W. Ferguson, Will County Emergency

Management Director

The Honorable Arthur Schultz

J. Mezera, City Manager

J. Church, Kendall County Board Chairman

R. Randall, Kendall County Sheriff

P. Nelson, Grundy County Board Chairman

J. L. Olson, Grundy County Sheriff

J. Lutz, Grundy County Emergency

Management Coordinator/Director

The Honorable Richard Kopczick

The Honorable C. Richard Ellis

The Honorable Gerald V. Pierard

The Honorable Joseph Fracaro

The Honorable Elmer Rolando

The Honorable Richard Girot

The Honorable Tony McGann

The Honorable Wayne Chesson

M. T. Gibson, Channahon Village Administrator

The Honorable Richard Chapman

K. Carroll, Shorewood Village Administrator

The Honorable Robert Blum

INPO

J. Skolds

-4-

ADAMS Distribution:

AJM

DFT

H. Nieh (HKN), OEDO

Project Director, NRR

Project Mgr., NRR

RidsNrrDipmlipb

JLC1

GEG

HBC

RML2

SRI Dresden

DRPIII

DRSIII

PLB1

JRK1

J. Skolds

-4-

ADAMS Distribution:

Dresden

Inspection / Activity Plan

09/01/2003 - 09/30/2004

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 2

08/25/2003

13:15:51

Report 22

7

LR AMR

- D/Q LR AGING MANAGEMENT INSPECTION

Other Routine

09/29/2003

10/03/2003

License Renewal Inspection

IP 71002

2, 3

1

MR

- MAINTENANCE RULE

Baseline Inspections

10/06/2003

10/10/2003

Maintenance Effectiveness

IP 7111112B

2, 3

2

ISI

- ISI FOR UNIT 2

Baseline Inspections

10/20/2003

10/24/2003

Inservice Inspection Activities - BWR

IP 7111108G

2

2

7111107A

- HEAT SINK PERFORMANCE

Baseline Inspections

10/14/2003

10/29/2003

Heat Sink Performance

IP 7111107A

2, 3

1

7112102

- OUTAGE ALARA & INSTRUMENTATION

Baseline Inspections

10/20/2003

10/24/2003

ALARA Planning and Controls

IP 7112102

2, 3

Baseline Inspections

10/20/2003

10/24/2003

Radiation Monitoring Instrumentation and Protective Equipment

IP 7112103

2, 3

Baseline Inspections

10/20/2003

10/24/2003

Performance Indicator Verification

IP 71151

2, 3

1

95001

- HPCI WATERHAMMER WHITE SUPPLEMENTAL INSP

Supplemental Progra

11/17/2003

11/28/2003

Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area

IP 95001

3

3

71152B

- PROBLEM IDENTIFICATION & RESOLUTION

Baseline Inspections

01/12/2004

01/30/2004

Identification and Resolution of Problems

IP 71152B

2, 3

1

71114

- BASELINE EP INSPECTION

Baseline Inspections

01/12/2004

01/16/2004

Alert and Notification System Testing

IP 7111402

2, 3

Baseline Inspections

01/12/2004

01/16/2004

Emergency Response Organization Augmentation Testing

IP 7111403

2, 3

Baseline Inspections

01/12/2004

01/16/2004

Correction of Emergency Preparedness Weaknesses and Deficiencies

IP 7111405

2, 3

Baseline Inspections

01/12/2004

01/16/2004

Performance Indicator Verification

IP 71151

2, 3

1

HTSNK B

- HEAT SINK BIENNIAL (DRS)

Baseline Inspections

01/26/2004

01/30/2004

Heat Sink Performance

IP 7111107B

2, 3

1

71121.03

- RADIOLOGICAL INSTRUMENTATION & EQUIP

Baseline Inspections

02/02/2004

02/06/2004

Radiation Monitoring Instrumentation and Protective Equipment

IP 7112103

2, 3

Baseline Inspections

02/02/2004

02/06/2004

Performance Indicator Verification

IP 71151

2, 3

1

71121.01

- RADIOLOGICAL ACCES CONTROL

Baseline Inspections

04/19/2004

04/23/2004

Access Control to Radiologically Significant Areas

IP 7112101

2, 3

Baseline Inspections

04/19/2004

04/23/2004

Performance Indicator Verification

IP 71151

2, 3

2

71111.11

- LIC OPERATOR REQUAL PROGRAM EVALUATION

Baseline Inspections

05/31/2004

06/04/2004

Licensed Operator Requalification

IP 7111111B

2, 3

1

71122.03

- REMP & RAD MATERIAL CONTROL

Baseline Inspections

07/19/2004

07/23/2004

Radiological Environmental Monitoring Program

IP 7112203

2, 3

Baseline Inspections

07/19/2004

07/23/2004

Performance Indicator Verification

IP 71151

2, 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Dresden

Inspection / Activity Plan

09/01/2003 - 09/30/2004

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 2 of 2

08/25/2003

13:15:51

Report 22

3

FY 2004

- DRESDEN INIT PREP 07/2004

Not Applicable

07/26/2004

07/30/2004

OL - INITIAL EXAM - DRESDEN - JUL/AUG 2004

W90109

2

3

FY 2004

- DRESDEN INIT EXAM 08/2004

Not Applicable

08/16/2004

08/20/2004

OL - INITIAL EXAM - DRESDEN - JUL/AUG 2004

W90109

2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.