|
---|
Category:Inspection Plan
MONTHYEARIR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) ML24054A7112024-02-23023 February 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000461/2024011 ML24064A1222024-02-0606 February 2024 Biennial Problem and Identification Inspection Request for Information IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22312A5362022-11-0808 November 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000461/2023401 IR 05000461/20220052022-08-22022 August 2022 Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005) IR 05000461/20210062022-03-0202 March 2022 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2021006) ML21333A0832021-11-29029 November 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Teams), Inspection Report Report 05000461/202201 IR 05000461/20210052021-09-0101 September 2021 Updated Inspection Plan for Clinton Power Station; Report 05000461/2021005 ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21076A5112021-03-17017 March 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000461/2021013 ML21071A1882021-03-12012 March 2021 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Clinton Power Station IR 05000461/20200062021-03-0404 March 2021 Annual Assessment Letter for Clinton Power Station Unit 1 (Report 05000461/2020006) ML20329A0662020-11-24024 November 2020 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection IR 05000461/20200052020-09-0101 September 2020 Updated Inspection Plan for Clinton Power Station, Unit 1 (Report 05000461/2020005) ML20183A1932020-06-30030 June 2020 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000461/2020010 IR 05000461/20190062020-03-0303 March 2020 Annual Assessment Letter for Clinton Power Station, (Report 05000461/2019006) IR 05000461/20190052019-08-28028 August 2019 Updated Inspection Plan for Clinton Power Station (Report 05000461/2019005 ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000461/20180062019-03-0404 March 2019 Annual Assessment Letter for Clinton Power Station (Report 05000461/2018006) ML19037A4772019-02-0606 February 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspect at Clinton Power Station ML19003A1912019-01-0303 January 2019 Request for Information for an NRC Triennial Baeline Design Bases Assurance Inspection; Inspection Report 05000461/2019011 IR 05000461/20180052018-08-28028 August 2018 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2018005) ML18088A5662018-03-28028 March 2018 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection 05000461/2018010 IR 05000461/20170062018-03-0202 March 2018 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2017006) ML17333A0782017-11-28028 November 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2018002 IR 05000461/20170052017-08-28028 August 2017 Updated Inspection Plan for Clinton Power Station, Unit 1 and Quarterly Assessment Letter (Report 05000461/2017005) ML17146B2492017-03-31031 March 2017 Inspection Plan for Clinton Power Station for Triennial Fire Protection Baseline Inspection Report 2017 008 ML17076A3382017-03-16016 March 2017 Notification of NRC Baseline Inspection and Request for Information 05000461/2017002 IR 05000461/20160062017-03-0101 March 2017 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016006) IR 05000461/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016005) ML16098A3242016-04-0707 April 2016 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Clinton Power Station ML16076A2542016-03-15015 March 2016 Ltr. 03/15/16 Clinton Power Station, Unit 1 - Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000461/2016009 (Jen) ML16076A2462016-03-15015 March 2016 Ltr. 03/15/16 Clinton Power Station - Notification of NRC Inspection and Request for Information (Vlm) IR 05000461/20150062016-03-0202 March 2016 Annual Assessment Letter for Clinton Power Station Unit 1 (Inspection Report 05000461/2015006) IR 05000461/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2015005) IR 05000461/20140012015-03-0404 March 2015 Annual Assessment Letter for Clinton Power Station, Unit 1, (Report 05000461/2014001) ML14245A2362014-09-0202 September 2014 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 ML14177A3812014-06-25025 June 2014 Notification of NRC Supplemental Inspection (95001) and Request for Information IR 05000451/20130012014-03-0404 March 2014 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000451/2013001) ML13308B1302013-11-0101 November 2013 Ltr 11/1/13 Clinton Fire Protection Request for Information ML13246A2152013-09-0303 September 2013 2013 Clinton Power Station Mid-Cycle Letter Combined IR 05000461/20130082013-07-25025 July 2013 IR 05000461-13-008, May 20 - 24, 2013, June 3 - 7, 2013, and June 17 - 21, 2013, Clinton Power Station, Component Design Bases Inspection (CDBI) IR 05000461/20120012013-03-0404 March 2013 Annual Assessment Letter for Clinton Power Station (Report 05000461/2012001) ML13038A3122013-02-0707 February 2013 Request for Information for an NRC Triennial Baseline Component Design Bases Inspection Report 05000461-13-008 ML12249A4462012-09-0404 September 2012 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 2024-08-07
[Table view] Category:Letter
MONTHYEARML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24089A2222024-04-11011 April 2024 LRA - Acceptance and Opportunity for Hearing - Letter ML24092A3452024-04-0101 April 2024 Updated Safety Analysis Report (Usar), Revision 23 ML24092A3552024-04-0101 April 2024 Request for Information for NRC License Renewal Inspection: Inspection Report 05000461/2024010 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24045A1422024-02-29029 February 2024 License Renewal Application Receipt and Availability - Letter IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) 2024-09-09
[Table view] |
See also: IR 05000461/2004001
Text
August 27, 2003
Mr. John L. Skolds, President
and Chief Nuclear Officer
Exelon Nuclear
Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
CLINTON POWER STATION (REPORT 50-461/04-01)
Dear Mr. Skolds:
On July 30, 2003, the NRC staff completed its mid-cycle plant performance assessment of the
Clinton Power Station. The mid-cycle review for the Clinton Power Station involved the
participation of all technical divisions in evaluating performance indicators (PIs) for the most
recent quarter and inspection results for the first half of the current assessment cycle,
January 1 - December 31, 2003. The purpose of this letter is to inform you of our assessment
of your safety performance during this period and our plans for future inspections at your facility
so that you will have an opportunity to prepare for these inspections and to inform us of any
planned inspections that may conflict with your plant activities.
Plant performance for the most recent quarter was within the Licensee Response Column of
the NRCs Action Matrix, based on all inspection findings being classified as having very low
safety significance (Green) and all PIs indicating performance at a level requiring no additional
NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility
through September 30, 2004.
During this last quarter, the staff issued a severity level III Notice of Violation with no civil
penalty in accordance with the enforcement policy. On May 6, 2003, a Notice was issued for
the failure to provide complete and accurate information regarding two individuals medical
certification. The individuals did not meet minimum standards and required an amendment to
their individual licenses to include restrictions for no solo operation.
The enclosed inspection plan details the inspections scheduled through September 30, 2004.
The inspection plan is provided to minimize the resource impact on your staff and to allow for
scheduling conflicts and personnel availability to be resolved in advance of inspector arrival
onsite. Four infrequently performed inspections will be conducted this year. These include
(1) Biennial Emergency Preparedness Inspection, (2) Safeguards Interim Compensatory
Measures Inspections, (3) Safety System Design Inspection, and (4) Problem Identification and
Resolution Inspection. Routine resident inspections are not listed due to their ongoing and
continuous nature. The inspections in the last 6 months of the inspection plan are tentative and
may be revised at the end-of-cycle review meeting.
J. Skolds -2-
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at (630) 829-9729 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Ann Marie Stone, Chief
Branch 3
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
Enclosure: Clinton Power Station Inspection/Activity Plan
See Attached Distribution
J. Skolds -2-
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at (630) 829-9729 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Ann Marie Stone, Chief
Branch 3
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
Enclosure: Clinton Power Station Inspection/Activity Plan
See Attached Distribution
DOCUMENT NAME: G:\Branch TSS\midcycle2003\Cli midcycle ltr 03.wpd
To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
OFFICE RIII RIII
NAME TTongue:co AMSTone
DATE 08/25/03 08/25/03
OFFICIAL RECORD COPY
J. Skolds -3-
cc w/encl: Site Vice President - Clinton Power Station
Senior Vice President - Mid-West Regional Operating Group
Senior Vice President - Nuclear Services
Vice President -Mid-West Operations Support
Clinton Power Station Plant Manager
Director Licensing - Midwest Regional Operating Group
Vice President - Licensing And Regulatory Affairs
Senior Counsel, Nuclear, Mid-West Regional Operating Group
Regulatory Assurance Manager - Clinton
Chief Operating Officer
Manager Licensing - Clinton and LaSalle
Document Control Desk-Licensing
Illinois Department of Nuclear Safety
M. Reidy, Clinton Police Chief
The Honorable Roger Cyrulik
The Honorable Steve Followell
D. Harris, DeWitt County
Board Chairman
R. Massey, DeWitt County Sheriff
F. Zacher, DeWitt County Emergency
Preparedness Coordinator
The Honorable Thomas Brame
M. Sweeney, McLean County Board Chairman
D. Owens, McLean County Sheriff
J. Wahls, Director, McLean County
Emergency Services and Disaster Agency
R. Scheffer, Piatt County Board Chairman
R. Manint, Piatt County Sheriff
C. Morris, Emergency Services
Disaster Coordinator
R. Owen, Macon County Board Chairman
R. Walker, Macon County Sheriff
P. Anello, Emergency Services Coordinator
INPO
J. Skolds -4-
ADAMS Distribution:
DFT
H. Nieh (HKN), OEDO
Project Director, NRR
Project Mgr., NRR
RidsNrrDipmlipb
JLC1
GEG
HBC
RML2
SRI Clinton
DRSIII
DRPIII
PLB1
JRK1
Page 1 of 2 Clinton
08/25/2003 13:14:26 Inspection / Activity Plan
Report 22
09/01/2003 - 09/30/2004
Unit No. of Staff Planned Dates Inspection
Number Inspection Activity Title on Site Start End Type
TI 148 - TI2515/148 SECURITY ICMS 4
1 IP 2515/148 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures 09/15/2003 09/26/2003 Safety Issues
SG BASE - SG BASELINE CY 2003 1
1 IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorizat 09/26/2003 09/26/2003 Baseline Inspections
1 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Stra 09/26/2003 09/26/2003 Baseline Inspections
1 IP 71151 Performance Indicator Verification 09/26/2003 09/26/2003 Baseline Inspections
71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2
1 IP 7111111B Licensed Operator Requalification 09/29/2003 10/03/2003 Baseline Inspections
SSDI - SAFETY SYSTEM DESIGN 6
1 IP 7111121 Safety System Design and Performance Capability 10/20/2003 11/07/2003 Baseline Inspections
INSP - ACCESS CONTROL & ALARA 2
1 IP 7112101 Access Control to Radiologically Significant Areas 11/17/2003 11/21/2003 Baseline Inspections
1 IP 71151 Performance Indicator Verification 11/17/2003 11/21/2003 Baseline Inspections
FY 2004 - CLINTON INIT PREP 12/2003 2
1 W90073 OL - INITIAL EXAM - CLINTON - DEC 2003/JAN 2004 12/01/2003 12/05/2003 Not Applicable
FY 2004 - CLINTON INIT EXAM 01/2004 3
1 W90073 OL - INITIAL EXAM - CLINTON - DEC 2003/JAN 2004 01/05/2004 01/16/2004 Not Applicable
7111108 - ISI 1
1 IP 7111108G Inservice Inspection Activities - BWR 02/09/2004 02/13/2004 Baseline Inspections
IP 71121 - RP OUTAGE ALARA & ACCESS CNTRL INSP 1
1 IP 7112101 Access Control to Radiologically Significant Areas 02/09/2004 02/13/2004 Baseline Inspections
1 IP 7112102 ALARA Planning and Controls 02/09/2004 02/13/2004 Baseline Inspections
PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 3
1 IP 71152B Identification and Resolution of Problems 03/15/2004 04/02/2004 Baseline Inspections
IP 71122 - RP RAM PROCESSING AND TRANSPORTATION 1
1 IP 7112202 Radioactive Material Processing and Transportation 03/22/2004 03/26/2004 Baseline Inspections
1 IP 71151 Performance Indicator Verification 03/22/2004 03/26/2004 Baseline Inspections
71114 - BASELINE NON-EXERCISE EP INSP 1
1 IP 7111402 Alert and Notification System Testing 04/19/2004 04/23/2004 Baseline Inspections
1 IP 7111403 Emergency Response Organization Augmentation Testing 04/19/2004 04/23/2004 Baseline Inspections
1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/19/2004 04/23/2004 Baseline Inspections
1 IP 71151 Performance Indicator Verification 04/19/2004 04/23/2004 Baseline Inspections
IP 71121 - RP POST-OUTAGE ALARA & ACCESS CNTRL INSP 1
1 IP 7112101 Access Control to Radiologically Significant Areas 06/07/2004 06/11/2004 Baseline Inspections
1 IP 7112102 ALARA Planning and Controls 06/07/2004 06/11/2004 Baseline Inspections
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Clinton
08/25/2003 13:14:26 Inspection / Activity Plan
Report 22
09/01/2003 - 09/30/2004
Unit No. of Staff Planned Dates Inspection
Number Inspection Activity Title on Site Start End Type
IP 71121 - RP POST-OUTAGE ALARA & ACCESS CNTRL INSP 1
1 IP 71151 Performance Indicator Verification 06/07/2004 06/11/2004 Baseline Inspections
MR - MAINTENANCE RULE 1
1 IP 7111112B Maintenance Effectiveness 06/21/2004 06/25/2004 Baseline Inspections
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.