August 27, 2003
Mr. John L. Skolds, President
and Chief Nuclear Officer
Exelon Nuclear
Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
CLINTON POWER STATION (REPORT 50-461/04-01)
Dear Mr. Skolds:
On July 30, 2003, the NRC staff completed its mid-cycle plant performance assessment of the
Clinton Power Station. The mid-cycle review for the Clinton Power Station involved the
participation of all technical divisions in evaluating performance indicators (PIs) for the most
recent quarter and inspection results for the first half of the current assessment cycle,
January 1 - December 31, 2003. The purpose of this letter is to inform you of our assessment
of your safety performance during this period and our plans for future inspections at your facility
so that you will have an opportunity to prepare for these inspections and to inform us of any
planned inspections that may conflict with your plant activities.
Plant performance for the most recent quarter was within the Licensee Response Column of
the NRCs Action Matrix, based on all inspection findings being classified as having very low
safety significance (Green) and all PIs indicating performance at a level requiring no additional
NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility
through September 30, 2004.
During this last quarter, the staff issued a severity level III Notice of Violation with no civil
penalty in accordance with the enforcement policy. On May 6, 2003, a Notice was issued for
the failure to provide complete and accurate information regarding two individuals medical
certification. The individuals did not meet minimum standards and required an amendment to
their individual licenses to include restrictions for no solo operation.
The enclosed inspection plan details the inspections scheduled through September 30, 2004.
The inspection plan is provided to minimize the resource impact on your staff and to allow for
scheduling conflicts and personnel availability to be resolved in advance of inspector arrival
onsite. Four infrequently performed inspections will be conducted this year. These include
(1) Biennial Emergency Preparedness Inspection, (2) Safeguards Interim Compensatory
Measures Inspections, (3) Safety System Design Inspection, and (4) Problem Identification and
Resolution Inspection. Routine resident inspections are not listed due to their ongoing and
continuous nature. The inspections in the last 6 months of the inspection plan are tentative and
may be revised at the end-of-cycle review meeting.
J. Skolds
-2-
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at (630) 829-9729 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Ann Marie Stone, Chief
Branch 3
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
Enclosure: Clinton Power Station Inspection/Activity Plan
See Attached Distribution
J. Skolds
-2-
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at (630) 829-9729 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Ann Marie Stone, Chief
Branch 3
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
Enclosure: Clinton Power Station Inspection/Activity Plan
See Attached Distribution
DOCUMENT NAME: G:\\Branch TSS\\midcycle2003\\Cli midcycle ltr 03.wpd
To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
OFFICE
RIII
RIII
NAME
TTongue:co
AMSTone
DATE
08/25/03
08/25/03
OFFICIAL RECORD COPY
J. Skolds
-3-
cc w/encl:
Site Vice President - Clinton Power Station
Senior Vice President - Mid-West Regional Operating Group
Senior Vice President - Nuclear Services
Vice President -Mid-West Operations Support
Clinton Power Station Plant Manager
Director Licensing - Midwest Regional Operating Group
Vice President - Licensing And Regulatory Affairs
Senior Counsel, Nuclear, Mid-West Regional Operating Group
Regulatory Assurance Manager - Clinton
Chief Operating Officer
Manager Licensing - Clinton and LaSalle
Document Control Desk-Licensing
Illinois Department of Nuclear Safety
M. Reidy, Clinton Police Chief
The Honorable Roger Cyrulik
The Honorable Steve Followell
D. Harris, DeWitt County
Board Chairman
R. Massey, DeWitt County Sheriff
F. Zacher, DeWitt County Emergency
Preparedness Coordinator
The Honorable Thomas Brame
M. Sweeney, McLean County Board Chairman
D. Owens, McLean County Sheriff
J. Wahls, Director, McLean County
Emergency Services and Disaster Agency
R. Scheffer, Piatt County Board Chairman
R. Manint, Piatt County Sheriff
C. Morris, Emergency Services
Disaster Coordinator
R. Owen, Macon County Board Chairman
R. Walker, Macon County Sheriff
P. Anello, Emergency Services Coordinator
J. Skolds
-4-
ADAMS Distribution:
H. Nieh (HKN), OEDO
Project Director, NRR
Project Mgr., NRR
RidsNrrDipmlipb
JLC1
GEG
RML2
SRI Clinton
DRSIII
DRPIII
PLB1
JRK1
Clinton
Inspection / Activity Plan
09/01/2003 - 09/30/2004
Inspection
Type
Inspection Activity
Planned Dates
Start End
No. of Staff
on Site
Title
Unit
Number
Page 1 of 2
08/25/2003
13:14:26
Report 22
4
TI 148
- TI2515/148 SECURITY ICMS
Safety Issues
09/15/2003
09/26/2003
Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures
1
1
SG BASE
Baseline Inspections
09/26/2003
09/26/2003
Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorizat
1
Baseline Inspections
09/26/2003
09/26/2003
Response to Contingency Events (Protective Strategy and Implementation of Protective Stra
1
Baseline Inspections
09/26/2003
09/26/2003
Performance Indicator Verification
1
2
- LIC OPERATOR REQUAL PROGRAM EVALUATION
Baseline Inspections
09/29/2003
10/03/2003
Licensed Operator Requalification
IP 7111111B
1
6
SSDI
- SAFETY SYSTEM DESIGN
Baseline Inspections
10/20/2003
11/07/2003
Safety System Design and Performance Capability
1
2
INSP
- ACCESS CONTROL & ALARA
Baseline Inspections
11/17/2003
11/21/2003
Access Control to Radiologically Significant Areas
1
Baseline Inspections
11/17/2003
11/21/2003
Performance Indicator Verification
1
2
FY 2004
- CLINTON INIT PREP 12/2003
Not Applicable
12/01/2003
12/05/2003
OL - INITIAL EXAM - CLINTON - DEC 2003/JAN 2004
W90073
1
3
FY 2004
- CLINTON INIT EXAM 01/2004
Not Applicable
01/05/2004
01/16/2004
OL - INITIAL EXAM - CLINTON - DEC 2003/JAN 2004
W90073
1
1
7111108
- ISI
Baseline Inspections
02/09/2004
02/13/2004
Inservice Inspection Activities - BWR
IP 7111108G
1
1
- RP OUTAGE ALARA & ACCESS CNTRL INSP
Baseline Inspections
02/09/2004
02/13/2004
Access Control to Radiologically Significant Areas
1
Baseline Inspections
02/09/2004
02/13/2004
ALARA Planning and Controls
1
3
- PROBLEM IDENTIFICATION AND RESOLUTION
Baseline Inspections
03/15/2004
04/02/2004
Identification and Resolution of Problems
IP 71152B
1
1
- RP RAM PROCESSING AND TRANSPORTATION
Baseline Inspections
03/22/2004
03/26/2004
Radioactive Material Processing and Transportation
1
Baseline Inspections
03/22/2004
03/26/2004
Performance Indicator Verification
1
1
71114
- BASELINE NON-EXERCISE EP INSP
Baseline Inspections
04/19/2004
04/23/2004
Alert and Notification System Testing
1
Baseline Inspections
04/19/2004
04/23/2004
Emergency Response Organization Augmentation Testing
1
Baseline Inspections
04/19/2004
04/23/2004
Correction of Emergency Preparedness Weaknesses and Deficiencies
1
Baseline Inspections
04/19/2004
04/23/2004
Performance Indicator Verification
1
1
- RP POST-OUTAGE ALARA & ACCESS CNTRL INSP
Baseline Inspections
06/07/2004
06/11/2004
Access Control to Radiologically Significant Areas
1
Baseline Inspections
06/07/2004
06/11/2004
ALARA Planning and Controls
1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Clinton
Inspection / Activity Plan
09/01/2003 - 09/30/2004
Inspection
Type
Inspection Activity
Planned Dates
Start End
No. of Staff
on Site
Title
Unit
Number
Page 2 of 2
08/25/2003
13:14:26
Report 22
1
- RP POST-OUTAGE ALARA & ACCESS CNTRL INSP
Baseline Inspections
06/07/2004
06/11/2004
Performance Indicator Verification
1
1
- MAINTENANCE RULE
Baseline Inspections
06/21/2004
06/25/2004
Maintenance Effectiveness
IP 7111112B
1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.