461/04-01; Mid-cycle Plant Performance Review and Inspection Plan
ML032400058
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/27/2003
From: Ann Marie Stone
NRC/RGN-III/DRP/RPB3
To: Skolds J
Exelon Generation Co, Exelon Nuclear
References
IR-04-001
Download: ML032400058 (7)


See also: IR 05000461/2004001

Text

August 27, 2003

Mr. John L. Skolds, President

and Chief Nuclear Officer

Exelon Nuclear

Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

CLINTON POWER STATION (REPORT 50-461/04-01)

Dear Mr. Skolds:

On July 30, 2003, the NRC staff completed its mid-cycle plant performance assessment of the

Clinton Power Station. The mid-cycle review for the Clinton Power Station involved the

participation of all technical divisions in evaluating performance indicators (PIs) for the most

recent quarter and inspection results for the first half of the current assessment cycle,

January 1 - December 31, 2003. The purpose of this letter is to inform you of our assessment

of your safety performance during this period and our plans for future inspections at your facility

so that you will have an opportunity to prepare for these inspections and to inform us of any

planned inspections that may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of

the NRCs Action Matrix, based on all inspection findings being classified as having very low

safety significance (Green) and all PIs indicating performance at a level requiring no additional

NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility

through September 30, 2004.

During this last quarter, the staff issued a severity level III Notice of Violation with no civil

penalty in accordance with the enforcement policy. On May 6, 2003, a Notice was issued for

the failure to provide complete and accurate information regarding two individuals medical

certification. The individuals did not meet minimum standards and required an amendment to

their individual licenses to include restrictions for no solo operation.

The enclosed inspection plan details the inspections scheduled through September 30, 2004.

The inspection plan is provided to minimize the resource impact on your staff and to allow for

scheduling conflicts and personnel availability to be resolved in advance of inspector arrival

onsite. Four infrequently performed inspections will be conducted this year. These include

(1) Biennial Emergency Preparedness Inspection, (2) Safeguards Interim Compensatory

Measures Inspections, (3) Safety System Design Inspection, and (4) Problem Identification and

Resolution Inspection. Routine resident inspections are not listed due to their ongoing and

continuous nature. The inspections in the last 6 months of the inspection plan are tentative and

may be revised at the end-of-cycle review meeting.

J. Skolds

-2-

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at (630) 829-9729 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Ann Marie Stone, Chief

Branch 3

Division of Reactor Projects

Docket No. 50-461

License No. NPF-62

Enclosure: Clinton Power Station Inspection/Activity Plan

See Attached Distribution

J. Skolds

-2-

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at (630) 829-9729 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Ann Marie Stone, Chief

Branch 3

Division of Reactor Projects

Docket No. 50-461

License No. NPF-62

Enclosure: Clinton Power Station Inspection/Activity Plan

See Attached Distribution

DOCUMENT NAME: G:\\Branch TSS\\midcycle2003\\Cli midcycle ltr 03.wpd

To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RIII

RIII

NAME

TTongue:co

AMSTone

DATE

08/25/03

08/25/03

OFFICIAL RECORD COPY

J. Skolds

-3-

cc w/encl:

Site Vice President - Clinton Power Station

Senior Vice President - Mid-West Regional Operating Group

Senior Vice President - Nuclear Services

Vice President -Mid-West Operations Support

Clinton Power Station Plant Manager

Director Licensing - Midwest Regional Operating Group

Vice President - Licensing And Regulatory Affairs

Senior Counsel, Nuclear, Mid-West Regional Operating Group

Regulatory Assurance Manager - Clinton

Chief Operating Officer

Manager Licensing - Clinton and LaSalle

Document Control Desk-Licensing

Illinois Department of Nuclear Safety

M. Reidy, Clinton Police Chief

The Honorable Roger Cyrulik

The Honorable Steve Followell

D. Harris, DeWitt County

Board Chairman

R. Massey, DeWitt County Sheriff

F. Zacher, DeWitt County Emergency

Preparedness Coordinator

The Honorable Thomas Brame

M. Sweeney, McLean County Board Chairman

D. Owens, McLean County Sheriff

J. Wahls, Director, McLean County

Emergency Services and Disaster Agency

R. Scheffer, Piatt County Board Chairman

R. Manint, Piatt County Sheriff

C. Morris, Emergency Services

Disaster Coordinator

R. Owen, Macon County Board Chairman

R. Walker, Macon County Sheriff

P. Anello, Emergency Services Coordinator

INPO

J. Skolds

-4-

ADAMS Distribution:

DFT

H. Nieh (HKN), OEDO

Project Director, NRR

Project Mgr., NRR

RidsNrrDipmlipb

JLC1

GEG

HBC

RML2

SRI Clinton

DRSIII

DRPIII

PLB1

JRK1

Clinton

Inspection / Activity Plan

09/01/2003 - 09/30/2004

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 2

08/25/2003

13:14:26

Report 22

4

TI 148

- TI2515/148 SECURITY ICMS

Safety Issues

09/15/2003

09/26/2003

Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures

IP 2515/148

1

1

SG BASE

- SG BASELINE CY 2003

Baseline Inspections

09/26/2003

09/26/2003

Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorizat

IP 7113002

1

Baseline Inspections

09/26/2003

09/26/2003

Response to Contingency Events (Protective Strategy and Implementation of Protective Stra

IP 7113003

1

Baseline Inspections

09/26/2003

09/26/2003

Performance Indicator Verification

IP 71151

1

2

71111.11

- LIC OPERATOR REQUAL PROGRAM EVALUATION

Baseline Inspections

09/29/2003

10/03/2003

Licensed Operator Requalification

IP 7111111B

1

6

SSDI

- SAFETY SYSTEM DESIGN

Baseline Inspections

10/20/2003

11/07/2003

Safety System Design and Performance Capability

IP 7111121

1

2

INSP

- ACCESS CONTROL & ALARA

Baseline Inspections

11/17/2003

11/21/2003

Access Control to Radiologically Significant Areas

IP 7112101

1

Baseline Inspections

11/17/2003

11/21/2003

Performance Indicator Verification

IP 71151

1

2

FY 2004

- CLINTON INIT PREP 12/2003

Not Applicable

12/01/2003

12/05/2003

OL - INITIAL EXAM - CLINTON - DEC 2003/JAN 2004

W90073

1

3

FY 2004

- CLINTON INIT EXAM 01/2004

Not Applicable

01/05/2004

01/16/2004

OL - INITIAL EXAM - CLINTON - DEC 2003/JAN 2004

W90073

1

1

7111108

- ISI

Baseline Inspections

02/09/2004

02/13/2004

Inservice Inspection Activities - BWR

IP 7111108G

1

1

IP 71121

- RP OUTAGE ALARA & ACCESS CNTRL INSP

Baseline Inspections

02/09/2004

02/13/2004

Access Control to Radiologically Significant Areas

IP 7112101

1

Baseline Inspections

02/09/2004

02/13/2004

ALARA Planning and Controls

IP 7112102

1

3

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

Baseline Inspections

03/15/2004

04/02/2004

Identification and Resolution of Problems

IP 71152B

1

1

IP 71122

- RP RAM PROCESSING AND TRANSPORTATION

Baseline Inspections

03/22/2004

03/26/2004

Radioactive Material Processing and Transportation

IP 7112202

1

Baseline Inspections

03/22/2004

03/26/2004

Performance Indicator Verification

IP 71151

1

1

71114

- BASELINE NON-EXERCISE EP INSP

Baseline Inspections

04/19/2004

04/23/2004

Alert and Notification System Testing

IP 7111402

1

Baseline Inspections

04/19/2004

04/23/2004

Emergency Response Organization Augmentation Testing

IP 7111403

1

Baseline Inspections

04/19/2004

04/23/2004

Correction of Emergency Preparedness Weaknesses and Deficiencies

IP 7111405

1

Baseline Inspections

04/19/2004

04/23/2004

Performance Indicator Verification

IP 71151

1

1

IP 71121

- RP POST-OUTAGE ALARA & ACCESS CNTRL INSP

Baseline Inspections

06/07/2004

06/11/2004

Access Control to Radiologically Significant Areas

IP 7112101

1

Baseline Inspections

06/07/2004

06/11/2004

ALARA Planning and Controls

IP 7112102

1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Clinton

Inspection / Activity Plan

09/01/2003 - 09/30/2004

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 2 of 2

08/25/2003

13:14:26

Report 22

1

IP 71121

- RP POST-OUTAGE ALARA & ACCESS CNTRL INSP

Baseline Inspections

06/07/2004

06/11/2004

Performance Indicator Verification

IP 71151

1

1

MR

- MAINTENANCE RULE

Baseline Inspections

06/21/2004

06/25/2004

Maintenance Effectiveness

IP 7111112B

1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.