Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant
ML032390153
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/27/2003
From: Blough A
Division Reactor Projects I
To: Vanderheyden G
Constellation Generation Group
References
Download: ML032390153 (5)


Text

August 27, 2003 Mr. George Vanderheyden Vice President - Calvert Cliffs Nuclear Power Plant Constellation Generation Group Calvert Cliffs Nuclear Power Plant, Inc.

1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

CALVERT CLIFFS NUCLEAR POWER PLANT

Dear Mr. Vanderheyden:

On July 29, 2003, the NRC staff completed its mid-cycle plant performance review of Calvert Cliffs Nuclear Power Plant. The mid-cycle review for Calvert Cliffs Nuclear Power Plant involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2003 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

Plant performance for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix, based on one finding of low to moderate safety significance (White) common to both units in the Emergency Preparedness Cornerstone. The finding involved the offsite alert and notification siren system which was incapable of being actuated in a timely manner. The NRC conducted a 95001 supplemental inspection in January 2003 and determined that your actions to resolve this issue were appropriate.

The enclosed inspection plan details the inspections scheduled through September 30, 2004.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival on site. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting. The NRC plans to Pilot a new Inspection Procedure (71111.DS, Safety System Design and Performance Capability) during the weeks of January 12 and 26, 2004.

This procedure combines the inspection activities previously performed by 71111.21 (Safety System Design and Performance Capability), 71111.17B (Permanent Plant Modifications), and 71111.02 (Evaluation of Changes, Tests, or Experiments).

Mr. George Vanderheyden 2 In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact James M. Trapp, Chief, Reactor Projects Branch 1, at 610-337-5186 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

A. Randolph Blough, Director Division of Reactor Projects Docket Nos. 50-317 50-318 License Nos. DPR-53 DPR-69

Enclosure:

Calvert Cliffs Inspection/Activity Plan cc w/encl: President, Calvert County Board of Commissioners J. M. Petro, Esquire, Constellation Energy Group, Inc.

J. E. Silberg, Esquire, Shaw, Pittman, Potts and Trowbridge M. Geckle, Manager of Operations (CCNPP)

R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel P. T. Birnie, Esquire, Maryland Safe Energy Coalition L. F. Donatell, NRC Technical Training Center P. Furio, Acting Director, Nuclear Regulatory Matters (CCNPP)

Institute of Nuclear Power Operations (INPO)

State of Maryland (2)

Mr. George Vanderheyden 3 Distribution w/encl: H. Miller, RA/J. Wiggins, DRA (1)

A. Blough, DRP W. Lanning, DRS B. Holian, DRP K. McConnell, DRP R. Crlenjak, DRS M. Giles - SRI - Calvert Cliffs J. OHara, DRP R. Laufer, NRR G. Vissing, PM, NRR R. Clark/P. Tam, PM, NRR (Backup)

D. Screnci, PAO N. Sheehan, PAO J. Trapp, DRP DRS Branch Chiefs (5)

M. Modes, DRS R. Nimitz, DRS P. Frechette, DRS N. McNamara, DRS RidsNrrDipmlipb Region I Docket Room (with concurrences)

DOCUMENT NAME: G:\BRANCH1\2003 ROP4 mid-c letters\Calvert Cliffs Mid-cycle Letter 2003.wpd After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME JOHara/JT for JTrapp/JT ABlough/AB DATE 08/13/03 08/13/03 08/26/03 08/ /03 08/ /03 OFFICIAL RECORD COPY

Page 1 of 2 Calvert Cliffs 08/26/2003 13:19:46 Inspection / Activity Plan Report 22 06/29/2003 - 10/02/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71151 - EP PI VERIFICATION 1 1, 2 IP 71151 Performance Indicator Verification 07/07/2003 07/11/2003 Baseline Inspections TI148BC - SEC ICM 5 1, 2 IP 2515/148 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures 07/07/2003 07/11/2003 Safety Issues 71122.02 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/08/2003 09/12/2003 Baseline Inspections 71152B - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP 71152B Identification and Resolution of Problems 10/20/2003 10/24/2003 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 11/03/2003 11/07/2003 Baseline Inspections 7111401 - EP EXERCISE EVALUATION 5 1, 2 IP 7111401 Exercise Evaluation 10/20/2003 10/24/2003 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/20/2003 10/24/2003 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 12/01/2003 12/05/2003 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 12/01/2003 12/05/2003 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/01/2003 12/05/2003 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/08/2003 12/12/2003 Baseline Inspections 7111111B - L.O. REQUALIFICATION PROGRAM 2 1, 2 IP 7111111B Licensed Operator Requalification 12/14/2003 12/19/2003 Baseline Inspections 71111DS - DESIGN INSPECTION 8 1, 2 IP 71111.DS Safety System Design and Performance Capability 01/12/2004 01/16/2004 Baseline Inspections 1, 2 IP 71111.DS Safety System Design and Performance Capability 01/26/2004 01/30/2004 Baseline Inspections 3/1 EXM - OPERATOR LICENSING INITIAL EXAMS 3 1 U01517 CALVERT CLIFFS UNITS 1&2 INITIAL EXAM (3/1-5/04) 02/02/2004 02/06/2004 Not Applicable 1 U01517 CALVERT CLIFFS UNITS 1&2 INITIAL EXAM (3/1-5/04) 03/01/2004 03/05/2004 Not Applicable 7111107B - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 02/09/2004 02/15/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/22/2004 03/26/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/22/2004 03/26/2004 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/22/2004 03/26/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/12/2004 04/16/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 08/26/2003 13:19:46 Inspection / Activity Plan Report 22 06/29/2003 - 10/02/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112102 ALARA Planning and Controls 04/12/2004 04/16/2004 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/12/2004 04/16/2004 Baseline Inspections 7111108P - INSERVICE INSPECTION-UNIT 1 2 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02) 04/19/2004 04/23/2004 Safety Issues 1 IP 7111108P Inservice Inspection Activities - PWR 04/19/2004 04/23/2004 Baseline Inspections 71111.05 - TRIENNIAL FIRE PROTECTION 3 2 IP 7111105T Fire Protection 05/10/2004 05/14/2004 Baseline Inspections 1, 2 IP 7111105T Fire Protection 05/24/2004 05/28/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/14/2004 06/18/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 06/14/2004 06/18/2004 Baseline Inspections 71114 - EP PROGRAM INSPECT & PI VERIF 1 1, 2 IP 7111402 Alert and Notification System Testing 07/19/2004 07/23/2004 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/19/2004 07/23/2004 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/19/2004 07/23/2004 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/19/2004 07/23/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/19/2004 07/23/2004 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 07/26/2004 07/30/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.